SMART BUILDING AUTOMATION GUIDELINES


UTT Design guide requirements for Smart City Services

Revision 10
UT TECHNOLOGY
SMART BUILDING AUTOMATION GUIDELINES
UTT Design guide requirements for Smart City Services
Revision 10

1. UBIQUITOUS TELECOMMUNICATION TECHNOLOGY SMART BUILDING AUTOMATION GUIDELINES 5


6
7
8
8
13
14
14
15
15
15
16
16
16
17
17
21
22
23
24
24
28
29
30
30
31
31
31
31
32
33
33
33
34
34
34
35
01 UBIQUITOUS
TELECOMMUNICATION
TECHNOLOGY SMART BUILDING
AUTOMATION GUIDELINES
Reem Island is considered as one of the most For any amendments or changes, the consultant
luxurious projects among the UAE which needs is responsible to resubmit modified drawings to
a high life standard for all types of units. One of UTT indicating all the changes for re-approval prior
starting of work.
the common technologies which can add value to
residential and commercial buildings is Smart Building • It’s the responsibility of the MEP contractor
assigned by the client to arrange the fixing of all
Technology. In order to insure quality, reliability and conduits, back boxes, automation distribution panel,
proper support of such critical technology, Ubiquitous pull and terminate the electrical wires as mentioned
Telecommunication Technologies (UTT) will be the in the Smart Building Automation Guidelinein
sole provider of Smart Building Automation System automation distribution panel according to the
and will be responsible of servicing and supporting approved drawings.
Smart Building Automation System within Reem • UTT through its certified venders will supply and
install all the smart Building Automation cables and
Island. Developers are kindly requested to insure the equipment after receiving a confirmed order from
following: the Owner/Developers/Contractor. This scope is
not allowed to be carried out by any other party.
• UTT is the exclusive provider of Smart Building • UTT will be conducting periodic site inspections
Automation system within Reem Island and in order to make sure that all the works done are
Rawdhat Abu Dhabi, no other third party will be according to UTT guidelines & approved drawings.
allowed to provide Smart Building Automation The contractor should apply for a site inspection by
systems. submitting the application for building inspection.
Refer to Annex2.2&2.3 forthe application form and
• All apartments shall be either equipped with Smart the inspection checklist.
Home Automation or Smart Home Ready.
• Smart Home Ready System consists of mandatory
• Etisalat’s Building Completion Certificate (BCC)
will not be issued unless all UTT Smart Building
items mentioned in section 1.1. Automation Guideline and approved drawings are
• All connections shall be as per UTT Smart Building implemented on site.
Automation Guidelines. • Delivery period of Smart Building Automation
• It’s the responsibility of consultant/contractor of equipment is 4 months after placing a confirmed
the project to submit the drawings of the smart order.
building automation system layout, bus cable layout
and the schematic diagram for each apartment The centralized ADP is interconnected with
type as shown in Figure1.1.2, 1.1.3 &Figure1.1.4 communication bus cable, and controls Lights, HVAC,
respectively or Figure1.2.1, 1.2.2&1.2.3 for Smart Access Control, Audio/Video Equipment, Shades,
Home Basic System. The application for building Drapes and …etc. as shown in Figure 1.1.1.
approval should be submitted along with the
drawings. Refer to Annex 2.1 for application form.

4 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 5
1.1.1.1.5 DIN RAIL TYPE ADP:
The Smart Home Ready System consists of: • It should be used for two bedroom apartment type
a) Fixing the ADP and terminating the lightings’ and above.
wires into it through the terminal blocks • It will house the dimmers and relays required for
(connectors) as mentioned in sections 1.1.1-1.1.3. the lighting loads connections (channels):
The terminal blocks will be used for testing the - 1st DIN rail : up to 16 lighting channels are
lighting circuit,. available for dimming.
b) Smart Home Keypad’s & the bus cable - 2nd DIN rail : up to 16 lighting channels are
requirements as mentioned in section 1.1.4. available for relay.
c) HVAC provision as mentioned in section 1.1.5. - 3rd DIN rail : up to 16 lighting channels are
available for relay.
d) Shades and Curtain Control provision as
mentioned in section 1.1.6.
• It will house the HVAC modules required for the AC
control:
e) Motion sensor/Multi-Sensor provision as
- 4th DIN rail : up to 10 HVAC channels are
mentioned in section 1.1.7 available for AC control.
f) Entertainment (E) Outlet provision as mentioned • It will house the power supply and gateway:
in section 1.1.9. - 5th DIN rail : dedicated 220V protected breaker
connection required.
UTT through its certified venders will supply and
install all the smart home/smart home Ready cables • If more connection channels are required, please
and equipment after receiving a confirmed order consult UTT.
from the Owner/Developers/Contractor. This scope • Its size is 975 x 435 x 101 mm (HWD). For more
is not allowed to be carried out by any other party. All information, please refer to UTT certified ADP
Figure 1.1.1: DIN Rail System Overview vendor.
technical rules applied in Smart Home System are
similar to Smart Home Ready System. The following
1.1 SMART HOME READY sections will provide a detailed explanation about the
DIN Smart Home Ready System that should be done 1.1.1.2.3 DIN RAIL TYPE ADP:
Smart Home Ready System provided by Ubiquitous In Smart Home Ready System all loads shall in the home.
Telecommunication Technologies (UTT) are based on be connected through the ADP. Terminal blocks • It should be used for studio and one bedroom
Centralized DIN rail System Design where load (connectors) will be plugged in, to close the circuits apartment type only.
dimming and switching control will be placed in central and pass the current in order to test all loads from • It will house the dimmers and relays required for
enclosures called the Automation Distribution Panel any short circuit. the lighting loads connections (channels):
(ADP). The ADP should be installed inside mechanical
The difference in this case compared to the standard - 1st DIN rail : up to 16 lighting channels are
rooms
wiring
or electrical
directly
closets and receives AC
from breaker panel in the Electrical
conventional electrical connection is that, instead 1.1.1 AUTOMATION available for dimming.
Distribution Board (EDB). In the apartment scenario, the
of connecting the load from the EDB through the DISTRIBUTION PANEL - 2nd DIN rail : up to 12 lighting channels are
conventional switch, it will pass through the ADP
ADP will be placed near the EDB.
first. For instance, the line voltages (breakers) will be (ADP) available for relay.
The centralized ADP is interconnected with connected from the EDB to the ADP then from the ADP
• It will house the HVAC modules required for the AC
communication bus cable, and controls Lights, Fans, There are two types of the DIN rail ADP that should be control:
Motors, HVAC, Security, Audio/Video Equipment, to the load through the conventional switch. Controlling fixed inside the home next to the EDB which are: - 2nd DIN rail : up to 4HVAC channels are available
Internet Cameras, Shades, Drapes, Skylights, the loads will be through the normal conventional for AC control.
Awnings, Shutters, Pool Equipment, and …etc. switches.
• It will house the power supply and gateway:

6 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 7
- 3rd DIN rail : dedicated 220V protected breaker - R17, R18, R19… up to R48 for Relay Module
connection required. Channels. The connections termination should
• If more connection channels are required, please start from right side of the 2nd and 3rdDIN rails as
consult UTT. shown in Figure 1.1.6.
• Its size is 615 x 435 x 101 mm (HWD). For more • The details & rating of each load (for example:
information, please refer to UTT certified panel chandelier, 500watt) should be mentioned clearly in
vendor. the apartment’s smart home layout.

