Professional Documents
Culture Documents
06/20/2021 1
CHAPTER ONE
INTRODUCTION
1.1BACKGROUND OF THE COMPANY
Kombolcha textile share company was established 1976 E.C in
need and with the aim of exporting good quality of fabric and
yarn.
Since 2003 E.C up to now they become integral textile company
06/20/2021 3
Cont....
06/20/2021 4
CHAPTER TWO
OVER ALL INTERNSHIP EXPERIENCE
2.1. Section of the company we have been working
1/ Spinning department
2/ Weaving department
3/ Garment and processing department
4/ Machine shop and mechanical work shop
06/20/2021 5
Cont....
06/20/2021 6
Cont....
Multi-function
Pre- cleaner
Mixer
Cleanomate
Condenser
Foreign separator
06/20/2021 7
Cont....
Main Processes and intermediate products in spinning plants
are:-
06/20/2021 8
Cont....
Work flow of weaving department
06/20/2021 9
Cont....
06/20/2021 10
Cont....
2.3 Challenges we have been faced
The main challenges we have been faced is corona virus/
back.
Loudness of the machine harm our hearing ability until we
adapts.
Lack of safety shoes and clothes.
06/20/2021 11
CHAPTER THREE
OVERALL BENEFIT OF INTERNSHIP
3.1. In terms of improving our practical skills
Understanding methods of laying raw material in bale store.
06/20/2021 12
Cont....
3.3. In terms of improving team playing skill
Overcoming work loads.
Save time.
06/20/2021 13
Cont....
3.5. In terms of work ethics issue
honesty
accountability
Punctuality
06/20/2021 14
Cont....
3.7. Conclusion
Internship program is the main way of developing theoretical
knowledge for engineering student to all Ethiopian higher
education institution.
we have got the following benefits:-
Know our potential and gain motivation to continue learning.
machines.
Develop our communication skill.
06/20/2021 15
CHAPTER FOUR
DESIGN OF VACUUM COTTON
CLEANER
4.1. Introduction
The vacuum cleaner, also known as a sweeper or hoover, is a
06/20/2021 16
Cont....
4.2. Statement of the problem
Cottony dust or cottony aerosol is one of the major problems
06/20/2021 17
Cont....
4.3 Objectives of the project
4.3.1 General objective
The main objective of this project is to design vacuum cotton
2016.
06/20/2021 18
Cont....
4.4. Literature Review
The first manual models, using bellows, were developed in the
1899 and 1900 for another blown air system that seems to have
featured the first use of an electric motor.
The first vacuum-cleaning device to be portable and marketed at
06/20/2021 19
Cont....
4.5 methodology of the project
06/20/2021 20
Cont....
General specification of components
06/20/2021 21
Cont....
4.6 working principle of the project
06/20/2021 22
Cont....
06/20/2021 23
Cont....
06/20/2021 24
Cont...
4.7. Design analysis
Design for roller shafts
P= 2πNT/60
𝑇=9.0187𝑁𝑚,
d= 25𝑚𝑚
Selection of garbage housing
Dimension: - Length =445mm
Width = 445mm
Height = 1210mm
Design of impeller blade
U1=1.1V1=1.1C1,For better induction flow
U1=πD1N/60
U1=65.973m/s
U2= πD2N /60
U2=85.765m/s
b = 90mm
06/20/2021 25
Cont....
Design of fan housing (casing)
Analyzing steady flow energy equations at inlet and exit
𝑉4 =54.85m/s
D3 = 465mm
D4 = 735mm
For ball bearing C=3722.17 𝑁 <16000 𝑁 where C = Basic dynamic
load rating
Bending stress analysis:
M=FL
M=40,000Nmm
06/20/2021 26
Cont.....
Stress analysis of table base
is calculated as:
Maximum vertical bending = RA X (L/2)
Maximum vertical bending = 122.6 N X (0.9m)
= 110.36Nm
06/20/2021 27
Cont....
06/20/2021 28
Cont....
06/20/2021 29
CHAPTER FIVE
Conclusion and Recommendation
5.1Conclusion
This machine helps to minimize the efforts required by
06/20/2021 30
Cont....
5.2 Recommendation
Our machine was automatically operated. Based on the
06/20/2021 31
THANK YOU!
06/20/2021 32