You are on page 1of 28

Community service and research development

Pilot proposal for establishing museum art gallery here in University of


Gondar

Introduction

Before lost of identity and loss of an idea

In the universal form of nature which confirms that the existence of perfection in invention and
creation of points, lines, forms, shapes, structure and abundance of a given entity which existed
physical, ideally, emotionally and spiritual will always want to preserve its existence, identity,
character and intuition in one way or another; if you think this is just an idea see deeply the nature
of everything (human nature and mystery of reproduction in developing young prints one, stones
fragmenting their biomass to preserve the parent material, water all ways flowing to and develop a
potential to flow or transform in to its less or null existence, environment always straggling for
equilibrium and its future existence in time, even jellyfish took so many years evolution of its
existence to adopt and confirm its existence eternally in its environment; if you see it with this
virtue people, society, old civilization, light of wisdom, center of innovation, the eye of creator,
keeper of the keep , institution of all thing for all things which are one and one, continuity of light
beyond imagination, coherency of existence with existed one, preservation of idea and thought
which is conceived on the pile gram of ancient civilization, institution which shared a vision to its
environment and most of all building an essence of an idea which confirm nature are a bunch of
flawless lies or Malibu that we tell for ourselves, for eager mind of tomorrow(felon student) and
for community without implementing one thing which is confirming the existence an idea which
preserve the perfection of existence in the current environment of the campus, so as the team
researcher of ancient artifact, legend, history, art and architecture we witnessed and want to
hypnotize is one truth which reconcile all other lies& Malibu is that the university have to reclaim
our right to preserve what is and was ours and keep it in any forms of existence. Since our
institution University of Gondar is a product and essence of the surrounding environment after all
the product of the university has to be a part of the environment that is why it started and

1
Community service and research development
established by responding the acute community need, seeking an institution which remained
committed to growth, innovation and development which leads to the start of its journey with
nature since 1954 E.C to overcome and solve society problem through education and medical
innovation, keeping an idea and be a part of country development since then the university had
achieved many millstones both for the society and the country in tamarind’s ways by the
parameters devised as goal, mission and vision parameter in fulfilling the progress of initial idea.

The University of Gondar is greatly committed on investing in the future to create a better
tomorrow. Alongside our developing program and delivery we want to ensure that we want to
establish firm foundation to support the growth an outstanding educational infrastructural
establishment, as such we propose to invest in developing infrastructure which remind us that our
university is the first generation university which start 6 decade ago by imagining that which is
university of Gondar is dedicated to protect architectural history, socio economical development
and one part of the society and historical and ancient Gondar town.

Since it is the foundation of all other campus it has to have its own foundation them and a form
work to memorize its contribution to the 60 years journey goal achievement and mission, vision
and other dedicated commitment to achieve the targeted result of the campus and conduct the
given educational system and the expected result from the first generation institution objectives.

As we all know university of Gondar has been contributing in many aspects of science technology,
social and community contribution to crate the better future of better tomorrow , as an artist and a
member of the community we saw some light of future what if the university of Gondar can
transfer a big and undeniable knowledge to both the community, customers (fellow undergrad and
post grad students), society and the tourist which came all over the world, by sensitizing and
generating the coherent future which reflect both the entire principle and goal achievement and
foundation for platinum anniversary foundation of the university of Gondar with the civilization of
the society like FASIL castle.

It is believed that when given institution reflect the entire concept of governing principle and goal
to the community by using visual communication and graphic futures is the better way to conceive

2
Community service and research development
the idea easily in the daily base of life on the purpose of vision sharing and perfection of goal
achievement.

In order to share the mission, goal and vision of the university we have to transfer the intuition
great achievement of the university to the community, the country, nation and respected gust by
using non verbal communication or visual effect in order to do that we have to use the public place,
space, the street and the residence of presidential office and the campus as a main area to transfer
the genuine idea to the people by using architectural, artistical and graphical art to memories and
interpret the mission of the platinum jubilee to solve the mystery of tomorrow.