1.1.2 CONNECTION BETWEEN


ADP & THE OPTICAL NETWORK
UNIT (ONU)
• 1 No. 25 mm conduit should be provided between
the ADP and the ONU. It should enter the ADP and
the ONU from the bottom center portion only as
shown in Figure 1.1.7.
• 2 No. of Cat.6 cables should be pulled inside the
conduit.
• 1 m length of cables should be kept inside the ADP
and the ONU.

1.1.3 LOADS CONNECTION


• All the loads such as lightings, exhaust fans,
doorbell and water heaters inside the home should
be connected to the ADP using the electrical wires.
• The loads’ wires should run inside conduits & enter
the ADP from the top only.
• Each load should have its own line (wire) coming
out from the ADP to the load location. The neutral
wire can be shared between the loads fed from the
same breaker and should return back to the ADP.
• 1 m length of electrical wire for each load should
be kept inside the ADP.
• All the wires should be labeled and terminated at
the ADP according to the approved drawings as
shown in Figures 1.1.2, 1.1.3, 1.1.6 & 1.1.7. The
labeling should be as follows:
- D1, D2, D3… up to D16 for Dimmer Module
Channels. The connections termination should start
from the right side of the 1stDIN rail as shown in Figure 1.1.2: Apartment’s Smart Home Figure 1.1.3: Apartment’s Bus Cable Layout Figure 1.1.4: 5 DIN rail Type ADP
Figure 1.1.6. Basic System Layout

8 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 9
There are two types of the DIN rail Modules where the
loads should be connected to within the ADP and a
Gateway which are:

1.1.3.1 DIN RAIL DIMMER


MODULE:
• The DIN rail Dimmer Module shown in Figure 1.1.8
is used to dim the lights to a certain percentage as
well as to turn them ON/OFF.
• The lighting loads in the living room, dining room,
and all bedrooms should be connected to the
output channels of the dimmer module(s).

Figure 1.1.8: DIN rail 4 Channels Dimmer Module


Figure 1.1.7: 4th and 5th Din rail
Schematic Diagram • There are different type of dimmer module(s) to
be used, depending on the number of output (load)
channels and the output (load) rating.
Note:
Figure 1.1.6: 1st, 2nd and 3rd
Terminal blocks will be used to terminate the lightings’
• Each Unit (vertical slot/sideboard of the Module)
Figure 1.1.5: 3 DIN rail Type ADP Din rail Schematic Diagram from the dimmer module should be connected to
electrical wires in order to test the loads from
the same breaker with its neutral as an input from
any short circuit, then on client request, the DIN
the EDB.
Dimmer module, Relay module, LCD, Power
Supply and the gateway/controller will be • Each lighting load should have its own line (wire)
installed as Smart Home Full System. All the connected to the dimmer module output. The neutral
technical rules applied for the DIN Dimmer, DIN cable can be shared between the loads fed from the
Relay, and Controller should be applied to the same breaker and should return back to the ADP.
terminal blocks.

10 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 11
• Dimmable ballasts for lights should be installed by • Each lighting load, exhaust fan, doorbell, and water Delivery period of Smart Home Basic Devices is 4 • A smart home keypad provision should be provided
the electrical contractor assigned from the client. heater should have its own line (wire) connected months after placing a confirmed order. at the entry of each room, bathroom, kitchen &
• The loads connections to the dimmer module are to the relay module output. The neutral cable can corridor inside the home as shown in Figure 1.1.2.
be shared between the loads fed from the same It’s the responsibility of the MEP contractor assigned
shown in Figure 1.1.6. • The dimension of the keypad’s faceplate is 86 x 86
breaker and should return back to the ADP. by the client to arrange the fixing of all conduits,
back boxes, automation distribution panel, pull the mm (HW).
1.1.3.2 DIN RAIL RELAY • The loads connections to the relay module are
shown in Figure 1.1.6.
electrical wires and terminate it in ADP as • The conventional switch will be used to toggle all
MODULE: mentioned in the Smart Home Ready/Smart Home the loads as On/Off.
Guidelines and according to the approved drawings.
• The DIN rail Relay Module shown in Figure 1.1.9 is 1.1.3.3 DIN RAIL GATEWAY: All the technical rules mentioned in these sections • If a thermostat inside a living room is close to
used to toggle (ON/OFF) the lights, exhaust fans, should be applied even though only back boxes and the LCD or Keypad of the room, just thermostat
doorbell and water heaters. • The gateway shown in Figure 1.1.10 is required
cables will be used. provision is enough for both of them. However, if
to connect the smart home system to the TCP/IP
• The lighting loads in the kitchen, corridors and network.
the LCD or Keypad is away from the thermostat
all bathrooms should be connected to the output of the room, both thermostat and LCD or keypad
channels of the relay module. • A dedicated 220V surge protected breaker should
provision should be provided.
be connected to the power supply of the gateway
• The doorbell, exhaust fans and water heaters in located at the last rail of the ADP as shown in • For each keypad, a UK sized back box (3’’ x 3’’) with
the home should also be connected to the output
channels of the relay module.
Figure 1.1.7. 1.1.4 THE SMART HOME KEYPAD a minimum depth of 47 mm should be installed.

