Terms of Reference

Project: Improvement of Supply waterline for Mets 2


Target Implementation: April 2022
Scope:
1. Supply, Delivery and Installation of Pumps, Piping system, and Water Softener
2. Canopy Extension and Roofing for pumps and water softener.
3. Dismantling of Existing Carbon Steel tank
Specification:

Particulars Specification Quantity Unit

Canopy Extension with 5m (L) x 3.2m (W) x 3.2m (H) 1 lot


roofing Steel Canopy with cement platform and hand rails

Transfer pump Horizontal Centrifugal pump 2 sets


3 phase, 220V (1 reserve unit )

Booster pump *Vertical Centrifugal pump with Control panel 2 sets


3 phase, 220V (1 reserve unit )
(*Provision for Water Softener System)

Pressure Tanks 220 gal 2 sets


Max: 180 (1 reserve unit )

Pipes and Fittings Gray uPVC / PPR 1 lot


Supply water pipeline, drain pipes for WS, pipe bracket
and hangers.

Water Softener System Capacity: 15 cmh 1 lot


with Multimedia Filter Operation: Manual Operation
*Water Source = Deep well water
*Water Hardness = 200 to 230ppm (desired 0ppm)
*TDS = 160ppm to 250ppm

Controls and Float Valve, Float Switch, Electrical wirings, Pressure 2 lot
instrumentations gauges, pressure switch, check valves etc.

pg. 1
Project layout:

pg. 2
pg. 3
Figure 1: For dismantling

pg. 4