3
Community service and research development
Background

Problem identification

As it is well known the University of Gondar is one of the first generation university from our
counter but as you recognize it the entire campus is not that much well reflecting the fact its legacy
and achievement to the environment and history of the ancient Gondar town.

1. Luck of reflecting character of history and mystery of the University of Gondar as unique
interior artistically master piece works.
2. Luck of ancient imitation works which preserve the concept of an ancient original idea on the
mind of imaginative self cultivated inspiration (especially students).
3. Luck of historical aesthetical value and beauty as well historical reflective reception area for
Gusts, higher officials and tourists.
4. Forgetting the iconic, big life time contributor and life time achiever of the society and
university community to the achievement of the university journey.
5. Luck of Architectural and Artistical works which present the estimated Goal and persuaded
mission and vision of platinum jubilee.
6. The luck of unique architectural and artistic work which aims on income generation and entire
image establishment of the university as well the redecoration of the presidential office as
holistically traditional museum with the similar concept of Addis Ababa university 6 kilo
campus museum.
7. Luck of Artistical work which inspire and reflect the three concept of the University which is
Growth, innovation and development and making them the part of the museum.

Method of assessment

In order to exploit the problem and assessment of the proposed action we use the sight analysis of
the entire town including the campus to select the favorable place and collection of work that has
to be included.

4
Community service and research development

Analysis

The project team of university interior feature and restoration has take care the following analysis.

Cause and effect analysis

The simple form of existence of the residential space and absence of interior compartment causes
luck of grace of the campus and missing the concept of idea transmission by using this and other
major space area which host and hold a lot of people on their day to day activities.

Stakeholders’ analysis

In our research team analysis we selected we hope tow stake holders on accouardanc with their
intimate participation and collection of heritage and historical collection and budget fund for the
artistically and architectural works.

1st stake Holder is university of Gondar.

2nd stake holder is any governmental and nongovernmental organization or contribute and donator
of any types of historical and cultural heritage monuments and work of art which can be arranged
and forms an agreement with the university of Gondar with common and mutual understanding
and beneficiary both idealist who want to confirm their green entity on the inspiration their
perspective on the presentation of eager minds of tomorrow.

Cost analysis and return period

For income generation and return of the cost we analyzed the situation and came up with the
following idea.

1st official open the museum for public and visitor on non working day of the week including
holydays by announcing by using official website of the university advertisement and the
connection which will be made with private and governmental tour agencies and arranging the
following initial cost.

A. For Adult and old people nominating 5 Birr entrance cost.


B. For children and students from other campus 3 Birr entrance cost.

5
Community service and research development
C. For international visitors and foreigners 15 Birr entrance cost.

As the team we consider the time value of money and consideration of 2-3 days of visiting day per
week we arrived on the computational calculation the return period of reasonable durational
period of time which wisely consider the reason of expenditure which is the well bingnes of the
community.

PROJECT PURPOSE OF PROPOSED ACTION

The project team of university interior feature and restoration is proposing to undertake
improvements to the general and specific feature of University of Gondar that would enable the
university to produce a hot spot for tourist & visitor attraction to generate income, be a reflection
of Gondar town historical architecture and space for enlightenment & consistent work to the
intellectual student of tomorrows generation by producing an image of artistically integrity.
Involving the professional artist, engineers and hired architectural professionals that meets the
standards for unrestricted tradition historical artistic ale work (i.e paint, sculpture, engraving work
and graphical art), standard traditional and historical architectural design and & aesthetics work.
The District is also proposing to directly be a place of history and mystery to future by reclaimed
hot spot and land mark by inducing the concept of museum to the society as well gusts.

