1- The production capacity of each type of battery charger on which the plant will be designed.
2019
The yearly sales of chargers in entire Saudi market at an average of USD 15 Million (Source: Saudi customs).
Please define charger ratings, with both dc voltage and current (48Vdc 50, 100, 160, 250A and 110Vdc 100, 160, 320, 400, 600A for
example).
Other volumes per year sold by Chloride to ABB and other OEMs for Saudi Customers => Chloride
3. Production phases with description of manufacturing processes for each product with technical
specifications for equipment.
Key steps of assembly and testing => Chloride see below table
Sequence Description of assembly step
1 Baseframe assembly
2 Mechanical structure frame & Transformer mounting
3 Bridge subassembly manufacturing & mounting
4 Capacitors & coupling diodes
5 Distribution components mounting & cabling
6 Display mounting &cabling
7 Power cabling
8 PCBA cabling and additional wiring
9 Anti contact Protection elements
10 Cabinet covering / panel
11 Stickers & labels
12 Mechanical Protection elements
13 Lifting rings
14 Ground continuity test
15 Routing tests
16 Packing
Pre-requisites:
Define who does what (Chloride and Pedco) based on standard routings => Chloride
FP40R (and later FP50R): 90% is material and 10% manufacturing/testing hours
o Use of the following 5 ratings compliant to TMSS:
125VDC – 100A, 200A, 450A
48VDC – 100A, 200A
o In BOM/Charger system value: % of cost per commodity
We consider that PEDCO share could be between 25 to 33% of MMC (according to ratings and systems configuration)
This may not be achieved as a first step (to be discussed)
This needs to be refined according to local labor rates and local material prices
Panels, part of protections and part of MSC (miscellaneous) would be supplied by PEDCO
To be added, local engineering, manufacturing and test need to be also added
Star item Rating STRUCTURE PANELS TRANSFORMER BRIDGE/CAP ELECTRONIC PROTECTIONS MISC TOTAL
211 311 399 649 728 154 460 2912
FP40R1I-1640931 FP40R 48Vdc 100/110A
7% 11% 14% 22% 25% 5% 16% 100%
266 369 554 509 414 234 483 2830
FP40R1IB-10191008 FP40R 48Vdc 200A
9% 13% 20% 18% 15% 8% 17% 100%
277 369 675 550 581 199 427 3077
FP40R1IB-14307894 FP40R 125Vdc 100A
9% 12% 22% 18% 19% 6% 14% 100%
441 402 918 1188 485 210 420 4063
FP40R1IB-14306217 FP40R 125Vdc 200A
11% 10% 23% 29% 12% 5% 10% 100%
635 927 1769 1063 558 686 1062 6700
CP70R1I-1552019 CP70R 125Vdc 450A
9% 14% 26% 16% 8% 10% 16% 100%
Hours rate 50 30 35
PEDCO has it. PEDCO to send product specifications to Chloride for double check. => PEDCO
o TMSS specification FP40R product compliance.
o Shall we send standard catalog datasheet for FP40R and CP70R.
Business trip / Car journeys (home- Gasoline consumption tracking, possibility to worl from
Emissions of CO, CO2, NOx, SOx, VOC, ... Air pollution 1 - Low
Commuting work journeys) home for eligible positions
Improper waste storage (hazardous products not
Manufacturing Waste generation placed on retention bins, hazardous products on Air pollution Training / awareness 1 - Low
pallets)
Usage of potentially
Definition and deployment of list of approved
hazardous substances Air and/or soil
Manufacturing Exposure of personnel and risk of splillage substances (including register of MSDS for each) and 1 - Low
(solvant, painting, pollution
associated rules of usage and training of personnel
glue)
Manufacturing Wiring Product manufacturing: Scraps Waste KPI: waste production 1 - Low
Logistics & Logistics: Loading and Product supply or transport: Oil or fuel leak from the
Soil pollution Spillage control equipments and protocols in place 1 - Low
transportation unloading of material truck - Fire - Explosion
Maintenance: Supply
Logistics &
of spare parts and end of life of electrical and electronic products Waste KPI: waste production 1 - Low
transportation
spare parts
Using an air
Manufacturing Noise Noise pollution periodic checks 1 - Low
compressor
Logistics & Transport of
Transport of equipment Air pollution CO2 emission 1 - Low
transportation equipment
Electricity
Test Presence of transformers Soil pollution periodic checks of retention tank 1 - Low
transformation
External body: periodic
Use of external service prevention plan + QHSE policy + HSE reception
checks, maintenance, consideration of environmental criteria All 1 - Low
providers included + signed HSE charter + communication
works
Building/ General Use of handling and
Spill of hazardous materials Soil pollution spillage kits in premises 1 - Low
services lifting equipment
Building/ General Use of an air
Refrigerant circuit leak Air pollution Maintenance, Renewal of installations 1 - Low
services conditioning system
Excessive
consumption of raw Tracking of consumption, campaigns of communication
IT office prints paper consumption 1 - Low
materials and to users
production of waste
IT office prints Production of waste paper Waste KPI: waste production 1 - Low
Test Testing Loads, test benches noise pollution noise measurement 1 - Low
Use of external service Use of external service monitoring + audit + signed HSE charter +
environmental performance of suppliers All 1 - Low
providers providers communication
Logistics & Control and receipt of
Supply: Unpacking of packages Waste KPI: waste production 1 - Low
transportation supplies
retention tray, Spillage control equipments and
Warehousing Used battery storage Spill of hazardous materials Soil pollution 1 - Low
protocols in place
IT office prints Production of waste cartridges/toners Waste Recycling 1 - Low
Using an air
Manufacturing Oil leaks Soil pollution Spillage control equipments and protocols in place 1 - Low
compressor
Excessive
Building/ General Connection to the consumption of raw
Drinking water consumption Consumption KPIs 1 - Low
services drinking water network materials and
production of waste
Warehousing New battery storage Spill of hazardous materials Soil pollution Spillage control equipments and protocols in place 1 - Low
standards
o Manufacturing standards
Timeframe: