Professional Documents
Culture Documents
S2
Trench-2 Trench-1 1 Apron
- 2
AR15-01 AR15-01 -
AR25-01
-
∅6"SteelGuard pipe(TYP)
Total4
F01-R01-
LPG
BOTTLE 2MF/ABC4 2MF/ABC4 F01-R04- 2MF/ABC4 2MF/ABC4 2MF/ABC4 2MF/ABC4 2MF/ABC4 2MF/ABC4 2MF/ABC4
STORAGE SHELTER FORKLTFTPARKING 2MF/ABC3
BATTERY CHARGING ROOM
F01-TRUCK SHELTER
F01-R03-WAREHOUSE
F01-R02-SHIPPING & RECEIVING SPACE
Slope
S2
AR25
-
2 Trench-2
- AR15-01 1:8 TRENCH 1
AR15-01 -
1:8
1 Trench-1
- AR15-01
Kemarin 2MF/ABC3
5
-
Trench
AR16-01
DITCH EL
F03-DIESELGENERATOR ROOM
0.3%
0.3%
0.3%
0.5%
0.5%
0.5%
F02-TRANSFORMER ROOM
F01-CABLE LAYER
REMOVABLE
0.5%
0.5%
0.5%
WIREMESH FENCE
H=2100w/ BOUND
RC CONTROL
WALL H=400
0.5% 0.5%
CONNECTED
TO
EXISTING STORM WATER DRAINAGE
DITCH
EL
Sump pit 600X600X600 6
AR16-01 -
Start
Apron
H=1.0m
Reinforced concretewall
-
5
AR16-01
Trench-1
1MF/ABC4
Apron
1MF/ABC4
-
7
AR16-01
Trench detail
Apron
Boxvalve
AR16-01
-
9
-
6
REMOVBLEHANDRAIL
- 5
DITCHEL Trench H=1100 DITCH
EL
RC CONTROL
RC CONTROL AR16-01 BOX 600x600 CONNECTED TO EXISTINGSTORM WATERDRAINAGE
BOX 300x300
0.5% 0.5%
0.5% 0.5%
0.5%
REMOVABLE WIREMESHFENCE
F01-CAPACITOR ROOM H=2100w/BOUND WALLH=400
0.3% 0.5% F04-TRANSFORMERROOM
0.5% 0.3%
F05-HPA STATION RAISED FLOOR
0.5% GRAVEL
50mm
0.5% F02-BAT
ROOM
0.5% 0.5%
F03-HVROOM RAISED FLOOR
DITCH
EL
RC
DRAINAGEW=300 H=300 STEELPIPE HANDRAIL REMOVBLE HANDRAIL
LIGHTDUTY GALV.STEEL GRATING H=1100 H=1100
21/02/2024 21/02/2024
CANCELLED
19/2/24
No need to
resubmit E
X
P
A
O
3P
N
R
C
N
S
-O
LIE
JC
T
this drawing
PT.PAKUBUMI SEMESTA
22/02/2024
PEMILIK/
DIGAMBAR DIPERIKSA PM MK/KONSULTAN
PEMBERI KERJA