PROPOSED DETOUR ROAD INTERSECT WITH EXISTING BRIDGE (STA. 0+000.00 TO STA. 0+678.99)
Department of Public Works and Highways
Client
Regional Office - II
Description Embankment - from Borrow (Selected common) Required Qty 6,796.88 cu.m.
Unit cu.m.
Description: Embankment - from Borrow (selected common) Required Qty: 2,214.50 cu.m.
Unit: cu.m.
Backfilling
STATION LENGTH (m)
AREA (m²) VOLUME (m³)-fill
ALIGNMENT A
0 + 000.00 0.000
0 + 020.00 20.00 0.000 0.000
0 + 040.00 20.00 1.370 13.700
0 + 060.00 20.00 5.616 69.860
0 + 080.00 20.00 9.587 152.030
0 + 100.00 20.00 9.076 186.630
0 + 120.00 20.00 8.693 177.690
0 + 140.00 20.00 7.606 162.990
0 + 160.00 20.00 6.299 139.050
0 + 180.00 20.00 4.389 106.880
0 + 200.00 20.00 6.498 108.870
0 + 220.00 20.00 9.934 164.320
0 + 240.00 20.00 13.486 234.200
0 + 260.00 20.00 19.053 325.390
0 + 280.00 20.00 16.116 351.690
0 + 300.00 20.00 1.951 180.670
0 + 300.83 0.83 1.556 1.455
SUB-TOTAL 2,375.425
ROADWAY EXCAVATION
STATION LENGTH (m)
AREA (m²) - CUT) VOLUME (m³) - CUT
0 + 000.00 5.381
0 + 020.00 20.00 4.373 97.540
0 + 040.00 20.00 0.425 47.980
0 + 060.00 20.00 4.250
0 + 080.00 20.00 0.000
0 + 100.00 20.00 0.000
0 + 120.00 20.00 0.000
0 + 140.00 20.00 0.000
0 + 160.00 20.00 0.000
0 + 180.00 20.00 0.659 6.590
0 + 200.00 20.00 6.590
0 + 220.00 20.00 0.000
0 + 240.00 20.00 0.000
0 + 260.00 20.00 0.000
0 + 280.00 20.00 0.000
0 + 300.00 20.00 3.534 35.340
0 + 300.83 0.83 3.386 2.872
SUB-TOTAL 201.162
DETOUR ROAD A
104(2)a - Embankment - from Borrow (Selected common)
104(1)a - Embankment - from Roadway Excavation (Common Soil)