You are on page 1of 18

Annual Presentation for

PLC Section
Unit wise expense
RC2 756595, [PERCENTAGE]
RC3 402815, [PERCENTAGE]

RC4 430244, [PERCENTAGE]

RC5 638637

RC1 1740620, [PERCENTAGE]

RC6 155020

RC6
100

RM plc upgradation
90 866812

80

Ramco tuning;
RC1 Expense
70 678640 Rs17,40,620
60

50

40

30

20

10 Shell scanner, wifiCables Other expense


modem 78428
41222 51567
UPS card repair 23951
0
35Rockwell License
Upgradation;
318298

RC2 Expense
30

25
Rs 756586
UPS card repair 204000
20

15

RM plc upgradation
108917
10

Shell scanner, wifi modem


54859
5 Cables 42078
Other expense
28246

0
25
Box Panel;
225000

20 RC3 Expense
Rs 4,02,815
15

10

PLC Card; 61000

5
CCR Lab; 37000 Cable
33000 Video kit 31000
Other (Jyotsna Ent)
15655

0
25
Box Panel;
225000
MATERIAL EXPENSE

20 RC4 Expense
Rs 4,30,244
15

MATERIAL EXPENSE

10 PLC Card; 91500


OBCS
70180

5 U6 Sec Crusher; 44000

0
25

Controlnet cable;
20 195500
PLC Card; 180236
RC5 Expense
Rs 6,38,635
15
Others; 135700

10
N/W H/W
75700

UPS Shifting;
5 42200 Antivirus
35600

0
7

PLC Spare;

RC6 Expense
6 59000

5 Rs 1,55,020
KVM
42000
4
Beltsway;
33650

Biometric Lock;
20550
2

0
Breakdowns & Problems(May-14)
SECTION REASON DURATION FREQ. TOTAL

CM3 DROP FAILURE PROBLEM 0.50Hrs 1 0.50Hrs


Breakdowns & Problems(Jun-14)

SECTION Stoppage Reason DURATION FREQ. TOTAL(Hrs)

CM3 PLC DATA COMMUNICATION FAILURE 0.75Hrs 1 0.75

CM3 R.P. PLC (ROLCOX PANEL) HANGED 1Hrs 1.00 1

CM4 CNBR Hang Due to over heat 1Hrs 1.00 1.00


Breakdowns & Problems(July-14)

SECTION REASON DURATION FREQ. TOTAL

WATER PUMP TRIPPED DUE TO PACKING PLANT UPS SUPPLY


CM3 FAILURE 1.08Hrs 1 1.08Hrs
Breakdowns & Problems(Aug-14)

SECTION REASON DURATION FREQ. TOTAL

CM3 ROLLER PRESS ROLCOX PANEL UNHEALTHY 4Hrs 1 4Hrs


Breakdowns & Problems(Feb-15)

SECTION REASON DURATION FREQ. TOTAL

CM3 Controlnet cable damage due to excavation work 4.67Hrs 1 4Hrs


Breakdowns & Problems(Mar-15)
SECTION DATE REASON DURATION FREQ. TOTAL

MARCH

COMPRESSOR TRIPPED DUE TO


CM3 08-Mar-15 0.42 1 1.08
I/O SUPPLY FAILURE

29-Mar-15 PLC RIOR REPLACEMENT WORK 1.58 1.00

COOLER FAN 10 & 11 AND GRATE 1&2


29-Mar-15 TRIPPED DUE TO L&T PLC DROP 0.17 1.00
FAILURE
KILN3 2.00

30-Mar-15 KILN MAIN DRIVE COOLING BLOWER 0.25 1.00


TRIPPED DUE TO L&T PLC FAILURE
• INSTALLATION OF BLADE SERVERS TO
UPGRADE OLD SERVERS FOR FAST
SCANNING & TRENDING AND BETTER
STORAGE OF DATA

• GPP DATA TRANSFER BETWEEN CEMENT PLANT


AND POWER PLANT OVER OPC TO AVOID ANY
MISMATCHING IN PARAMETERS

• NEW ANDROID APPLICATION FOR PLANT INDICATION TO GET


INSTANT ACCESS TO MONITOR THE PLANT RUNNING STATUS
ONLINE
• INSTALLATION OF ALL IN ONE PC FOR
CCR OPERATION FOR VIEWING

• PREPARED LOGIC IN ALL THE UNITS TO CONTROL


FLUSHING FROM KILN FEED FLOWMETER TO AVOID
PLANT STOPPAGES DUE TO AIR SLIDE JAMMING

• NEW WEB SERVER FOR PLC SECTION REPORTING


• WIRELESS SYSTEM FOR PACKING PLANT
FOR ONLINE CORRECTION AND
REPORTING PURPOSE

• XRF AND RAMCO COMMUNICATION OVER


ETHERNET FOR FASTER AND TROUBLE FREE
OPERATION OF XRF MACHINES AND RAMCO
SYSTEM

• AUTOMATION OF NEW PHYSICAL LAB


• XRF MACHINE WIRELESS
COMMUNICATION

• INSTALLATION OF SEPARATE ANTI VIRUS SYSTEM


FOR PLC NETWORK TO AVOID DATA LOSS DUE TO
VIRUS ATTACKS

• U4 CNA INSTALLATION FOR RAW MIX CONTROL IN STOCK PILES

You might also like