Specific objective

A. Ensuring the structural, historical and functional quality of the university of Gondar by
establishing museum of art that can be the meeting place
B. To make our art museum an instrument to research programs in our university to undertake
research, the museum provides an unrivalled wealth of information and resources as well as
access to archives, scholars and highly trained professionals.
C. Be a solution for the town and the community by creating space area and museum to reflect
the heritage of the society, contribution of the town to the world and contribution to modern
art and education.
D. To make the university of Gondar one of the heritages of Gondar town which is to be visited by
foreign tourists and local one and place of reservation and restoration of the community lost

6
Community service and research development
values, heritage and great innovation for science, Architecture, Ethiopian traditional art,
history, literature, ….etc.

General objective

Other than the direct and specific objective our team project for legacy generation and character
building up for the reflection of platinum jubilee, business and development had surveyed and
analyses’ final came up with the indirect and general objective in overcoming the problem as an
objective.

The general objective of establishing the museum of art here in the university of Gondar is to
create a meeting place for art, knowledge and experience and we will present the public with
exciting offering, rich art collection which show the historical background of university of Gondar
historical background of university of Gondar like memorizing those farmers who contributed their
land to our university, the cultural heritages of the ancient town Gondar. Which could be open to
the community of our university and to the society of Gondar town. To maintain the museum art
gallery in the university of Gondar and to exhibit, promote and preserve artifacts in the form of
visual arts such as painting, drawing and graphics art relating to the history of the ancient town
Gondar focusing on the important heritages and cultures of the society. To promote education,
research and publication related to the Gondar town. Our museum of art collects the work of arts
of the artist’s studies, conserves and presents significant pieces about the ancient town of Gondar
and some very important facts of university of Gondar.

SCOPING AND ISSUES

The main concept of this project proposal using the non verbal ways of communication to
memorize and reestablish the Goal, vision and mission of the university in our day to day life by just
creating graphical, illustrative, transgenic , monumental and mistrial forms and future to reflect
them.

7
Community service and research development
Methodology and strategy

As a goal of producing standard, internationally and historical recognizable interior and gate design
and implementation by inducing architectural and artistical value, the proposing team will use a
procedure, method and strategies in produce a better common ground and income generation for
the university of Gondar we will propose five phase of design and implementation stage to achieve
the targeted objectives so as a foundation and beginning of this dream we will start the project on
the museum design and implementation by using presidential interior wale face and interior folds
which is left with no purpose.

Strategy one

Introducing a master piece work of art which will be produced by Artist Eskinder Berhanie

Strategy two

The paintings, drawings, graphics arts and work will be done by artist Eskinder Birhanie and two
professional collogues who will be haired according to their professional resume.

Strategy three

By using haired professionals of architects the entire museum interior design and a form work of
master piece display.

Strategy four

If it is possible and we have the fund to include some historical pilgrim which are on seal and
personal collections to fully accomplish the spirit contemporary museum according to roman
museum development standard

Stage five

Completing all works of the entire element and adjust the interior for display and visit with in non
working days and if possible to make sure it is available on working days without affecting the
movement of workers and official without causing any physical problem to displayed work of art.

8
Community service and research development
Phase one

Establishing the museum of art in our university.

Proposed procedure

In order to produce such features and special character the artistical product has to be reflective
coherent and concept transferring and beauty complication and historical transgenerice.

1. What is the time period of the phase?


This phase will start September 15 and will have the duration period of five and half month.
2. What are the geo-political & history reflective characters being proposed?
This phase will have tremendous future which reflect the demography and ancient civilization features
of Gondar town as well the value of the university to the town to generate this idea our proposed action
is establishment of a contemporary museum gallery which correlate the university and the town.
3. What sites or buildings those are associated with that phase?
The university of Gondar presidential office.

4. What are the characteristics & design of architecture and fine art proposed by the phase?
 By using the president office space rearrangement and decoration establish
contemporary museum gallery which need a work of 40 permanenent long living pieces
of works of art including paintings and graphical art (engraving, scratching and wood
cut).
 Memorial picture for life time contribution to the university special peasant who have donated
their farm land to the university.
 Decoration of the presidential office and selected schools and faculty officials building by using
historical, nominal, educational, mysteries, memorial, and recognition pictures and pictures of
work of art in presidential office or other arbitrary place.

