CALCULATION FOR SLING TENSION

(UNDER THE LIFTING BEAM)

R1= 6407 X 3248.48 = 3317.59 Kg


250

W 6273.54
R2= 6407 X 3025.06 = 3089.41 Kg
6273.54
REACTION AT EACH LIFTING POINT TENSION OF EACH SLING
(UNDER THE SPREADER BEAM)

R1A= 3317.59 X 1047.45 = 1610.96 Kg T1A= 1610.96 / Sin 61° = 1841.9 Kg


2157.10 1
R1B= 3317.59 X 1167.00 = 1794.83 Kg T1B= 1794.83 / Sin 61° = 2052.13 Kg
T1 2157.10 1
R2A= 3089.41 X 1047.45 = 1500.16 Kg T2A= 1500.16 XSin 60° = 1637.40 Kg
2157.10 1
T2
R2B= 3089.41 X 1167.00 = 1671.38 Kg T2B= 1671.38 X Sin 60° = 1732.24 Kg
2157.10 1

CALCULATION FOR SLING TENSION


R1B (ABOVE THE LIFTING BEAM)
W
According to Lami's theorem = T1 = T2 = W =
T 1B Sin 159° Sin 160° Sin 41°
R1A
= T1 = 6807 =
200

R2B
T1A Sin 159° Sin 41°
T 2B
= T1 = 6807 x Sin 159°
R2A Sin 41°
= T1 = 3.72 t
T 2A

= T2 = 6807 =
Sin 160° Sin 41°
T1 T2
= T2 = 6807 x Sin 160°
Sin 41°
= T2 = 3.49 t
150

TACKLE DETAILS FOR MAIN CRANE

WEIGHT / TOTAL
SL NO: TACKLE SWL QTY
UNIT(kg) WEIGHT

1 HOOK BLOCK 40T 470 1 290 Kg

2 WEBBING SLING 6T X 6 Mtr 12 4 48 Kg

3 WIRE ROPE SLING 12T X 4 Mtr 40 2 80 Kg

4 BOW SHACKLE 9.5 T 3.36 6 15.64 Kg

5 LIFTING BEAM 50 T 256 1 256Kg

R1 R2 TOTAL 689.64 Kg
100

R1B/R2B R1A/R2A

RECORD OF REVISION

TACKLE ARRANGEMENT DRAWING FOR LIFTING OF CHILLER UNIT

PROJECT TITLE:

PROCUREMENT & CONSTRUCTION WORKS FOR


50

TACKLE ARRANGEMENT DRAWING


TITLE :-
FOR REPLACEMENT OF CHILLER UNIT
( TAG NO:

CONTRACT NO. JOB NO. SCALE AS SPECIFIED


DRAWING NO SHTS 2 OF 2
REV. C
0

0 50 100 150 200 250 300 350 420 MM X 297 MM - SIZE A3