*STP : Stirrup *STP : Stirrup

*SFR : Side Face Reinf. *SFR : Side Face Reinf.


BEAM SCHEDULE (C28:Fy414) *EF : Each Face BEAM SCHEDULE (C28:Fy414) *EF : Each Face

BEAM SHEAR STIRRUPS BEAM SHEAR STIRRUPS


REMARKS REMARKS
NUMBERS NUMBERS
250 200
RG-1 IRB-1
2-#16
2-#16 STP 2L-#12

300
SFR 1-#16EF

400
STP 2L-#12
B20,B21 B37 2-#16
2-#16
2L-#12@80 C/C at SUPPORTS,
RG-2 200 IRB-2 200
2L-#12@115 C/C at MIDSPAN

B1
2-#16 2-#16

B24
B2 B3 B4 B5 STP 2L-#12

300
C1

400
SFR 1-#16EF STP 2L-#12
C2 C3 C4 C5 B22,B23,B24 B17,B18,B19 2-#16
2-#16

RG-3 250
B21

B34
B23

B28

B31

B36
2-#16
STP 2L-#12

400
SFR 1-#16EF
B26,B27,B28
B6 B7 B8 B9 B10 B11 2-#16
C6 C7 C8 C9 C10 C11
200

B37
RG-4

2-#16
STP 2L-#12

400
SFR 1-#16EF
B29,B30,B31
B20

B27

B30

B33
B22

B35
2-#16

250
RG-5

2-#20
B12 B13 B14 B15 B16 STP 2L-#12

400
SFR 1-#16EF
C12 C13 C14 C15 C16 B32,B33,B34
B26

B29

B32
B25

B17 B18 B19 3-#16

RG-6 250
2L-#12@80 C/C at SUPPORTS,
2L-#12@115 C/C at MIDSPAN
3-#20
STP 2L-#12

400
SFR 1-#20EF
B35,B36
3-#20
1 ROOF BEAM FRAMING PLAN RG-7 200
S-5 NTS

2-#16
STP 2L-#12

400
B1
2-#16

RG-8 250

2-#16
STP 2L-#12

400
SFR 1-#16EF
B2-B5,B25
2-#16

250
RG-9

3-#16
STP 2L-#12

400
SFR 1-#16EF
B6-B11
2-#16

RG-10 250

3-#16
2-#16
STP 2L-#12

400
B12-B16 SFR 1-#16EF
2-#16

2 ROOF BEAM SCHEDULE


S-5 NTS

ARCHITECT: PRC NO. REPUBLIC ACT 545 , Section 25 (4) PROJECT TITLE REVISION DATE DESCRIPTION SHEET CONTENTS SHEET NO.
IAPOA NO. DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF
TIN PROFESSIONAL SERVICE ARE THE PROPERTY OF
WHETHER
PTR NO. THE WORK FOR WHICH THEY ARE MADE MAY
LOCATION :
BE EXECUTED OR NOT. IT SHALL BE UNLAWFUL
FOR ANY PERSON TO REPRODUCED OR USED DRAWN BY :
DATE CHECKED BY : CAD FILE :
ON OTHER WORK EXCEPT WITH A WRITTEN DESIGNED BY :

PLACE AGREEMENT WITH THE ARCHITECT. OWNER : DATE : DATE : PROJECT NO.