5. Special future of the phase

 Character building up futures and pictures will be used to imply the history versus mystery.
5. Sample of similar works which will be included

9
Community service and research development
For the memorization and appreciation of farmers, people and peasants’ which contributed their
land and have done great things for the university form.

10
Community service and research development

11
Community service and research development

Phase two(Preserving the lost form of line)

Design special features and character for each campus and collages

Proposed procedure

12
Community service and research development
In order to produce such f features and special character the artistical product has to be reflective
coherent and concept transferring and beauty complication and historical transgenerice.

1. What is the time period of the phase?


This phase will start after the completion of phase one and it will have the duration period of three
months.

2. What is the geo-political & history reflective characters being proposed?

Proposed action is establishment of a permanent monuments and landscape which can serve as
Architectural museum which correlate the university and the town.

The design and implementation of the features will be the architectural and artistical design which
reflects the ancient architectural development with holding mystery’s architectural concepts to
cherish and reflect the legacy of the university of Gondar platinum jubilee.

3. What sites or buildings those are associated with that phase?

 Rehabilitate and remodeling the landscape of the university public squares of each campus.
 Design, modeling and construction of historical monument, inspirational statues and engraving
work to preserve and present visually the long distance achievement of the university of
Gondar.
 Design and implementation of hotspot and beauty space generation which is designed and
proved by well known higher professional.
 Artistically Gat decoration and restoration work.
 Rehabilitate and revolutionaries the announcement boards of each campus.
6. What are the characteristics & design of architecture and fin art proposed by the phase?
 Design and implementation of public squares which show the concept of history vs mystery by
using architectural and artistical piece of work.

5. Special future of the phase

 It will design and implement historical feature which can serve as a compliment of the campus
beside the tourist attraction places like churches, mosques and Fasill castle.

Phase three(Research the shape of an Idea)

13
Community service and research development
Design special features and character will be documented on the project after the grant of the
budget of the tow continuative phases.

1. What is the time period of the phase?


 Will be documented on the project after tow continuative phases grant and
implementation.

2. What is the geo-political & history reflective characters being proposed?

 Will be documented on the project after tow continuative phases grant and
implementation.

3. What sites or buildings those are associated with that phase?

 Will be documented on the project after tow continuative phases grant and
implementation.
4. What are the characteristics & design of architecture and fin art proposed by the phase?
 Will be documented on the project after tow continuative phases grant and
implementation.
5. Special future of the phase
 Will be documented on the project after tow continuative phases grant and
implementation.

Phase four

 Will be documented on the project after tow continuative phases grant and
implementation.

Phase five(What is lost on the structure entity)

 Will be documented on the project after tow continuative phases grant and
implementation.

14
Community service and research development
AREAS OF RESTORATION AND ISSUES TO BE RESOLVED

By target entire residence area of the university targeted project area we devised and allocated the
whole implementation work in five strategies and different area starting from decorating and
converting it in to historical and artistically gallery and museum of the president office. And it will
continue the Gat work of each collage and faculty (i.e Atse Tewoderos, marake and Ats Fasiel) by
designing and implementing conceptual nominal architectural and artistically works.

ENVIRONMENTAL CONSEQUENCES AND IMPACT SUMMARY

In order to briefly indicate the whole proposed architectural and artistically work on the
environment and its impact on the societal demography.

Phase No Environmental Aesthetical & Conceptual Historical vale

15
Community service and research development
Restoration functional vale value
Phase one It improve the It will change Bridging the gap It will reflect the
work concept of and improve the in between historical long run of
environmental aesthetical value knowledge and university of Gondar in
impact of of the interior information memorizing history to
construction and exterior transferring and oversee and resolve
and its design to communication mystery
compromising upgrade the skill.
to restore functional
nature and integrate
history
Phase two Improving the Design Upgrading and To use and implement
work quality of with determine and regenerating the the free spacec in filling
holed place to reflect on the functional and it up with the bridge
reflect many implementation structural historical structures to
environmental the exact concept of space develop historical
features purpose of the like public continuity and coherence
space in square
reflecting
aesthetical and
elegant forms
and features
Phase three -will be -will be -will be -will be documented on
work documented on documented on documented on the project
the project the project the project documentation
documentation documentation documentation
Phase four -will be -will be -will be -will be documented on
work documented on documented on documented on the project
the project the project the project documentation
documentation documentation documentation

