Side Entrance

The main transformer room

Security Room

Rest Area

7.12

3.61
Pray Room

Product Line Start


14.02

2.00 4.47

2.65 1.70
1.91

1.30
7.33
1.32
Bathrooms & Lockers
4.47
4.10 1.30

2.45
5.00
21.47

1.55

2.00
1.58

Director&Staff

15.22
10.87
10.44
Main Product Line Road Transport of Materials

8.72
RECYCLE LINE 6.61

14.37 20.47
14.08
1.88

16.71
15.00

Raw Material Warehouse and Processing Area


67.01

34.89
0.89

Road Transport of Materials


5.45
5.20

Main Entrance

Full Product Store


Security Room
22.27

13.98

Product Line Finish


Security Room

MAIN GROUND FLOOR PLAN