4 Chartered Membership Examination 4 County B Country A Diameter = 20m, Viewing Platform: oo ae Chartered Membership Examination § Question 1. New visitors centre Client’s Requirements £820.0m clareterboteriess hol sts on an rteretonal bounty between we count Country Avishes to bud a vistors conte and a conectedvewng Paton fo tours, ‘The vistors centre should provide 200m? of aocemmadaton andthe vewiny pom should Provide 20m of z ‘There are no limitations on haadroom providing the structure remains usable oe ‘The centre ofthe viewing platform shouldbe located directly over the conte ofthe hole ‘The underside of the viewing platform should be 5.0m higher than th fue i ' Perimeter of the hole and! alow unhindered vews around 7. _Allstructure, including foundations and temporary works, should be contained entirely within Country A, 8. The viewing platiorm is to contain two 2.0m open sections through the flor for visitors to ook down though, Soopers Imposed Loading 9. All roofs 1.50kN/m? 10. Visitors Centre Floor 4.0KN/m? 11. Viewing Platform Floor 4.0KN/m? Site Conditions 12. The site is located in open countryside. Basic wind speed is 40m/s based on ‘a second gust; the equivalent mean hourly wind speed is 20nVs. 18. Ground condition: 0 - depth. 14. No ground water was encountered. ‘SECTION 1 a. Prepare a design appraisal with

You might also like