AND THE BUS CABLE • No electrical wires will pass by the keypad back
boxes.
• Smart home keypads, shown in Figure 1.1.11, • The bus cable, supplied by UTT, should go out
are programmable keypads that consist of 4 to from the bottom center portion of the ADP in
8 buttons or an LCD with 12 buttons where each order to connect the back boxes of the keypads,
button can be used for a single or multiple actions
thermostats, curtains, multi-sensors, and the
(scenes).
entertainment (E) outlet. The cable should come
back to the ADP after passing by the last back box
in order to close the loop.
• The bus cable should pass by each back box
without being cut where a minimum of 35cm from
the cable should be kept inside each back box (two
rounds inside the back box).
• The bus cable loop should be run inside 20 mm
conduits. All the conduits should be laid from the
ground below the tiles and not from the ceiling
except for curtains and motion sensors.
• The looping is topology free (daisy chain, branch,
Figure 1.1.9: DIN rail 4 Channels Relay Module Figure 1.1.10: DIN rail Gateway
star, etc.) If the total amount of cable used within
• There are different type of relay module(s) to be Notes: a bus run is not more the 300m otherwise Daisy
used, depending on the number of output (load) UTT through its certified venders will supply all chain is highly recommended as shown in Figure
channels and the output (load) rating. the Smart Home Ready Devices after receiving a 1.1.7.
• Each channel from the relay module can be confirmed order from the Owner/Developers/
connected to a different breaker with its neutral as Contractor. This scope is not allowed to be carried
an input from the EDB. out by any other party. Figure 1.1.11: Smart Home Keypads

12 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 13
1.1.5 HEATING, VENTILATING, • The first covered back box has a power cable. It be indicated on the smart home system layout, bus
is a normal power used to energize the curtain’s cable layout and the schematic diagram as in Figures
AND AIR CONDITIONING (HVAC) motor. 1.1.2, 1.1.3& 1.1.7 respectively. According to the
• The second back box is a UK sized back box (3’’ x number of Multi-sensors to be installed, it should be
• Each thermostat requires a UK sized back box (3’’
3’’) with a minimum depth of 47 mm. It should be labeled as M1, M2 and M3…etc...
x 3’’) with a minimum depth of 47 mm. It should be provided with a blank plate and labeled as C1, C2,
labeled as T1, T2 & T3…etc. and C3…etc.
• The bus cable loop should pass by the thermostat’s - Inside this covered back box, the bus cable loop
1.1.8 ACCESS CONTROL SYSTEM
back box without being cut where a minimum of should pass without being cut where a minimum of
35cm from the cable should be kept inside each 35cm from the cable should be kept inside each
• In the main entrance area, access control Node
back box (two rounds inside the back box). controller labeled as N should be provided at the
back box (two rounds inside the back box).
center of the ceiling in foyer or entrance location
• The location of each thermostat & its labeling • The location of each curtain & its labeling should along with power outlet box. The bus cable loop
should be indicated on the smart home system be indicated on the smart home system layout, should pass by the Node controller round back box
layout, bus cable layout and the schematic bus cable layout and the schematic diagram as in without being cut where a minimum of 35cm of the
diagram as in Figures 1.1.2, 1.1.3, 1.1.7 & 1.1.12 Figures 1.1.2, 1.1.3& 1.1.7 respectively. cable should be kept inside the round back box (two
respectively.
Figure 1.1.12: FCU Connection Details rounds inside the back box).
• Depending on the FCU used, keep all wires between
the convention thermostat and FCU, and extend all
1.1.7 MOTION SENSOR/ • The round back box should be covered by a blank
plate.
the wires terminated at each FCU controller PCB 1.1.6 SHADES AND CURTAIN MULTI-SENSOR
• The power box has a power outlet. It is a normal
to the ADP (using same size of wires and cables) by CONTROL power used to energize the Node controller.
using 25mm conduit and label them accordingly in • A sensor is used to trigger the programmed
both sides. For example: • Two back boxes with blank plates should be actions once the presence of a person is detected. • In the main entrance area, access control Node
provided at the top right side of all windows at the controller labeled as N should be provided at the
• two Type of sensors will be used as follows:
center of the ceiling in foyer or entrance location
• FCU1 cables will be 1Y, 1G1, 1G2, 1G3, 1R curtain location (10-20 cm away from the window
A. P IR Motion Sensors:
and 1W. frame) as in Figure 1.1.13. As a suggestion, along with power outlet box. The bus cable loop
creating a curtain box helps hiding the back boxes. • Each bathroom, entrance, and kitchen inside the should pass by the Node controller round back box
• FCU2 cables will be 2Y, 2G1, 2G2, 2G3, 2R, home should have a motion sensor on its ceiling without being cut where a minimum of 35cm of the
and 2W. and it’s optional to have it for the other rooms & cable should be kept inside the round back box (two
• FCU3 cables will be 3Y, 3G1, 3G2, 3G3, 3R, corridors. A Cat.6 cable should be extended inside rounds inside the back box).
and 3W. a 20 mm conduit from each motion sensor to the • The round back box should be covered by a blank
nearest keypad available in the room. The Cat.6 plate.
• cable should be labeled from both sides as S1, S2
The wires coming from each FCU should be
and S3…etc. according to the number of motion
• The power box has a power outlet. It is a normal
terminated at the 4th DIN rail of the 5 DIN rail Type power used to energize the Node controller.
ADP or at the 2nd DIN rail of the 3 DIN rail Type sensors to be installed.
ADP. B. M ulti-Sensor:
• Living area thermostat will be replaced with • In the living room zone, a multi-sensor labeled as 1.1.9 ENTERTAINMENT (E)
the Smart Home LCD in the Smart Home Basic M should be provided at the center of the ceiling OUTLET
projects. near the TV location. The bus cable loop should
pass by the multi-sensor round back box without •
• A complete data sheets for HVAC system used and According to the telecom guidelines, at least 1 dual
being cut where a minimum of 35cm of the cable data outlet is available in the living room zone at
thermostat sample should be submitted to UTT.
should be kept inside the round back box (two the TV location. Next to this data outlet, an outlet
rounds inside the back box). The round back box labeled as E with a blank plate should be provided
should be covered by a blank plate. as shown in Figure 1.1.14 along with a dual power
Figure 1.1.13: Shade & Curtain Connections • The location of each sensor & its labeling should socket.

14 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 15
• the room. The Cat.6 cable should be labeled from • Section 1.1.4 the bus cable of the upper floor • Section 1.1.7 a Multi-sensor should be provided at
both sides as E1, E2 and E3…etc. keypads, thermostats, curtains, sensors, and E the upper floor living room area.
• The location of the speakers & its labeling should outlet should be extended directly to the secondary • Section 1.1.9 an E outlet should be provided at the
be indicated on the smart home system layout, bus ADP. upper floor living room area at the TV location.
cable layout and the schematic diagram.

