You are on page 1of 1

1 2 3 4 1 2 3 4 TYPICAL LIGHTENING DETAIL L

TANK 2.53 1.25 1.23 2.53 1.25 1.23


ESC: 1/10
1 X 1/4" @ 0.25
L/2

LITRES) Splicing zone


H V-1 H H V-1 H Temperature steel

1ST 1/2"

1ST 1/2"

1ST 1/2"

1ST 1/2"
Le

.60 .60 .60 .60


.05

.15
Use 1.8 times

1ST 3/8"
the designated splice
V-2

V-2

V-2

V-2
3.23 3.23 3.23 3.23

.30 .10 .30 .10 .30


it
Low h/2 Le
d . . . . . . . . . . . . . . . . . . . . . . . . ." Steel Positive Splice Zone
Overflow

1ST 1/2"
2" 1.00 1.00 1.00
L/4
.60
1ST 3/8"

1ST 3/8"

1ST 3/8"
1ST 1/2"

1ST 1/2"

1ST 1/2"
DETAIL MEETING OF VIGAS

50% of positive or negative reinforcement


G V-1 V-1 G G V-1 V-1 G
TO' 1.00 1.00 1.00
L L
L

Le

* You should not be more spliced


VCH

VCH

VCH

VCH
V-2

V-2

V-2

V-2
3.05 3.05 3.05 EMPTY 3.05 OVERLAPS AND SPLICE

in the same section


L SLABS COLUM.
Ø BEAMS SNIES AND BEAMS IN C
Le (cm) Le (cm)

1.00 1.00 1.00


6mm 30 30
1ST 1/2"

1ST 1/2"

1ST 1/2"
Use 1.8 times
F V-1 V-1 F F V-1 V-1 F the designated splice 3/8" 40 40 L

1ST 1/2"
Niple Special
.60
1.00 1.00 1.00 1/2" 50 50
Departure from Ventilation
Overflow
TYPE OF REINFORCEMENT BEND They will not be allowed L splices
0.05 5/8" 70 50 reinforcement splices will be loc
IN VIGA
VCH

upper (negative) in central thi


V-2

V-2

V-2

V-2
a length of 1/4 They won
3.15 3.15 3.15 3.15 3/4" 110 90
Ø L of light from the sning or more than
beam on either side of armor in a
3/8" 0.25m - - - the support column. same sec
Low
1/2" 0.30m
1ST 3/8"

1ST 3/8"
Overflow
2" 1.00 1.00 1.25 1.00 1.00 5/8" 0.35m
3/4" 0.40m
1ST 1/2"

1ST 1/2"

1ST 1/2"

1ST 1/2"
1" 0.45m
E V-3 E E V-3 E
START C-5
TANK STRUCTURE
1ST 3/8"

1ST 3/8"
.70 .70 .70 .70
BEAM DETAIL ESC 1/25
ESC 1/20
V-2

V-2

V-2

V-2
Reduction
2.20 2.20 2.20 2.20
2" at 3/4" COLUMN DETAIL .30

ESC 1/20 .30


.15 .15 .15 .30 .15
2 X 3/8" .55
7 X 1/2"
1ST 1/2"

1ST 1/2"

.70 .70
.40
.40 .40 3/8" @
Cleaning Pipe 4 X 1/2" .15
.20 .20 .20
3/4" D V-1 V-1 D D V-1 V-1 D .40
.15 4 X 1/2" 4 X 3/8" .30
.20
Al Ungrate
.60 .30
V-2

V-2

V-2

V-2
.15 .15
VCH

VCH

-A'
1ST 1/2"

1ST 1/2"

2.15
EMPTY
2.15 2.15
EMPTY
2.15
VCH Vb
1/25 STAIRCASE STAIRCASE C-5 .15
.15
1/4" 1/4" 3/8" @ 0.25
1/4" V-2 1 @ 0.05 1 @ 0.05 3/8" @ 0.25
1 @ 0.05 Rto s 0.10 Rto s 0.10 .95
5 @ 0.10 1/4"
4 @ 0.15 1 @ 0.05
C V-1 V-1 C C V-1 V-1 C

3/8" @ 0.25
3/8" @ 0.25
Rto s 0.25 4 @ 0.10
1ST 1/2"

1ST 1/2"

1.50
2 @ 0.15
.60 .60
Rto s 0.20
1.00 1.00
2-3/8"
.05
1.375

.50
V-2

V-2

V-2

V-2

2-3/8"
3.08 3.08 3.08 3.08
.10 .15
.50
BEAM DETAIL V-3 E-E AXIS .15 .15 .30

You might also like