C-800X
Project No: JI20377 Record No*:NA
Tag No.:
Sub-System No:
Sl. Un Petrofac
Description of check Satisfactory satisfactory Quality
No.
Setting out &Site markings.
1
Tapping in existing connection with flange.
2
Laying of pipes as per latest approved IFC/Shop drawings
3
Installation of hydrants as per latest approved IFC/Shop
4
drawings.
Installation of Valves as per latest approved IFC/Shop
5 drawings
Installation of Emitters as per latest approved IFC/Shop
6 drawings
Installation of Controllers as per latest approved IFC/Shop
7 drawings
Remarks:
*If an RFI has 2 # ITRs, record number for those ITRs shall be “RFI number/1” and “RFI number/2” Test reports will have test
house identification numbers.
Signature
Date
DRP001-OUF-TAR-RPT-Q-000-043 Page 1 of 1 Ref. ITP No: PEC-QU-ITP-X-