1.1.11 IR RECEIVER


IR receiver triggers the programmed actions once
the end user uses an IR remote control.
The bus cable loop should pass by the IR receiving
02 LED LIGHT
round back box without being cut where a minimum
of 35cm of the cable should be kept inside the
An LED lamp is a light-emitting diode (LED) product that potential savings on air-conditioning
round back box (two rounds inside the back box). It
is assembled into a lamp (or light bulb) for use in lighting • No hazardous material, 100% mercury free
should be labeled from both sides as IR1, IR2 and
fixtures. LED lamps have a lifespan and efficiency that
IR3…etc.
is several times better than incandescent lamps, and This guideline is designed to assist the user in
Figure 1.1.14: E Outlet Layout • The location of each IR receiving& its labeling significantly better than most fluorescent lamps, with identifying potential interior and exterior architectural
should be indicated on the smart home system some chips able to emit more than 100 lumens per
• A UK sized back box (3’’ x 3’’) with a minimum layout, bus cable layout and the schematic diagram.
applications for LEDs by giving specific design
depth of 47 mm should be used for the E outlet. watt. examples typically found in residential and commercial
• The bus cable loop should pass by the E outlet 1.1.12 PENTHOUSE & The advantages of LED lighting over traditional light categories. This guideline identifies lumen packages
that would be necessary for various applications.
sources are numerous:
without being cut where a minimum of 35cm from
the cable should be kept inside the back box (two
TOWN HOUSE • High efficiency providing substantial energy savings
rounds inside the back box). • For a penthouse or town house consisting of a • Long lifetime reducing maintenance needs and 2.1 LED LAMP LUMINAIRES
• The location of the E outlet & its label should be lower floor & upper floor, sections 1.1.1 to 1.1.14 costs In this part, minimum lumen required for various
are applied; however, the following should be taken
indicated on the smart home system layout, bus • Instant start and higher resistance to switching application will be present in table 1.2.2. LED lamp
cable layout and the schematic diagram as in into considerations for:
cycles luminaires shall to be of a type as based on calculations
Figures 1.1.2, 1.1.3& 1.1.7 respectively. According • Section 1.1.1 a secondary ADP should be fixed
• Low operating temperature creating additional submitted by the contractor.
to the number of Entertainment outlets to be at the upper floor next to the upper floor EDB. 1
installed, it should be labeled as E1, E2 and E3… No. bus cable should be extended between the
etc... secondary ADP and the ADP located at the lower
floor (which is called Master ADP) inside a 25 mm
1.1.10 AUDIO (A) DISTRIBUTION conduit. The bus cable should be labeled from both
sides as L1.
• Each room (zone), which requires an audio
distribution, will need the following to be installed in • Section 1.1.2 another 1 No. Cat.6 cable should
the ceiling: be extended from the ONU to the secondary ADP
inside a 25 mm conduit. The Cat6 cable should be
- 1 No. Amplifier: requires 220v power supply and labeled from both sides as L1.
Cat.6A cable from ONU.
• Section 1.1.3 all the lighting loads, exhaust fans,
- 1 No. Pair of speakers: 1 speaker cable from each and water heaters of the upper floor should be
speaker in same zone to the amplifier. connected to the secondary ADP. A dedicated
• 1 No. E outlet will be required at each zone. 220V surge protected breaker should be
• A Cat.6 cable should be extended inside a 20 mm connected to the power supply of the gateway
conduit from the amplifier location to the E outlet in located at the last DIN rail of the secondary ADP.
Figure 1.2.1: Advantages of LED lighting

16 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 17
IES Standards IES Standards IES Standards IES Standards
General Building Areas Illumination General Building Areas Illumination General Building Areas Illumination General Building Areas Illumination
Level Level Level Level
CIRCULATION AREA Staff rooms, student rooms\students hostels etc. 300 CIRCULATION AREA Staff rooms, student rooms\students hostels etc. 300
Corridors, Passageway 100 Gymnasium 300 Corridors, Passageway 100 Gymnasium 300
Lift 150 Lift 150
Stairs 150 LIBRARIES Stairs 150 LIBRARIES
Escalator 150 Shelves, book stack 150 Escalator 150 Shelves, book stack 150
External Covered Ways 30 Reading table 300 External Covered Ways 30 Reading table 300
Reading rooms, newspaper and magazines 300 Reading rooms, newspaper and magazines 300
ENTRANCES Reference libraries 500 ENTRANCES Reference libraries 500
Entrance halls, lobbies, waiting rooms 150 Counters 500 Entrance halls, lobbies, waiting rooms 150 Counters 500
Enquiry desk 500 Industrial covered ways 50 Enquiry desk 500 Industrial covered ways 50
Gate houses 300 Gate houses 300 STAFF RESTAURANTS
STAFF RESTAURANTS Centre cafeterias, dining room 300
KITCHENS Centre cafeterias, dining room 300 KITCHENS
Foods stores 150 Foods stores 150 MEDICAL AND FIRST AIDS CENTERS 500
General 500 MEDICAL AND FIRST AIDS CENTERS 500 General 500 Consultant room, treatment areas 500
Consultant room, treatment areas 500 Medical stores 100
OUTDOOR Medical stores 100 OUTDOOR Rest room 150
Controlled entrance halls or exit gate 150 Rest room 150 Controlled entrance halls or exit gate 150
Entrance and exit car park 30 Entrance and exit car park 30 STAFF ROOM
Stores, stockyards 30 STAFF ROOM Stores, stockyards 30 Changing locker and cleaner's room, 150
FURTHER EDUCATION ESTABLISHMENT Changing locker and cleaner's room, 150 FURTHER EDUCATION ESTABLISHMENT Rest rooms 150
Lecture theatres general 500 Rest rooms 150 Lecture theatres general 500
Chalkboard 500 Chalkboard 500 STORE AND STOCK ROOMS 150
Demonstration benches 500 STORE AND STOCK ROOMS 150 Demonstration benches 500 Telecommunication board, 100
Examination halls, seminar rooms, teaching spaces 500 Telecommunication board, 100 Examination halls, seminar rooms, teaching switchboard rooms 100
500
spaces
Laboratories 500 switchboard rooms 100 Cordless switchboard 300
Laboratories 500
Cordless switchboard 300 Apparatus rooms 150
FURTHER EDUCATION ESTABLISHMENT FURTHER EDUCATION ESTABLISHMENT
Apparatus rooms 150
Workshop 300 Tele printer rooms 500
Workshop 300 Tele printer rooms 500

