104(1)a
STATION LENGTH
AREA VOL
1+950.00 0.00 70.696
1+960.00 10.00 34.935 528.16
1+980.00 20.00 31.594 665.29
2+000.00 20.00 26.929 585.23
2+020.00 20.00 20.429 473.58
2+040.00 20.00 4.297 247.26
2+060.00 20.00 - 42.97
2+080.00 20.00 - -
2+100.00 20.00 0.575 5.75
2+120.00 20.00 - 5.75
2+140.00 20.00 0.091 0.91
2+160.00 20.00 - 0.91
2+180.00 20.00 - -
2+200.00 20.00 - -
2+220.00 20.00 - -
2+240.00 20.00 - -
2+260.00 20.00 - -
2+280.00 20.00 - -
2+300.00 20.00 - -
2+320.00 20.00 3.463 34.63
2+340.00 20.00 3.630 70.93
2+360.00 20.00 7.321 109.51
2+380.00 20.00 6.22 135.39
2+400.00 20.00 17.188 234.06
2+420.00 20.00 4.118 213.06
2+440.00 20.00 - 41.18
2+457.53 17.53 8.794 77.08
2+460.00 2.47 - 10.86
2+480.00 20.00 - -
2+500.00 20.00 - -
2+520.00 20.00 - -
2+540.00 20.00 - -
2+560.00 20.00 0.192 1.92
2+580.00 20.00 0.930 11.22
2+600.00 20.00 - 9.30
2+620.00 20.00 - -
2+640.00 20.00 - -
2+660.00 20.00 - -
2+680.00 20.00 - -
2+700.00 20.00 - -
2+720.00 20.00 - -
2+740.00 20.00 - -
2+760.00 20.00 - -
2+780.00 20.00 - -
2+800.00 20.00 1.455 14.55
2+820.00 20.00 3.555 50.10
2+840.00 20.00 2.030 55.85
2+860.00 20.00 2.759 47.89
2+861.76 1.76 - 2.43
2+880.00 18.24 - -
2+896.27 16.27 - -
2+900.00 3.73 9.262 17.27
2+920.00 20.00 1.410 106.72
2+940.00 20.00 - 14.10
2+960.00 20.00 - -
2+980.00 20.00 5.198 51.98
3+000.00 20.00 19.246 244.44
3+008.78 8.78 8.985 123.93
3+020.00 11.22 4.407 75.13
3+040.00 20.00 7.407 118.14
3+060.00 20.00 9.266 166.73
3+080.00 20.00 3.075 123.41
3+100.00 20.00 5.585 86.60
3+120.00 20.00 - 55.85
3+140.00 20.00 0.331 3.97
3+160.00 20.00 0.956 18.02
3+180.00 20.00 0.028 14.76
3+200.00 20.00 2.550 34.87
3+220.00 20.00 - 25.50
3+240.00 20.00 4.033 40.33
3+260.00 20.00 40.33
3+293.00 33.00
TOTAL 5,037.85
104(1)a
STATION LENGTH
AREA VOL
1+950.00 0.00 70.696
1+960.00 10.00 34.935 528.16
1+980.00 20.00 31.594 665.29
2+000.00 20.00 26.929 585.23
2+020.00 20.00 20.429 473.58
2+040.00 20.00 4.297 247.26
2+060.00 20.00 - 42.97
2+080.00 20.00 - -
2+100.00 20.00 0.575 5.75
2+120.00 20.00 - 5.75
2+140.00 20.00 0.091 0.91
2+160.00 20.00 - 0.91
2+180.00 20.00 - -
2+200.00 20.00 - -
2+220.00 20.00 - -
2+240.00 20.00 - -
2+260.00 20.00 - -
2+280.00 20.00 - -
2+300.00 20.00 - -
2+320.00 20.00 3.463 34.63
2+340.00 20.00 3.630 70.93
2+360.00 20.00 7.321 109.51
2+380.00 20.00 6.22 135.39
2+400.00 20.00 17.188 234.06
2+420.00 20.00 4.118 213.06
2+440.00 20.00 - 41.18
2+457.53 17.53 8.794 77.08
2+460.00 2.47 - 10.86
2+480.00 20.00 - -
2+500.00 20.00 - -
2+520.00 20.00 - -
2+540.00 20.00 - -
2+560.00 20.00 0.192 1.92
2+580.00 20.00 0.930 11.22
2+600.00 20.00 - 9.30
2+620.00 20.00 - -
2+640.00 20.00 - -
2+660.00 20.00 - -
2+680.00 20.00 - -
2+700.00 20.00 - -
2+720.00 20.00 - -
2+740.00 20.00 - -
2+760.00 20.00 - -
2+780.00 20.00 - -
2+800.00 20.00 1.455 14.55
2+820.00 20.00 3.555 50.10
2+840.00 20.00 2.030 55.85
2+860.00 20.00 2.759 47.89
2+861.76 1.76 - 2.43
2+880.00 18.24 - -
2+896.27 16.27 - -
2+900.00 3.73 9.262 17.27
2+920.00 20.00 1.410 106.72
2+940.00 20.00 - 14.10
2+960.00 20.00 - -
2+980.00 20.00 5.198 51.98
3+000.00 20.00 19.246 244.44
3+008.78 8.78 8.985 123.93
3+020.00 11.22 4.407 75.13
3+040.00 20.00 7.407 118.14
3+060.00 20.00 9.266 166.73
3+080.00 20.00 3.075 123.41
3+100.00 20.00 5.585 86.60
3+120.00 20.00 - 55.85
3+140.00 20.00 0.331 3.97
3+160.00 20.00 0.956 18.02
3+180.00 20.00 0.028 14.76
3+200.00 20.00 2.550 34.87
3+220.00 20.00 - 25.50
3+240.00 20.00 4.033 40.33
3+260.00 20.00 40.33
3+293.00 33.00
TOTAL 5,037.85
Contract ID : 19EH0068
Project Name : Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure Local Projects - Progreso Este to Garing Falls
