INSPECTION & TEST RECORD - CIVIL

ITR No: C-0102X


SURVEY INSPECTION RECORD
PEC-QU-ITR-X-11083 Rev 2

C-0102X
Sub-Contractor: Target LLC Project: JI20377
Sub System No # NA Tag No #: N/A
Description: UG GA for Depot Control Building—Fire water system (6inch pipe)
Drawing No: DRP001-OUF-680040-P-GAD-003-001-R1 Rev:
RFI #: C-TAR- Date: 21.July.2019
Structure/ Member:
Area: 40

+
Northing Easting Elevation Remarks
No Description As per As per As per
Actual Difference Actual Difference Actual Difference
Drawing Drawing Drawing
1 0+00 1621.402 2550.150 93.100 94.422 +1.322
2 0+10 1621.402 2560.150 93.100 94.315 +1.215
3 0+20 1621.402 2570.150 93.100 94.420 +1.320
4 0+30 1621.402 2580.150 93.100 94.355 +1.255
5 0+40 1621.402 2590.150 93.100 94.462 +1.362
6 0+50 1621.402 2600.150 93.100 94.380 +1.280
7 0+60 1621.402 2610.150 93.100 94.425 +1.325
0+70 1621.402 2620.150 93.100 94.419 +1.319
0+80 1621.402 2630.150 93.100 94.397 +1.319
0+86.615 1621.402 2636.764 93.100 94.278 +1.178

Notes:

*If RFI has 2 ITR numbers, record number for those ITRs shall be “RFI number/1” and “RFI number/2”. Test reports will have test house identification numbers.
Company Signature: Applicable Not Applicable

Record Acceptance Sub-Contractor Surveyor Petrofac Construction / Surveyor COMPANY


Name: Agha Gulshad Ali

Signature:

Date:
DRP001-OUF-TAR-RPT-Q-000-002 Page 1 of 1 Ref. ITP No: PEC-QU-ITP-X-11083