18 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 19
IES Standards IES Standards IES Standards IES Standards
General Building Areas Illumination General Building Areas Illumination General Building Areas Illumination General Building Areas Illumination
Level Level Level Level
WOODWORKING SHOP OFFICE Bathrooms 100 GENERAL
Rough sawing, bench work 300 General office with mainly clerical task and typing Halls and landings 150 Changing rooms showers lookers rooms 150
500
office
Sizing, planning, rough sanding medium and bench Stairs 100 TABLE TENNIS
500 Deep plan general offices 750
work gluing cooperage
Workshops 300 Club 300
Fine bench and machine work fine sanding, finishing 750 Business machine and typing 750
Garages 50 Recreational 200
Railway station parcel and left luggage offices Filling room 300
300
counters
Conference rooms 750
Circulation area 150 INDOOR SPORTS AND RECREATIONAL BUILDING
2.2 PROTECTION CLASSIFICATION
Waiting area 300 Athletics, basketball, bowls, judo 300
OFFICES AND SHOPS
Hockey 700 All interior lighting fixture enclosures shall be classified
Executive office 500 in accordance with the IP classification system and two
HOSPITAL digit number code, following table 1.2.3 present some
Computer rooms 500
Ward unit bed heads general 30-50 BADMINTON COURTS sample areas:
Punch card rooms 750
General 150
Drawing offices drawing boards 750 Installation Considerations
Night 0.1 BILLIARD ROOMS Residential/Office/ School Generally clean, dry and free from
Reference table and general 500 harmful deposits of dust, but some
Nurse station evening 300 General 100 condensate may be present due to
Print room 300 atmospheric conditions. Minimum
Pharmacies dispensing bench 500 Table special lighting protection typically IP2XC for dry
Shelves 150 conditions.
SHOP
Reception general 300 CARD ROOMS 300 Control rooms/ Sub-Stations Generally dry and free from harm-
Conventional with counters 500 ful deposits of dust, but some con-
Enquiry desk 500 densate may be present due to
Conventional with wall display 500 atmospheric conditions. Where
Laboratories 500 GYMNASIA GENERAL 500 access is restricted to skilled or
Conventional with wall display 500 instructed persons, IP2X is the typ-
Operating theatre suits general 400 ical minimum requirement for dry
SWIMMING POOL conditions.
Recovery room and intensive care units 30-50
SHOP
X-ray department radio-diagnostic and rooms Top pool 500 Commercial/ Light Industrial May not be clean, but normally dry
500 Self service 500 and free from harmful deposits of
fluoroscopy
Spectator areas 150 dust. Suitable minimum protection,
Dental surgeries 500 Supermarkets 500 a) Where condensate is not pres-
Club recreational 300 ent, IP2XC b) Where condensate
Hypermarkets 500 may be present, IP21C. c) Equip-
ment installed within range of fire
HOMES General 500 sprinkler systems, IP22C. Machine
PUBLIC AND EDUCATIONAL BUILDING ASSEMBLY AND
control equipment, where fluids
Living rooms general 50 Bedroom general 50 CONCERT HALLS may be present, e.g. lathes, millers
Theatre and concert halls 100 etc., typically IP54. Consideration
Casual reading 150 Bed lead kitchen 150 should also be given to the corrosive
Cinemas 50 properties of certain fluids
Sewing darning studies desk and portaged 300 Kitchen working areas 300
Multipurpose 500

20 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 21
Installation Considerations Together with this selection, the consultant/
Heavy Industrial, Chemical, Steel May not be totally clean, with possi- contractor should provide the corresponding lightning
making etc ble presence of corrosive elements layout (In AutoCAD) in order for UTT to update the
and harmful deposits of dust. Pro-
tection to IP54 will be typically re- legend and descriptions.
quired, with special consideration Bill of Quantities, must be confirmed by client/
given to the corrosion resisting
properties of the enclosure.
consultant upon which UTT will prepare LPD
calculations and Estidama compliancy.
Will vary depending on the type
Food Processing of food being processed and the
possible requirement for washing
down. Where fine powders are
present, a minimum of IP53 should
be used. This should be increased to
IP54/55 if the equipment needs to
1.2 SMART HOME
be washed/hosed down.
Smart Home Systems provided by Ubiquitous
If subjected to exposure to any Telecommunication Technologies (UTT) are based
Weatherproof weather condition, agreement be- on Centralized DIN rail System Design where load
tween the User and Manufacturer dimming and switching control will be placed in central
is necessary together with addition-
al consideration given to the cor-
enclosures called the Automation Distribution Panel
rosion resisting properties of the (ADP). The ADP should be installed inside mechanical
enclosure and fittings rooms or electrical closets and receives AC wiring
directly from breaker panel in the Electrical Distribution
Board (EDB). In the apartment scenario, the ADP will
The degrees of protection provided by an enclosure be placed near the EDB. With this design, traditional
are indicated by the IP code in the following way: toggle switches to control each light or load will be
CODE LETTERS IP 2 3 eliminated. Instead, all the loads are controlled using
International Protection programmable low voltage keypads and IP enabled
Touch Panels.
FIRST NUMERAL 0-6, or letter X Figure 1.3.1: DIN Rail System Overview
The centralized ADP is interconnected with
Protection of persons by prevention or limiting communication bus cable, and controls Lights, Fans,
ingress of parts of the human body or solid objects Motors, HVAC, Security, Audio/Video Equipment, The following sections will provide a detailed
SECOND NUMERAL 0-8, or letter X Internet Cameras, Shades, Drapes, Skylights, explanation about the DIN Rail Smart Home System
Resistance to ingress of water Awnings, Shutters, Pool Equipment, and …etc. as that should be made inside the home:
- 1st DIN rail : up to 16 lighting channels are
Notes: shown in Figure 1.3.1. available for dimming.
UTT will offer the client the option to select from
1.2.1 AUTOMATION - 2nd DIN rail : up to 16 lighting channels are
a pool of approved vendors for the supply of LED DISTRIBUTION PANEL (ADP) available for relay.
light fittings and/or submit their own selection There are two types of the DIN rail ADP that should be - 3rd DIN rail : up to 16 lighting channels are
subject to UTT review and approval. The client will fixed inside the home next to the EDB which are: available for relay.
be charged a fee for fittings that must undergo
compliance test to SBA systems prior to approval
of the same;
1.2.1.1.5 DIN RAIL TYPE ADP: • It will house the HVAC modules required for the AC
• It should be used for two bedroom apartment type control:
The client/consultant shall select the desired
selection of fittings and, for his project and enter and above. - 4th DIN rail : up to 10 HVAC channels are
values for light warmth and lumens for the same. • It will house the dimmers and relays required for available for AC control.
the lighting loads connections (channels): • It will house the power supply and gateway:

22 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 23
- 5th DIN rail : dedicated 220V protected breaker • 2 No. of Cat.6 cables should be pulled inside the
connection required. conduit.
• If more connection channels are required, please • 1 m length of cables should be kept inside the ADP
consult UTT. and the ONU.
• Its size is 975 x 435 x 101 mm (HWD). For more
information, please refer to UTT certified ADP
vendor. 1.2.3 LOADS CONNECTION
• All the loads such as lightings, exhaust fans,
1.2.1.2 3 DIN RAIL TYPE ADP: doorbell and water heatersinside the home should
be connected to the ADP using the electrical wires.
• It should be used for studio and one bedroom • The loads’ wires should run inside conduits & enter
apartment type only. the ADP from the top only.
• It will house the dimmers and relays required for • Each load should have its own line (wire) coming
the lighting loads connections (channels): out from the ADP to the load location. The neutral
- 1st DIN rail : up to 16 lighting channels are wire can be shared between the loads fed from the
available for dimming. same breaker and should return back to the ADP.
- 2nd DIN rail : up to 12 lighting channels are • 1 mlength of electrical wire for each load should be
available for relay. kept inside the ADP.
• It will house the HVAC modules required for the AC • All the wires should be labeled and terminated at
control:
the ADP according to the approved drawings as
- 2nd DIN rail : up to 4HVAC channels are available shown is Figures 1.1.6 &1.1.7The labeling should
for AC control.
be as follows:
• It will house the power supply and gate way:
- D1, D2, D3… up to D16 for Dimmer Module
- 3rd DIN rail : dedicated 220V protected breaker
Channels. The connections termination should start
connection required.
from the right side of the 1stDIN rail.
• If more connection channels are required, please
consult UTT. - R17, R18, R19… up to R48 for Relay Module
Channels. The connections termination should start
• Its size is 615 x 435 x 101 mm (HWD). For more
information, please refer to UTT certified panel from right side of the 2nd and 3rd DIN rails.
vendor. • The details & rating of each load (for example:
chandelier, 500watt) should be mentioned clearly
in the apartment’s smart home layout as shown in
1.2.2 CONNECTION BETWEEN Figure1.3.2.
ADP & THE OPTICAL NETWORK
UNIT (ONU)
Figure 1.3.2:Apartment’s Smart Home System Layout Figure1.3.3: Apartment’s Bus Cable Layout 
• 1 No. 25 mm conduit should be provided between
the ADP and the ONU. It should enter the ADP and
the ONU from the bottom center portion only as
shown in Figure1.1.7.

24 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 25
There are two types of the DIN rail Modules where the - 4 x 3A channels of dimming output. • Each lighting load, exhaust fan, doorbell, and water
loads should be connected to within the ADP and a - 1 x 5A channels of dimming output. heater should have its own line (wire) connected
Gateway which are: to the relay module output. The neutral cable can
- 2 x 5A channels of dimming output.
be shared between the loads fed from the same
breaker and should return back to the ADP.
1.2.3.1 DIN RAIL DIMMER MODULE: • The loads connections to the relay module are
• Each Unit (vertical slot/sideboard of the Module) shown in Figure 1.1.6.
• The DIN rail Dimmer Module shown in Figure 1.3.5 from the dimmer module should be connected to
is used to dim the lights to a certain percentage as the same breaker with its neutral as an input from
well as to turn them ON/OFF. the EDB.
• The lighting loads in the living room, dining room, • Each lighting load should have its own line (wire)
and all bedrooms should be connected to the connected to the dimmer module output. The
output channels of the dimmer module(s). neutral cable can be shared between the loads fed
from the same breaker and should return back to
the ADP.
• Dimmable ballasts for lights should be installed by
the electrical contractor assigned from the client.
• The loads connections to the dimmer module are
shown in Figure 1.1.6.

1.2.3.2 DIN RAIL RELAY MODULE:

• The DIN rail Relay Module shown in Figure 1.3.6 is


used to toggle (ON/OFF) the lights, exhaust fans,
doorbell and water heaters.
• The lighting loads in the kitchen, corridors and
all bathrooms should be connected to the output Figure 1.3.6: DIN rail 4 Channels Relay Module
channels of the relay module.
• The doorbell, exhaust fans and water heaters in
Figure1.3.5: DIN rail 4 Channels Dimmer Module the home should also be connected to the output 1.2.3.3 DIN RAIL GATEWAY:
channels of the relay module.
• There are different type of dimmer module(s) to be • There are different type of relay module(s) to be
• The gateway shown in Figure 1.3.7 is required to
used, depending on the number of output (load) connect the smart home system to the TCP/IP
used, depending on the number of output (load)
network.
channels and the output (load) rating, which are: channels and the output (load) rating, which are:
- 2 x 0.75A channels of dimming output. - 4 x 10A channels of relay output.
• A dedicated 220V surge protected breaker should
be connected to the power supply of the gateway
- 4 x 0.75A channels of dimming output. - 8 x 10A channels of relay output. located at the last rail of the ADP shown in Figure
- 2 x 1.5A channels of dimming output. - 4 x 16A channels of relay output. 1.1.7.
- 4 x 1.5A channels of dimming output. - 8 x 16A channels of relay output.
Figure 1.3.4:Apartment’s Smart Home
- 8 x 1.5A channels of dimming output. • Each channel from the relay module can be
System Schematic Diagram  - 2 x 3A channels of dimming output. connected to a different breaker with its neutral as
an input from the EDB.

26 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 27
• The bus cable should pass by each back box 1.2.5 HEATING, VENTILATING,
without being cut where a minimum of 35cm from
the cable should be kept inside each back box (two AND AIR CONDITIONING (HVAC)
rounds inside the back box).
• The bus cable loop should be run inside 20 mm • Each thermostat requires a UK sized back box (3’’
conduits. All the conduits should be laid from the x 3’’) with a minimum depth of 47 mm. It should be
ground below the tiles and not from the ceiling labeled as T1, T2, and T3…etc.
except for curtains and sensors. • The bus cable loop should pass by the thermostat’s
• The looping is topology free (daisy chain, branch, back box without being cut where a minimum of
star, etc.) If the total amount of cable used within 35cm from the cable should be kept inside each
a bus run is not more the 300m otherwise back box (two rounds inside the back box).
Daisy chain is highly recommended as shown in • If the thermostat is located exactly next to the
Figure1.1.7. smart keypad, there is no need to have a separate
• 1 No. 20mm conduit with Cat.6 cable should be UK sized back box for it. The smart keypad will be
provided between the doorbell switch and the used to control the lighting as well as the AC.
nearest smart home keypad as shown in Figure1.3.9. • The location of each thermostat & its labeling
should be indicated on the smart home system
layout, bus cable layout and the schematic diagram
as in Figures 1.3.2, 1.3.3 &1.1.7 respectively.
• Depending on the FCU used, extend all the wires
(exclude neutral wire) terminated at each FCU
controller PCB to the ADP by using 25mm conduit
Figure1.3.7: DIN rail Gateway and label them accordingly in both sides. For
example:

1.2.4 THE SMART HOME KEYPAD Figure1.3.9: Connection between the Smart
Home Keypad and the Doorbell
- FCU1 cables will be 1Y, 1G1, 1G2, 1G3, 1R, and
AND THE BUS CABLE 1W.

