PKG-IV
1 00+000 00+720 B/S
720.00
2 00+720 00+770 B/S 0
50.00
3 01+010 01+160 B/S 0
150.00
4 01+160 01+590 B/S 430
430.00
5 01+590 01+635 B/S 0
45.00
6 01+635 01+740 B/S
105.00
7 01+740 01+780 B/S
40.00
8 01+780 02+750 B/S 970
970.00
9 02+800 03+620 B/S 820
820.00
10 03+670 04+030 B/S
360.00
11 04+030 05+280 B/S 1250
1250.00
12 05+280 05+329 B/S
49.00
13 05+329 05+387 B/S 58.00
14 05+387 05+460 B/S 73.00
15 05+460 05+580 B/S 120.00 120
16 05+760 06+330 B/S 570.00 570
17 06+510 06+810 B/S 300.00 300
18 06+900 08+830 B/S 1930.00 1930
19 08+880 09+340 B/S 460.00 460
20 09+550 09+580 B/S 30.00
21 09+580 09+690 B/S 110.00
22 09+690 10+470 B/S 780.00
23 10+470 12+000 B/S 1530.00 1530
total qty 10950.00 8380.00
2) TKMG
Balance In Progress Remarks
720 No Work
50
150
45
105 Bridge
40 ACBC
360 ACBC
49 ACBC
58 Bridge
73 ACBC
30 ACBC
110 Bridge
780 ACBC
2570.00
PKG-IV
1 00+070 00+350 280.00 280.00 Balance
Khar Bazar Area
2 00+480 00+530 50.00 50.00 Balance
3 00+770 01+010 240.00 240
4 02+750 02+800 50.00 50
5 03+620 03+670 50.00 50
6 05+580 05+760 180.00 180 Full Width
7 06+330 06+510 180.00 180
8 06+810 06+900 90.00 90
9 08+830 08+880 50.00 50
10 09+340 09+550 210.00 210
total length 1380.00 1050.00 330.00
CONSTRUCTION OF TIMERGARA-KHAR-MAMAD GAT
2 07+630
3 11+877
PIPE CULVERT
4 01+040
5 01+000
6 01+153
7 02+040
8 02+254
9 03+135
10 04+125
11 04+935
12 05+110
13 06+730
14 07+400
15 07+630
16 08+200
17 10+375
18 10+720
19 11+115
20 11+604
BOX CULVERT
21 02+335
22 03+294
23 07+900
24 11+922
CONSTRUCTION OF TIMERGARA-KHAR-MAMAD GAT
stone pitching