16
Community service and research development
Phase five -will be -will be -will be -will be documented on
work documented on documented on documented on the project
the project the project the project documentation
documentation documentation documentation

Conclusion and recommendation

By the strategy that the university use to promote and give recommendation of progress on both
income generation and ground braking university development Goal achievement the top
management body has to give a chance for the idea which is raised from teachers to resolve the
problem of the university in achieving better future as one of the group which is organized and

17
Community service and research development
founded by the grate strategy of the university which is team arrangement of teachers to produce
idea and cooperation which is having five members,

1. Eskinder Berhanie (Artist)


2. Eng Aberham Belay (engineer)
3. Tewodros (Architect)
4. 6 professional hired workers according to field of profession
5. Graduating class students from department of architecture

Are willing to pursue their time and money in the achievement of the task by arranging it in the
new form and order so that it can satisfy all the goal requirement of the objective and take the
contract. So the university top management and Business and Development have to consider
and put on some work of adjustment of the agreement to give the contract for such motivated
and genuine teacher of the campus who will know the exact problem of the campus and ready
to make the difference

EXECUTIVE SUMMARY

So as a part of the university and apart of intellectual mind we survived and studied a lots of angle
and finally we arrived on point that we all missed something which tells us is today is a present of
past history or we just got lost in something to prove we are before or after the idea of identity?
You choose…..but as a summery and recommendation we recommend that if the university grant

18
Community service and research development
and implement this project this project proposal will facility the program of mission vision and basic
back ground definition of a way to media to induce and conceive the idea in broad way.

So we recommend the university of Gondar top management has to give a great consideration to
this project proposal and grant the budget to keep the university legacy and ways of transferring
the 60 years journey goal achievement reflections starting millstone to diamond Jubilee.

Budget brake down for Phase one Project

In order to design and implement the whole project with the reasonable duration period of
time we need the 50% expenditure requirement of the project proposal on the project team
conducted the survey and analysis and came up with the following cost estimation and
specification.

19
Community service and research development
50 % advance payment to the completion of feasible work according to the millstone of the
team task accomplishment.

Item Unit Number/ Unit price in Birr Total price in


Amount Total Birr
MERDOFA Meter 50 M 50 .00 2500
MORALIE PIECE 2 PIECE 400.00 800
COLA PIECE 25 70 1,750
ACRILIC PIECE 200 PIECE 500.00 100,000
PAINTS
OIL PAINTS PIECE 50 PIECE 500.00 25,000
STRING METER 50m 20 1000
BRUSHES PACKET 20 100.00 2000
FRAMES PIECE 20 5000.00 100,000
REFRESHMENT 10,000
LAMPS PIECE 40 300.00 12,000.00
BANNERS PIECE 20 1000 20000
SUB TOTAL 275,050

Personal costs

No. Budget line Expenditure


Unit Quantity Unit cost Total cost
1 Investigators market 2 15 200 6000
analysis and coor

20
Community service and research development
participants on this dinat
project advance work es
compilation.
2 Perdium for drivers 15 4 200 12000
3 Perdium for journalist 3 3days 2000 18000
4
Sub total 26000

Background profile and previous experience of the team

As it is well known the artist has conducted the first in kind art exhibition, temporary
museum implementation by using the existed space and residence on the Taye Belay Hotel
by the great contribution of the University of Gondar. For memory refreshment.

21
Community service and research development

1. By using ground space and grand stare of the residence


A. Display of paints on the Architectural space resolution

B. Display of paintings on the stairs case arrangement

2.
3.
4.
5.
2. By using grand stare top space of the residence

3. By using artistically values to control visitor’s attention and inspiration.

4. Using deep wisdom color psychology to reflect the understanding level human site.

22
Community service and research development

5. By using paintings to reflect dimensioning and value of paint on the viewers


direction.(application of colure in paint on 3 dimensional reflection).

