Professional Documents
Culture Documents
Project Address:
NOTES
1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
LOT 99 DP 1248789, 5 UHRIG THE STANDARD NOTES ON SHEET S0001 & S0002
2. REFER TO PLANS FOR TYPE MARK LOCATIONS
ROAD, LIDCOMBE 2141
Project Title:
Drawing Title:
COLUMN
COLUMNS ONLY
LAP LENGTH
300x300x20 CAP PL
+ 2N16 U-BARS AT 200 CROSS CENTRES
Date DP
Rev Description Reg No 20mm NOMINAL NONI-SHRINK LEVELING GROUT IF REQUIRED
dd.mm.yy Full Name
P1 18.03.22 ISSUED FOR COORDINATION
50
P2 08.04.22 ISSUED FOR COORDINATION SLAB. REINFORCING NOT
CC2 DRAFT SHOWN FOR CLARITY
50
4 09.08.23 FOR CONSTRUCTION NICHOLAS DEP0000289 2 TIES AT 75mm CENTRES
MORPHETT 20 BASE PL, 5CFW TO 1SC1
4-M16 HILTI HAS-U 5.8 THREADED ANCHOR RODS
130 MIN EMBEDMENT INTO CONCRETE
WITH HIT-RE 500 V4 EPOXY
2 TIES AT
75mm CENTRES
Status:
FOR CONSTRUCTION
50 250 50
COLUMN
Developer :
NORMAL CENTRES
OVER LAP LENGTH
NORMAL CENTRES
OVER LAP LENGTH
TIES AT HALF
LAP LENGTH
TIES AT HALF
LAP LENGTH
50
AT CENTRE OF BEAM/SLAB
Architect :
LAP LENGTH
3 TIES AT 75 CENTRES
AT CRANKED BARS SLAB. REINFORCING NOT SLAB. REINFORCING NOT
50
50
SHOWN FOR CLARITY SHOWN FOR CLARITY
SLAB or FOOTING
50
300 COG
LOCATE STARTERS ON BOTTOM
STARTER BARS REINFORCEMENT OF SLAB
SIZE AND SPACING
TO MATCH COLUMN CONTINUOUS BARS FROM
REINFORCEMENT CONTINUOUS BARS FROM BELOW
INSITU CONCRETE WALL BELOW
300 COG
WALL
Key Plans: 2 TIES LOCATE STARTERS ON BOTTOM CONTINUOUS BARS FROM
SIZE TO MATCH COLUMN REINFORCEMENT OF SLAB INSITU CONCRETE WALL BELOW
ZONE B ZONE A TIES, SPACING AS SHOWN.
TH
ZONE D ZONE C
COLUMN TRANSITION DETAIL - BASE COLUMN TRANSITION DETAIL - BETWEEN SLABS - T1 COLUMN TRANSITION DETAIL - WALL TO COLUMN TYPE 2 COLUMN TRANSITION DETAIL - WALL TO COLUMN TYPE 1
N OR
TOWER 2 TOWER 1
COMMERCIAL
TOWER 5
TOWER
TOWER 4
3