Figure1.3.8: Smart Home Keypads


• 1 No. 20mm conduit with Cat.6 cable should be - FCU2 cables will be 2Y, 2G1, 2G2, 2G3, 2R, and
provided between the water heater conventional 2W.
switch and the nearest smart home keypad as - FCU3 cables will be 3Y, 3G1, 3G2, 3G3, 3R, and
• Smart home keypads, shown in Figure1.3.8, are shown in Figure1.3.10. 3W.
programmable keypads that consist of 4 to 8
buttons or an LCD with 12 buttons where each • Each smart home keypad requires a UK sized back
button can be used for a single or multiple actions box (3’’ x 3’’) with a minimum depth of 47 mm. It • The wires coming from each FCU should be
(scenes). should be labeled as H1, H2, and H3…etc. terminated at the 4th DIN rail of the 5 DIN rail
Type ADP or at the 2nd DIN rail of the 3 DIN rail
• A smart home keypad should be provided at the • The dimension of the keypad’s faceplate is 86 x 86 Type ADP
entry of each room, bathroom, kitchen & corridor mm (HW).
inside the home as shown in Figure 1.3.2. • A complete data sheets for HVAC system used
• The bus cable, supplied by UTT, should go out from should be submitted to UTT.
• If a bathroom is available inside a room & the the bottom center portion of the ADP in order
bathroom is close to the entry of the room, one to connect the back boxes of the smart home
keypad is enough for both of them. However, if the keypads, thermostats, curtains, multi-sensors,
bathroom is away from the entry of the room, two and the entertainment (E) outlet. The cable should
smart keypads should be provided: one for the come back to the ADP after passing by the last Figure1.3.10: Connection between the Smart
bathroom & the other one for the room. back box in order to close the loop. Home Keypad and Water Heater Switch

28 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 29
1.2.6 SHADES AND 1.2.7 MOTION SENSOR/ 1.2.9 ENTERTAINMENT (E) 1.2.10 AUDIO (A) DISTRIBUTION
CURTAIN CONTROL MULTI-SENSOR OUTLET • Each room (zone), which requires an audio
• According to the telecom guidelines, at least 1 dual distribution, will need the following to be installed in
• Two back boxes with blank plates should be • A sensor is used to trigger the programmed
data socket is available in the living room zone at the ceiling:
provided at the top right side of all windows at actions once the presence of a person is detected
the TV location. Next to this data socket, an outlet - 1 No. Amplifier: requires 220v power supply and
the curtain location (10-20 cm away from the • Two Type of sensors will be used as follows: labeled as E should be provided as shown in Figure Cat.6A cable from ONU.
window frame) as in Figure1.3.11. As a suggestion,
1.3.12 along with a dual power socket. - 1 No. Pair of speakers: 1 speaker cable from each
creating a curtain box helps hiding the back boxes.
A. P IR Motion Sensor: speaker in same zone to the amplifier.
- Each bathroom, entrance, and kitchen inside the • 1 No. E outlet will be required at each zone.
home should have a motion sensor on its ceiling • A Cat.6 cable should be extended inside a 20 mm
and it’s optional to have it for the other rooms & conduit from the amplifier location to the E outlet in
corridors. A Cat.6 cable should be extended inside the room. The Cat.6 cable should be labeled from
a 20 mm conduit from each motion sensor to the both sides as E1, E2 and E3…etc.
nearest keypad available in the room. The Cat.6
The location of the speakers & its labeling should be
cable should be labeled from both sides as S1, S2
indicated on the smart home system layout, bus cable
and S3…etc. according to the number of motion
layout and the schematic diagram.
sensors to be installed.

B. M ulti-Sensor:
1.2.11 IP CAMERA
- In the living room zone, a multi-sensor labeled as • An RJ-45 outletand single power outlet should be
M should be provided at the center of the ceiling provided at the camera location.
near the TV location. The bus cable loop should • The Cat.6A cable of the RJ-45 outlet should come
pass by the multi-sensor round back box without from the ONU& be labeled as IP1, IP2, and IP3…
being cut where a minimum of 35cm of the cable etc.
Figure1.3.12: E Outlet Layout
should be kept inside the round back box (two
rounds inside the back box).etc. • The location of each IP Camera & its labeling
should be indicated on the smart home system
- The location of each sensor & its labeling should • A UK sized back box (3’’ x 3’’) with a minimum layout, bus cable layout and the schematic diagram.
Figure1.3.11: Shade & Curtain Connections be indicated on the smart home system layout depth of 47 mm should be used for the E outlet.
and bus cable layout as in Figures 1.3.2&1.3.3 • The bus cable loop should pass by the E outlet
• The first covered back box has a power cable. It is a respectively. According to the number of Multi- without being cut where a minimum of 35cm from
1.2.12 IR RECEIVER
normal power used to energize the curtain’s motor. sensors to be installed, it should be labeled as M1, the cable should be kept inside the back box (two
• The second back box is a UK sized back box (3’’ x M2 and M3…etc. rounds inside the back box).
• IR receiver triggers the programmed actions once
the end user uses an IR remote control.
3’’) with a minimum depth of 47 mm. It should be • The location of the E outlet & its label should be
provided with a blank plate and labeled as C1, C2, indicated on the smart home system layout, bus
• The bus cable loop should pass by the IR receiver
and C3…etc. round back box without being cut where a minimum
cable layout and the schematic diagram as in
of 35cm of the cable should be kept inside the
- Inside this covered back box, the bus cable loop Figures1.3.2&1.3.3 respectively. According to the
round back box (two rounds inside the back box). It
should pass without being cut where a minimum of number of Entertainment outlets to be installed, it
should be labeled from both sides as IR1, IR2 and
35cm from the cable should be kept inside each should be labeled as E1, E2 and E3…etc...
IR3…etc.
back box (two rounds inside the back box).
• The location of each curtain & its labeling should be
• The location of each IR receiver & its labeling
should be indicated on the smart home system
indicated on the smart home system layout and bus
layout, bus cable layout and the schematic diagram.
cable layout in Figures 1.3.2& 1.3.3 respectively.