6. By using paint to reflect human emotions and interpretation art on their life.

23
Community service and research development
ANNEXES: logical farm matrix
Illustrations and Tools for the a Project Proposal

Project description Performance indicator Means of Assumptions


verification
Goal Presentation and hand The start of visiting
Contemporary museum over of museum by for gust and
Development. using the targeted sit university
area. community on
reasonable prize
weather in
working or non
working days.
Purpose Entrance fee collection Conformation of We assumes that it
Income Generation and on the way of top the financial body will have a great
preservation of legacy. management body and quarter report asset on hot spot
adjusted way and a of the visitors generation and
place which will be facilitating body. recognition of the
crowded even if in non museum.
working day.
Component objectives: - The presents’ of - A means of - We assume that
- First museum in town traditional art of artistic rethem the concept of
- Standards of community the community. reflection on community
structure. - A collection of the essence of enlightenment
- Be an example of today’s works which reflecting the and the
gift on the hope of reflect nobleness of component background and
yesterdays history. initial entity and and competent backbone of the
- means of way to reflect the progress curve objectives. historical
our persuasion with the of wisdom reflection will
integrated complexity analogy. . produce a sense
nature with the paradox of inspiration
effect of the universe to and deep sense
sustain its homeostasis of
with true evolvement of understanding
course correction to the the environment
stigemated or in corrosive
of perespect of our
profession.
Outputs: - Professional and - After the We assume that the
- Production of pure spiritual completion of quality and the
innovative work of a given qualification of the entire integrity of the work
profession. expressing the project we will will reflect the whole
- Production of media element in its conducted the targeted objectives
which is the mirror image natural and first trial that we expect.
of the initial entity of the nominal form. museum show
historical preceding - Wide way of for a 1 month
community. acceptance of the durational
handovering period of time
committee elected to conform the
candidates to judge completion of
the quality and the project and
quantity of the the starting of

24
Community service and research development
products. the display of
the project
which can
serve as the
source of the
information to
collect the data.
- - and the other
is using the
financial report
of the entrance
fee collection
report and the
comment of the
visitor.
Activities: - we arranged a a schedule - the progress rate - and implementation
-restoration of the interior of time to complete the report of the team team believe that we will
work. required items work which which will be complete the if whole
-introducing 40 different work has to be presented on the presented in every work of research of art
of art which reflect the museum. three week. bud jet is released on the
intellectual integrity of ancient expected durational
civilization. period of time after five
- months we will
complete the task.

25
Community service and research development
2. Milestone Chart

Milestone Date on original plan Date from revised plan Date actively achieved
Agreement December 2 2015 Could have
completion. arguable and
reasonable day
fluctuation.
The completion of June 5 2016 Could have
artistic work and arguable and
whole item reasonable day
presence for display fluctuation.
and some
Architectural
readjustment.
Completion of July 3 2016 Could have
combined arguable and
artistically and reasonable day
architectural work fluctuation.
which is ready for
the start of the
museum.
The official starting June 12 2016 Could have
day of the Glorious arguable and
museum. reasonable day
fluctuation.

26
Community service and research development
3. Stakeholder table

Stakeholders Interests Potential project Relative Priorities of


impact (+, -,?) interests (1 - 5)
Primary funding + 1
(uog)
Secondary Donation an + 2
(Peoples) contribution

27
Community service and research development
4. logical Sequence of activities

Number of activities to be Activity Activity Description Number of


completed before an number activities to
activity begins begin after
the activity
2 2 Participatory planning 2
6 6 Community mobilization for heritage restoration. 6
12 12 Material 12
40 40 Completion of the paints 40
8 8 Hire professionals 8
10 10 interior planning 10
6 6 Completion of the combined work building 6

28

You might also like