Schedule of Earth Stations

S.No AREA Sr. No Material EQUIPMENTS


2 Pole Structure E01 GI Body Ground for Two Pole Str.
1
E02 GI Body Ground for Two Pole Str.
2
11 KV Lightening Arrester (On Two Pole Structure) E03 GI Body Ground
3
E04 GI Body Ground
4
E05 GI
5 11KV HT Meter Body Ground for Panel
E06 GI Body Ground for Panel
6
11KV HT Breaker Panel near meter E07 GI Body Ground for Panel
7
E08 GI Body Ground for Panel
8
11KV HT Breaker Panel Near Transformer E09 GI Body Ground for Panel
9
E10 GI Body Ground for Panel
10
E11 GI
11 Transformer Body
E12 GI
12 Transformer-1 Earth Pits, 4 Nos. Earth Pit Required 2 Nos. Transformer Body
for Neutral & 2 Nos. for Body. E13 Cu Transformer Neutral
13
E14 Cu Transformer Neutral
14
E15
15 GI Body Ground
E16
16 D.G. Sets Earth Pits 4 Nos. Earth Pit Required for Each GI Body Ground
D.G. sets, E17
17 GI Body Ground
E18
18 GI Body Ground
19 E19 Cu Neutral Ground
20 2 Nos. for Neutral & 2 Nos. for Body. Total 4 Nos. for E20 Cu Neutral Ground
21 Neutral & 4 Nos. for Body E21 Cu Neutral Ground
22 E22 Cu Neutral Ground
E23
23 Main LT Panel GI Body Ground
E24 Body Ground
24 Main LT Panel GI
E25
25 Power & Light Panel GI Body Ground
E26 Cu
26 UPS Body Ground