30 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 31
1.2.13 PENTHOUSE & TOWN
HOUSE
02 ANNEXURE
For a penthouse or town house consisting of a lower • Section 1.3.3, all the lighting loads, exhaust fans,
floor& upper floor, sections 1.3.1 to 1.3.12 are and water heaters of the upper floor should be
applied; however, the following should be taken into connected to the secondary ADP. A dedicated
2.1 IMPORTANT NOTES 2.2 REQUIRED DOCUMENTATION
considerations for: 220V surge protected breaker should be • This design guide explains in general, all UTT FOR HANDOVER (PROJECT
• Section 1.3.1, a secondary ADP should be fixed connected to the power supply of the gateway requirements that will facilitate the provision of COMPLETION) NOC/BCC
at the upper floor next to the upper floor EDB. 1 located at the last DIN rail of the secondary ADP. automation services to new buildings, yet the
No. bus cable should be extended between the • Section 1.3.4, the bus cable of the upper floor requirements indicated in the ‘NOC’ (No Objection ISSUANCE
secondary ADP and the ADP located at the lower keypads, thermostats, curtains, sensors, and E Certificate) should be fully complied. Design Stage (before starting construction)
floor (which is called Master ADP) inside a 25 mm outlet should be extended directly to the secondary • Developers/Consultants/Designers/Contractor • Design Drawings approval form signed and
conduit. The bus cable should be labeled from both ADP. must liaise with UTT at the design stage stamped
sides as L1. • and obtain UTT approval on the final Design
Section 1.3.7, a Multi-sensor should be provided at • 2 sets of the design drawings stamped by the
• Section 1.3.2, another 1 No. Cat.6a cable should the upper floor living room area. Drawings. consultant
be extended from the ONU to the secondary ADP • Section 1.3.9, an E outlet should be provided at the • UTT approval is valid for one year from the date of • 1 CD with the CAD drawings, CD shall be labeled
inside a 25 mm conduit. The Cat6a cable should be upper floor living room area at the TV location. the approval, the Owner/Developers/Contractor with all the details
labeled from both sides as L1. should re-submit the design drawing for renewal.
• Contact list of the concerned engineers for the
• Minimum two sets of automation design project (consultant)
drawings must be submitted for study and
approval. Before tendering, the submission shall For Al Reem Island, all drawings to be submitted
be done through the proper channel through M/s Bunya.
• Where deviations/comments/amendments are For Rawdhat Abu Dhabi, all drawings to be submitted
advised on the Design, Drawings must be by consultant directly.
corrected and re-submitted for approval. Smart Building Automation Drawing approval
• UTT through its certified venders will supply and 1) Cover letter from Consultant with drawing
install all the smart home/smart home ready reference for each sheet
cables and equipment after receiving confirmed 2) Two hard copies of Home Automation System
order from the Owner/Developers/Contractor. drawings with soft copies in two separate hard box
This scope is not allowed to be carried out by any files clearly labeled with Sector & Plot
other party. 3) All contact information for Main contractor, MEP
• On completion of the requirements, any comments contractor and Consultant to be included along the
and snags advised by UTT Building Inspector must cover letter.
be attended by the Contractor or Owner of the
Mock up inspection
building, soon to avoid delays in the issuance of the
Building Completion Certificate. • Mock up inspection request form signed and
stamped
• One set of approved ‘As-Built’ drawings
must be submitted along with the Building • Mock up Layout and schematic diagram showing all
Completion Certificate, which will be certified by automation details.
UTT. Final inspection stage
• Final inspection request form signed and stamped
by all parties

32 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 33
• 1 set of As Built Drawings (as per approved design • Unit types & apartment numbers sheet. 2.5 LED FIXTURE MATERIAL TAKE OFF CLIENT SELECTION
drawings) signed and stamped by the consultant, Building Completion Certificate (BCC)
main contractor and MEP contractor Project Name: Plot: Sector:
• All of the above fully complied 100%
• 1 CD with the CAD drawings, CD shall be labeled
• Compliance with Smart City Infrastructure BCC
with all the details
requirements. Color
• Contact list of the concerned engineers (Facility Model False Qty Lumens
S. No. Item Discription Area Dimmable Temprature Note
Management, Main contractor & MEP contractor) No. Ceiling Required Required
(k)

2.3 APPLICATION FOR 2.4 APPLICATION FOR Apart. LIVING YES/NO


MUST BE
DIMMABLE
BUILDING PLAN APPROVAL BUILDING INSPECTION
Apart. MUST BE
YES/NO
BEDROOM DIMMABLE

Kitchen YES/NO

Apart. Corridor YES/NO

Main Lift Lobby YES/NO

Toilet YES/NO

Shower area/
YES/NO
Toilet

Gym YES/NO

Apart.
Corridor+ lift YES/NO
lobby

Service area YES/NO

Parking YES/NO

Staircase YES/NO

34 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 35
2.6 INSPECTION CHECKLIST Date: / / 5 Motion Sensor

Project: Sector: Plot: 5.1 Location Match Not Match Match with comments

5.2 CAT-6 Cable Installed Not Installed Installed with comments

Inspection Types: Regular Final 5.3 Labeling Done Not Done Done with comments
1 Enclosure
6 Multi-Sensor
1.1 Termination Done Not Done Done with comments
6.1 Location Match Not Match Match with comments
1.2 Labeling Done Not Done Done with comments
6.2 Bus Cable Installed Not Installed Installed with comments
1.3 CAT-6 Installed Not Installed Installed with comments
6.3 Labeling Done Not Done Done with comments
1.4 Bus Cable Installed Not Installed Installed with comments
7 Access Control System
1.5 Gateway Power Connected Not Connected Connected with comments
7.1 Location Match Not Match Match with comments
2 Keypad
7.2 Node Cable Installed Not Installed Installed with comments
2.1 Location Match Not Match Match with comments
7.3 Labeling Done Not Done Done with comments
2.2 Back box (47mm) Installed Not Installed Installed with comments

2.3 Bus Cable Installed Not Installed Installed with comments 8 Entertainment (E) Outlet

3 HVAC 8.1 Location Match Not Match Match with comments

3.1 Back Box (47mm) Installed Not Installed Installed with comments 8.2 Back box (47mm) Installed Not Installed Installed with comments

3.2 Bus Cable Installed Not Installed Installed with comments 8.3 Bus Cable Installed Not Installed Installed with comments

3.3 Termination Installed Not Installed Installed with comments 8.4 Labeling Done Not Done Done with comments

3.4 Labeling Done Not Done Done with comments


9 Audio (A) Distribution
4 Shade & Curtain Control Not Match Match with comments
9.1 Location Match
4.1 Location Match Not Match Match with comments
9.2 E Outlet (47mm) Installed Not Installed Installed with comments
4.2 Power Installed Not Installed Installed with comments
9.3 Cat.6 Cable Installed Not Installed Installed with comments
4.3 Bus Cable Installed Not Installed Installed with comments
9.4 Labeling Done Not Done Done with comments
4.4 Labeling Done Not Done Done with comments

36 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 37
10 IP Camera

9.1 Location Match Not Match Match with comments

9.2 RJ-45 Outlet Installed Not Installed Installed with comments

9.3 Labeling Done Not Done Done with comments

11 IR Receiver

11.1 Location Match Not Match Match with comments

11.2 CAT-6 Cable Installed Not Installed Installed with comments

11.3 Labeling Done Not Done Done with comments

General Notes:
………………………………………………………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………………………………………………………

Next Inspection date …………………....……………

All the comments should be rectified maximum before two days from the next inspection date

UTT Engineer: ………………………………………………………........…………..


Signature………………………………………………………………........……………

Site Engineer Name: ………………………………………….....……………….


Signature: ……………………………………………………………......………………

38 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 10 – 27. November, 2016 39
P.O.Box: 51436
Abu Dhabi
United Arab Emirates
www.utt.ae

40 UT TECHNOLOGY – Smart Building Automation Design Guidelines v 9 – February, 2016