You are on page 1of 2

CC-Link IE Field Free Module

United Kingdom
CC-Link in industry
Mitsubishi Electric Europe B.V.
Industrial Automation
Automotive
CC‑Link offers a wide variety of solutions from body-in-
Travellers Lane
Hatfield, Herts. AL10 8XB 1GB performance
for your machine
white assembly through paint to trim and final assembly. Tel: +44 (0) 1707 288 780
Large scale applications with both leading Asian and US Fax: +44 (0) 1707 278 695
manufacturers confirm that CC‑Link is a global standard for Email: automation@meuk.mee.com
the automotive industry. Web: gb3a.mitsubishielectric.com
or process
Food and Beverage Automation Centre – North
With over 260 manufacturers offering a variety of products to Asdale Road CC-Link IE Field is the non stop 1GB
help companies in different industries worldwide maintain Sandal Castle Centre
the required levels of compliance whilst keeping production Wakefield, WF2 7JE
Ethernet network, try it today for free.
operating at maximum efficiency. Performance, sanitary Tel: +44 (0)1707 288780
design and interoperability are all on offer, ready to meet the
needs of the global food & beverage industry. Automation Centre - Scotland
Nettlehill Road,
Water Houstoun Industrial Estate
CC‑Link provides a broad range of partners who can supply Livingston, EH54 5EQ
all the critical aspects of a water management system, from scotland.automation@meuk.mee.com
inverters to I/O. Integration with communications over wide Tel: +44 (0) 1506 448 840
areas and SCADA system integration is also possible to meet
the needs of applications that can range over many miles.

CPG
CC‑Link offers a wide variety of solutions that allow
automated packaging lines to cope with a multitude of
different products through motion control, robotics, machine
vision, ID systems and sequence control. Lines can be neatly
integrated with quality control and documentation systems
as CC‑Link ties it all together, keeping systems productive as
well as flexible.
Performance without Try CC-Link IE Field today for free Simple to configure, fast
compromise to diagnose
When any QnUDV, L-Series PLC or safety PLC is purchased, claim a
1Gbit/s Industrial Ethernet free CC-Link IE Field master*.
Simple to configure
The CC-Link IE Field open network is the first Industrial Ethernet
network to operate at gigabit speeds at the field device level. It Options The new graphical configuration tool embedded in the
combines the best of existing technologies and applies them iQ works software suite allows the network to be quickly
in a highly reliable architecture that provides exceptional data –– Option 1 / Qn Series. configured by simply dragging and dropping the desired
bandwidth. Purchase a Q03UDVCPU, Q04UDVCPU, network modules from the available library into the network
Q06UDVCPU, Q13UDVCPU or Q26UDVCPU and get a overview diagram.
CC-Link IE Field provides seamless control data transmission QJ71GF11-T2 master local module for free.
between controllers such as PLCs and field devices, digital
and analogue I/O, pneumatic valve manifolds, RFID readers, –– Option 2 / L Series.
inverters, motion controllers and other products. Purchase an L02CPU-P, L06CPU-P or L26CPU-P and get a
LJ71GF11-T2 master local module for free.
It connects up to 120 stations on a single network with
deterministic data exchange at gigabit speed without Ethernet –– Option 3 / QS Series.
switches. Purchase a QS001CPU and get a QS0J71GF11-T2 master local
module for free.
Features of CC-Link IE Field
–– Ultra high speed. One gigabit-per-second transmission
and real-time protocol enables control of remote I/O field
devices with essentially no transmission delay.
–– Inherent determinism without switches. This eliminates
the hardware costs, design issues and technical skills
issues associated with such infrastructures. No specialist
IT knowledge is required to design or operate a system. Fast to Diagnose
Determinism is guaranteed by the CC-Link IE Field token
passing technique. Expanded diagnostics available from each network module
–– Seamless communication. CC-Link IE Field enables seamless gives a full description what’s happening on that module,
communication between all field devices and controllers this information includes any faults. This can save time during
to form an integrated gigabit performance network. An commissioning or an unplanned stoppage by informing the
Ethernet adapter enables connection to 100 Mb Ethernet PC Robot engineer what is needed to solve the issues with a single visit.
PLC PLC
devices that employ TCP/IP communications.
–– Flexible topology. CC-Link IE Field allows for a topology
best suited to the needs of the application thus ensuring
greatest flexibility. These include star, line, mixed star and PLC Safety PLC PLC HMI To order
line and ring.
–– Sub-master function. Network operation can continue Visit: gb3a.mitsubishielectric.com
even if the master station stops. This is configured simply Safety
General
Remote I/O
Wireless Application

by using a master and sub-master on the same network. Remote I/O


Emergency
Email: automation@meuk.mee.com
stop switch PC
Hence network operation is uninterrupted even in the case Robot
Tablet
terminal
Servo Servo Servo
of a controller failure. Motion Control Safety Control
Light Curtain
Equipment Control
Servo
TCP/IP Or scan the QR Code
(future plan)

*Offer expires April 2015

You might also like