400X400 FOOTING DIMENSION FOOTING REINFORCEMENT
REFER DRAWING NO STS/YYXXXXX/GN/------ TO STS/YYXXXXX/GN/------ FOR
NC2
COLUMN FOOTING REMARKS
NC1 BOTTOM GENERAL RCC NOTES & TYPICAL DETAILS
400X400 450X450 NUMBERS TYPE L B D
ALONG B ALONG L T10@200C/C SHEAR CONNECTOR
NOMINAL COVERS
TO BE ANCHORED IN EXISTING SR NO. DESCRIPTION MILD MODERATE SEVERE
1200X1200 1200X1200 NC1,NC3,NC6,NC8 Pad 1200 1200 400 T10@150 C/C T10@150 C/C - FOOTING FOR MIN. 175MM BY
1 FOOTINGS 50 50 50
1400X1400 DRILLING & GROUTING HILTI
WORTH RE500. 2 COLUMNS & WALLS >200MM WIDTH
40 40 45
PLUM CONCRETE (TO LINKS OF COLUMN)
EXISTING FOOTING COLUMNS & WALLS WITH WIDTH OF 200MM
NC2,NC4,NC5,NC7 Pad 1400 1400 450 T10@125 C/C T10@125 C/C - & BELOW HAVING REINF. OF DIA. 16MM &
3 40 40 45
ABOVE. (TO LINKS OF COLUMN)
COLUMNS & WALLS WITH WIDTH OF 200MM
150THK PCC 4 & BELOW HAVING REINF. OF DIA. 12MM. 25 30 45
(TO LINKS OF COLUMN)
BEAM SCHEDULE SECTION A-A
5 SLABS 20 30 45
6 BEAMS (TO STIRRUPS OF BEAM) 20 30 45
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS 7 LIFT WALLS 40 40 45
DEVELOPMENT LENGTH
REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
REINF. GRADE M20 M25 M30 M35 M40 & ABOVE
FE 500D 57 X D 49 X D 46 X D 40 X D 36 X D
IMPORTANT NOTES:
NB1,NB3 300 750 3-T20 +3-T20 3-T20 +3-T16 3-T16 +3-T16 2L-T10 @ 150 C/C 2L-T10 @ 150 C/C 2L-T10 @ 150 C/C 2-T8 S.F.R.
NC4 3-T16 2-T16 2-T16 THE USE OF THIS DRAWING FOR CONSTRUCTION SHALL EXPLICITLY CONFIRM THE OWNER'S/
NC5 ON EACH FACE BUILDER'S/CONTRACTOR'S ACCEPTANCE OF THE FOLLOWING CONDITIONS.
450X450
EXISTING FOOTING
1. OUR RESPONSIBILITY SHALL BE LIMITED TO SAFE AND SOUND STRUCTURAL DESIGN AS
450X450 300 750 3-T20
NB2,NB4 +3-T20 3-T20 +3-T16 3-T16 +3-T16 2L-T10 @ 150 C/C 2L-T10 @ 150 C/C 2L-T10 @ 150 C/C 2-T8 S.F.R. EXPRESSED IN THIS DRAWING, AND WE WILL NOT BE HELD LIABLE FOR,
A A 3-T16 2-T16 2-T16 ON EACH FACE a. OLD STRUCTURES SAFETY DURING DEMOLITION
NB6,NB8 300 750 3-T20 +3-T20 3-T20 +3-T16 3-T16 +3-T16 2L-T10 @ 150 C/C 2L-T10 @ 150 C/C 2L-T10 @ 150 C/C 3-T8 S.F.R. CENTERING ERECTED ON SITE, AND ANY PERSONNEL INJURY RESULTING FROM ANY ACCIDENT
3-T16 2-T16 2-T16 ON EACH FACE e. ANY ACCIDENT CAUSED BY PREMATURE DESHUTTERING, FAULTY / SUBSTANDARD
CONSTRUCTION MATERIAL OR WORKMANSHIP / FAULTY CONSTRUCTION PROCEDURE.
