You are on page 1of 14

Date

Mon. 06.06.2022
Tue 07.06.2022
Wed. 08.06.2022
Thu. 09.06.2022
Fri. 10.06.2022
Sat. 11.06.2022
Mon. 13.06.2022
Tue 14.06.2022
Wed. 15.06.2022
Thu. 16.06.2022
Fri.17.06.2022
Sat. 18.06.2022
Mon. 20.06.2022
Tue. 21.06.2022
Wed. 22.06.2022
Thu. 23.06.2022
Fri.24.06.2022
Sat. 25.06.2022
Mon. 27.06.2022
Tue. 28.06.2022
Wed. 29.06.2022
Thu. 30.06.2022
Fri. 01.07.2022
Planned works

CE-Rapping field 1 and 2, upper DE-suspension field 1 and 2


Hopper welding, rest welding inside the head and conservation of the welding in the head
Hopper welding, assembly the lower DE-frame, assembly of the middle part
Hopper welding, assembly of the middle part
Hopper welding, assembly of the middle part
Hopper welding, assembly of the middle part
welding of the middle part, assembly of the gasinlet and outlet hood
welding of the middle part, assembly of the gasinlet and outlet hood
welding of the middle part, assembly of the das distribution
welding of the gas distribution and mounting of the gas inlet and outlet hoods to the middle part
welding of the gas inlet and outlet hoods to the middle part
welding of the gas inlet and outlet hoods to the middle part, conservate all weldings inside the the middle par, mounting t
assembly of CE-plates and install into the middle part
assembly of CE-plates and install into the middle part
assembly of CE-plates and install into the middle part
assembly of CE-plates and install into the middle part
assembly of CE-plates and install into the middle part
assembly of CE-plates and install into the middle part
assembly of CE-plates and install into the middle part
assembly of CE-plates and install into the middle part
assembly of CE-plates and install into the middle part
install the DE-electrodes into the middle part
install the DE-electrodes into the middle part
Date

Mon. 06.06.2022

Tue 07.06.2022

Wed. 08.06.2022

Thu. 09.06.2022

Fri. 10.06.2022

Sat. 11.06.2022

Mon. 13.06.2022

Tue 14.06.2022

Wed. 15.06.2022

Thu. 16.06.2022

Fri.17.06.2022

Sat. 18.06.2022

Mon. 20.06.2022

Tue. 21.06.2022

Wed. 22.06.2022

Thu. 23.06.2022

Fri.24.06.2022

Sat. 25.06.2022

Mon. 27.06.2022

Tue. 28.06.2022

Wed. 29.06.2022
Thu. 30.06.2022

Fri. 01.07.2022
Planned works

CE-Rapping field 1 and 2, upper DE-suspension field 1 and 2

Hopper welding, rest welding inside the head and conservation of the welding in the head

Hopper welding, assembly the lower DE-frame, assembly of the middle part

Hopper welding, assembly of the middle part

Hopper welding, assembly of the middle part

Hopper welding, assembly of the middle part

welding of the middle part, assembly of the gasinlet and outlet hood

welding of the middle part, assembly of the gasinlet and outlet hood

welding of the middle part, assembly of the das distribution

welding of the gas distribution and mounting of the gas inlet and outlet hoods to the middle part

welding of the gas inlet and outlet hoods to the middle part

welding of the gas inlet and outlet hoods to the middle part, conservate all weldings inside the the middle par,
mounting the work table, assembly of DE-plates

assembly of CE-plates and install into the middle part

assembly of CE-plates and install into the middle part

assembly of CE-plates and install into the middle part

assembly of CE-plates and install into the middle part

assembly of CE-plates and install into the middle part

assembly of CE-plates and install into the middle part

assembly of CE-plates and install into the middle part

assembly of CE-plates and install into the middle part

assembly of CE-plates and install into the middle part


install the DE-electrodes into the middle part

install the DE-electrodes into the middle part


Lunes. 06.06.2022

Martes 07.06.2022

Miercoles. 08.06.2022

Jueves. 09.06.2022

Viernes. 10.06.2022

Sabado. 11.06.2022

Lunes. 13.06.2022

Martes 14.06.2022

Miercoles. 15.06.2022

Jueves. 16.06.2022

Viernes.17.06.2022

Sabado. 18.06.2022

Lunes. 20.06.2022

Martes

Miercoles. 22.06.2022

Jueves. 23.06.2022

Viernes.24.06.2022

Sabado. 25.06.2022

Lunes. 27.06.2022

Martes. 28.06.2022

Miercoles. 29.06.2022
Jueves. 30.06.2022

Viernes. 01.07.2022
Soldadura de tolva, Soldadura interior parte superior, pintura de la soldadura interior de la parte superior

Soldadura de tolva, ensamble del marco inferior placas descarga electrodos, ensamble de la parte media

Soldadura de la tolva, ensamble de la parte media

Soldadura de la tolva, ensamble de la parte media

Soldadura de la tolva, ensamble de la parte media

soldadura de la parte media, montaje de la campana de entrada y salida de gas

soldadura de la parte media, montaje de la campana de entrada y salida de gas

Soldadura de la parte media, ensamble de la distribución de gas

soldadura de la distribución de gas y montaje de las campanas de entrada y salida de gas de la parte media

soldadura de las campanas de entrada y salida de gas a la parte media

soldadura de las campanas de entrada y salida de gas a la parte media, continuar todas las soldaduras dentro
de la parte media, montaje de la mesa de trabajo, montaje de placas descarga electrodos

Ensamble placas carga electrodos e instalación dentro de la parte media

Ensamble placas carga electrodos e instalación dentro de la parte media

Ensamble placas carga electrodos e instalación dentro de la parte media

Ensamble placas carga electrodos e instalación dentro de la parte media

Ensamble placas carga electrodos e instalación dentro de la parte media

Ensamble placas carga electrodos e instalación dentro de la parte media

Ensamble placas carga electrodos e instalación dentro de la parte media

Ensamble placas carga electrodos e instalación dentro de la parte media

Ensamble placas carga electrodos e instalación dentro de la parte media


Instalación placas descarga electrodos dentro de la parte media

Instalación placas descarga electrodos dentro de la parte media