S01-1 AERATION TANK SECTION

S01-1 AERATION TANK PLAN VIEW 02


01

BASE TO WALL
S01-1 CONSTRUCTION JOINT DETAIL
04

BASE AND WALL


S01-1 STRUCTURAL SECTION DETAILS
03 TYPICAL PIPE
S01-1 THRU RC WALL DETAIL
1 AERATION TANK DETAILS 05
S-01 AS SHOWN
Owner / Developer Civil Engineer REPUBLIC ACT 9266, SECTION 20 (4) Project Title: Noted By: Sheet Content: Sheet No.

S-01
ENGR. NORADEL P. OSTACO
AS SHOWN
- Department Head

Reg No. - Valid Until -


PROPOSED AERATION TANK HERNAN TALAVERA
Branch Manager Checked By: 01 OF 01
PRIMEWATER INFRASTRUCTURE CORP. PRESIDENTIAL DECREE NO. 49 HIMAMAYLAN, NEGROS OCCIDENTAL -
PTR - Issued on: - ENGR. JOEL G. GELLECANAO, DPA
STRUCTURAL
9th Floor Vista Campus Tower 1, Levi B. Mariano Ave, Brgy Ususan. Taguig City Drawn By: Date:
Tel.: (02) 8851 5055, (02) 7368-2779
TIN - Issued at: - General Manager N.P.OSTACO Apr 07, 2022
primewatercorp.com