NB9,NB12 300 900 3-T25 +3-T25 3-T25 +3-T20 3-T20 +3-T20 2L-T10 @ 125 C/C 2L-T10 @ 200 C/C 2L-T10 @ 125 C/C 3-T8 S.F.R. f. ANY ACCIDENT CAUSED BY THE CONSTRUCTION OF BUILDING ELEMENTS NOT DESIGNED BY US.
3-T20 3-T16 3-T16 ON EACH FACE 2. THIS DRAWING SHALL NOT BE USED FOR ANY CONSTRUCTION UNLESS THE OWNER/
BUILDER/ARCHITECT OBTAINS THE NECESSARY STATUTORY APPROVALS FROM REGULATING
AUTHORITIES.
NB10,NB11 300 900 3-T25 +3-T25 3-T25 3-T20 3-T20 3-T20 2L-T10 @ 125 C/C 2L-T10 @ 200 C/C 2L-T10 @ 125 C/C 3-T8 S.F.R.
3-T20 ON EACH FACE
3. WE ARE INDEMNIFIED FROM ANY LEGAL LIABILITY IN THE EVENT OF UNAUTHORIZED
CONSTRUCTION.
400X400 400X400 5. ALL STRUCTURAL CONCRETE SHOULD BE WEIGH BATCHED, MIXED IN A MACHINE, AND
NC6 NC8 NB15,NB16,NB17 300 750 3-T20 +3-T20 3-T20 +3-T16 3-T16 +3-T16 2L-T10 @ 150 C/C 2L-T10 @ 150 C/C 2L-T10 @ 150 C/C 2-T8 S.F.R. VIBRATED MECHANICALLY.
NB18 3-T16 2-T16 2-T16 ON EACH FACE 6. BEFORE CONSTRUCTION, ANY DISCREPANCY BETWEEN OUR DRAWING AND THE ARCHITECTS'
DRAWING SHALL BE BROUGHT TO OUR ATTENTION.
400
450
T10 @ 150 C/C ALL STR. @ TOP @ TOP & BTM. TENDER LOAD. R10
T12 T16 R9
S2 230 T12 @ 150 C/C ALL STR. @ BTM. T10 @ 150 C/C DIST. ONE WAY DESIGNED FOR FIRE
NC1 NC2 400 450
NB1 NB2 T10 @ 150 C/C ALL STR. @ TOP @ TOP & BTM. TENDER LOAD. R8
L R L R NC3 8-T12 8-T16
R R7
R
R
R
L
L
400X400 450X450 R6
S1
S1
NC1,NC3,NC6,NC8 NC2,NC4,NC5,NC7
5 NB R5
1 16
NB COLUMN SCHEDULE COLUMN SCHEDULE R4
R3 25.12.2023
R
S1
S1
R2 22.12.2023
L 9
NB8
NB6
NB
R
E.
MAX. SLOPE
OR
1:6 COLUMN
M
ER 0d
IS
GRADE OF CONCRETE : M30 GRADE OF STEEL : FE 500d
EV R 1
S2
TIE BEAM
R
CH O
HI m
EXPOSURE CONDITION : MILD SAFE BEARING CAPACITY : -- kN/m2
0
W 5m
1
LD
LD
NB
7
LIVE LOAD : -- kN/m2 FLOOR FINISH : -- kN/m2
BEAM DEPTH
TYPICAL LINK DETAILS DRAWING STATUS
CERTIFIED FOR DESIGN ADEQUACY
L
L
S2
100
NC5 DRAWN BY DESIGNED BY CHECKED BY DATE
R GETS REDUCED IN EITHER DIMENSION,
NC4
R
L
L/3 L
L/3 L/3
MAGNUM
NB5
MID HEIGHT
13
JAY AERAM
12
NB
R STAGGERED LAPPING
L
ARCHITECT OF RECORD
S1
L
S1
LD
JAY AERAM
LD
LD
LD
NB PROJECT
17 18
NB PROPOSED PROJECT AT GAT NO.659(P1+P2)
L/6 L/6 KESNAND,PUNE