Professional Documents
Culture Documents
22
Name: MOHD. NASIR .S/O Mr. ABDUL SATTAR Sanctioned Load (KW/KVA) 1.00/ CA No. 60024345831
Contract Demand Energisation Date 01/01/2019
Billing Address: KH.NO. 4 4TH FLOOR STREET NO Security Deposit 600.00
3 & 4 SANGAM VIHAR LANDMARK NEAR PEHALWAN Power Factor SLD Charges 3000.00
CHOWK DELHI 110084 District SHALIMAR BAGH Connection Type PERMANENT
Supply Address:KH. NO. 4 4TH FLOOR STREET NO. Zone Sant Nagar Tariff Category Domestic Lighting DL
3 & 4 SANGAM VIHAR CITY DELHI 110084 MRU No. SB17A001 Bill Basis Actual(KWH)
LANDMARK NEAR PEHALWAN CHOWK Walking Sequence 307/1084/005 Bill Remark Bill On Reading
Mobile/Tel No. 9211646629 Pole/Pillar No. 532-36/6/3 Bill Date 09/06/2022
E-mail Bill No. 12004317568
ECS/EBPP
Due Date
27-JUN-2022
No.41696559,MF= 1.00 (Immediate for Arrears)
Status(Visual Inspection):OK,Single Phase
Total Amount Payable
08/06/2022 06/05/2022
KWH 4745 4249 496
Rs. 2870.00
MDI KW 2.44
For any help related to Online registration of New Connection request, please
contact @ 24*7 helpline number-19124 or What's App No-7303482071 or Live Bill Period 07/05/2022 to 08/06/2022
Chat with our Executives at www.tatapower-ddl.com
Interest accrued for FY 2021-2022 ,already adjusted in bill no.
Days: 33 Month: 1.0732
10407961353(Generated for the period 04.03.2022 TO 04.04.2022 ) for Rs.
42.00 ,TDS deducted Rs. 0.00
Total 2043.50
2853.91
(The Connection shall be liable to be disconnected on non-payment of all payable dues including arrears, after notice as per section 56(1) of the Electricity Act,2003 read with
chapter VI of DERC (Supply Code and Performance Standards) Regulations 2017).