Professional Documents
Culture Documents
DEPARTEMENT TRAKSI
REGIONAL III
LAPORAN BREAK DOWN UNIT REGIONAL III
Tanggal : 8-Jun-2022
Hari : Rabu
ESTATE POSISI UNIT MACHINE TANGGAL MULAI TROUBLE CENTRAL WORKSHOP STATUS PR STATUS PO
LOKASI RUSAK BREAK DOWN ACTION
NO. MERK TYPE NO UNIT AGING COMPONENT JENIS KERUSAKAN REMAKS NO TANGGAL AGING PO
NO
Alat Berat
1 KTE KTE TAKEUCHI TB250 HE-08-KTE 6-May-2022 33 Kopling, Alternator Pengajuan PR Spare Part Waiting Part
Kendaraan
Ligh Vehicle
1 RO CWS Mitsubishi KB4T B 9868 HP 24-Mar-2021 441 Engine Over Haul Engine Pengajuan PR Sparepart Waiting Part 236 30-Jun-2021 343 352
2 PKS PKY Toyota HILUX KH 8908 GP 28-Dec-2021 162 Engine Top over haul Perbaikan di Wira Toyota Proses perbaikan 34 132
27-Jan-2022
3 BHE BHE Mechron UTV 2200 KT-04-BHE 8-Aug-2021 304 Monting transmisi, hose Pengajuan PR Sparepart Waiting Part 321 18-Aug-2021 294 429
3 BHE BHE Mechron UTV 2200 KT-05-BHE 12-Jan-2020 878 hose dan gir Pengajuan PR Sparepart Waiting Part 202 14-Jun-2021 359 316
4 BSE CWS Mechron UTV 2200 KT-02-BSE 25-Nov-2021 195 Waterpump radiator Pengajuan PR Sparepart Waiting Part 384 5-Nov-2021 215 507
5 BHE BHE WAW WAW TW-04-BHE 21-Nov-2021 199 V belt Transmisi Pengajuan PR Sparepart Waiting Part 400 14-Dec-2021 176 007
6 BHE BHE WAW WAW TW-04-BHE Engine Over Haul Engine Waiting Part
Genset
1 BSE BSE Cummins 85 kva GS-03-BSE 11-Jan-2022 148 Engine Over Haul Engine
STATUS PO
PO AGING SUPPLIER REMAKS REMAKS
TANGGAL