- Malilico Package III
Project Location : Odiongan, Romblon
POW 33,294.45
Variance -11,193.78
311(1)c1 - PCCP 101(3)b1
Width Area Width Area
6.700 0.00
8.030 0.00
8.500 195.05
7.620 161.20
7.850 154.70
3.000 30.00
3.000 60.00
3.000 60.00
3.000 60.00
3.000 60.00
3.000 60.00
3.000 60.00
3.000 60.00
3.000 60.00
8.470 84.70
7.200 156.70
6.100 133.00
6.100 122.00
6.100 122.00 3.000 30.00
6.450 125.50 3.000 60.00
7.520 139.70 3.000 60.00
7.790 153.10 3.000 60.00
8.050 158.40 3.000 60.00
8.500 165.50 3.000 60.00
8.500 170.00 3.000 60.00
8.090 165.90 3.000 60.00
6.710 148.00 3.000 60.00
8.470 151.80 3.000 60.00
9.060 175.30 3.000 60.00
10.410 194.70 3.000 60.00
8.500 189.10
8.500 170.00
8.500 170.00
8.500 170.00
7.740 162.40
6.410 141.50
6.910 9.67
6.910 12.20
6.910 20.04
TOTAL 3,922.16 1,200.00
Contract ID : 19EH0068
Project Name : Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure Local Projects - Progreso Este to Garing Falls
- Malilico Package III
Project Location : Odiongan, Romblon
POW 138.40
Variance 3.99
1330
Contract ID : 19EH0068
Project Name : Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure Local Projects - Progreso Este to Garing Falls
- Malilico Package III
Project Location : Odiongan, Romblon
QUANTITY
ITEM NO. DESCRIPTION UNIT UNIT COST COST OF VARIANCE
AS PER PLAN VARIANCE
PART A FACILITIES FOR THE ENGINEER
Provison of Combined Office, Lab. & Living Quarters Bldg. for the Engr. (Rental
A.1.1(6) Basis) month 7.93 7.93 0.00 15,491.80 0.00
A.1.1(11) Provision of Furnitures/Fixtures, Equipment and Appliances for the Field Office for l.s 1.00 1.00 0.00 73,710.00 0.00
the Engr.
PART B OTHER GENERAL REQUIREMENTS
B.4(1) Construction Survey and Staking km 1.34 1.34 0.00 46,184.21 0.00
B.5 Project Billboard/Signboard ea 2.00 2.00 0.00 5,528.25 0.00
B.7(1) Occupational Safety and Health Program month 7.93 7.93 0.00 14,717.20 0.00
B.8(1) Traffic Management month 7.93 7.93 0.00 18,590.16 0.00
B.9 Mobilization and Demobilization l.s 1.00 1.00 0.00 368,550.00 0.00
PART C EARTHWORKS
100(3)a1 Individual removal of Trees (150-300 mm dia., small) ea 61.00 61.00 0.00 1,469.56 0.00
101(3)b1 Removal of Actual Structures/Obstruction, 0.15m Thk sq.m 1,200.00 1,200.00 0.00 199.63 0.00
101(4)a1 Removal of Actual Structures/Obstruction, (610mm dia. RCPC) ln.m 25.00 25.00 0.00 572.41 0.00
102(2) Surplus Common Excavation cu.m 5,646.24 5,646.24 0.00 168.83 0.00
102(3)a Surplus Rock Excavation (Soft) cu.m 46,218.50 46,218.50 0.00 258.27 0.00
103(1)a Structure Excavation cu.m 3,167.30 3,167.30 0.00 271.86 0.00
103(3) Foundation Fill cu.m 138.40 138.40 0.00 1,759.85 0.00
104(1)a Embankment from Roadway Excavation (Common Soil) cu.m 5,037.85 5,037.85 0.00 252.92 0.00
105(1)a Subgrade Preparation (Common Material) sq.m 7,167.01 7,167.01 0.00 15.26 0.00
PART D SUBBASE AND BASE COURSE
200(1) Aggregate Subbase Course cu.m 2,100.36 2,100.36 0.00 1,374.39 0.00
PART E SURFACE COURSE
311(1)c1 Portland Cement Concrete Pavement (Unreinforced), 0.23m Thk. sq.m 4,204.56 4,204.56 0.00 2,272.14 0.00
PART F BRIDGE CONSTRUCTION
404(1)a Reinforcing Steel, Grade 40 kg 33,294.45 21,219.27 -12,075.18 70.14 -846,953.13
405(1)a2 Structural Concrete Class A cu.m 850.92 509.09 -341.83 11,600.04 -3,965,241.67
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
500(1)b3 Pipe Culverts, 910mm dia. (Class IV) ln.m 25.00 25.00 0.00 7,142.33 0.00
505(2)a Grouted Riprap (Class A) cu.m 524.89 297.1 -227.79 6,222.03 -1,417,316.21
506(1) Stone Masonry cu.m 106.50 106.5 0.00 6,915.40 0.00
TOTAL -6,229,511.01
Catch Basin
Vol = 8.77 cu.m