Platform SCP
Original Operating Instructions
Instructions for assembly and use (Method statement)
© by Doka GmbH, A-3300 Amstetten
2 999805802 - 03/2016
Original Operating Instructions Platform SCP
999805802 - 03/2016 3
Original Operating Instructions Platform SCP
Contents
6 Introduction 19 Platform SCP – Lifting unit attached on
both sides
6 Elementary safety warnings
19 General overview
9 Eurocodes at Doka
20 System overview
10 Doka services
24 System dimensions
12 Variable lifting units – one system
26 Structural design
13 Intended use
26 Loading data
27 Service loads
15 System description
16 Two construction methods – one system
28 Anchoring on the structure
17 Schematic sequence of start-up phases
28 Suspension point in concrete
18 Functional principle
38 Start-up phases
38 Starting up
40 1st casting section
41 Erecting the working platform and the
formwork
46 Attaching the girder grille
50 Suspending the formwork and platforms from
the girder grille
54 Mounting the hydraulic cylinders
56 Finishing the platform and enclosure
62 2nd casting section
64 3rd casting section
70 Pre-assembly
71 Assembling the base beams
73 Assembling the vertical scaffold
75 Assembling the girder grille
80 Clamping-connections for assembling the
girder grille
86 Mounting the Upper cylinder connector SCP
87 Assembling the working platforms (Level 0)
93 Assembling the working platforms (Level +1)
94 Assembling the enclosure
97 Dismantling
4 999805802 - 03/2016
Original Operating Instructions Platform SCP
999805802 - 03/2016 5
Introduction Original Operating Instructions Platform SCP
Introduction
Elementary safety warnings
User target groups Remarks on this booklet
▪ This booklet is aimed at all persons who will be work- ▪ This booklet can also be used as a generic method
ing with the Doka product or system that it describes. statement or incorporated with a site-specific
It contains information on the standard design for method statement.
setting up this system, and on correct, compliant uti- ▪ Many of the illustrations in this booklet show the
lisation of the system. situation during formwork assembly and are
▪ All persons working with the product described therefore not always complete from the safety
herein must be familiar with the contents of this point of view.
booklet and with all the safety instructions it contains. Any safety accessories not shown in these illustra-
▪ Persons who are incapable of reading and under- tions must still be used by the customer, in accord-
standing this booklet, or who can do so only with dif- ance with the applicable rules and regulations.
ficulty, must be instructed and trained by the cus- ▪ Further safety instructions, especially warnings,
tomer. will be found in the individual sections of this
▪ The customer is to ensure that the information mate- booklet!
rials provided by Doka (e.g. User Information book-
lets, Instructions for Assembly and Use, Operating
Instruction manuals, plans etc.) are available to all Planning
users, and that they have been made aware of them
and have easy access to them at the usage location. ▪ Provide safe workplaces for those using the form-
▪ In the relevant technical documentation and form- work (e.g. for when it is being erected/dismantled,
work utilisation plans, Doka shows the workplace modified or repositioned etc). It must be possible to
safety precautions that are necessary in order to use get to and from these workplaces via safe access
the Doka products safely in the usage situations routes!
shown. ▪ If you are considering any deviation from the
In all cases, users are obliged to ensure compliance details and instructions given in this booklet, or
with national laws, Standards and rules throughout any application which goes beyond those
the entire project and to take appropriate additional described in the booklet, then revised static cal-
or alternative workplace safety precautions where culations must be produced for checking, as well
necessary. as supplementary assembly instructions.
6 999805802 - 03/2016
Original Operating Instructions Platform SCP Introduction
999805802 - 03/2016 7
Introduction Original Operating Instructions Platform SCP
▪
slinging means must be used - this is a mandatory
requirement.
Remove any loose parts or fix them in place so that
☞ Important note
Failure to observe this may lead to malfunc-
tion or damage.
they cannot be dislodged or fall free!
▪ All components must be stored safely, following all
the special Doka instructions given in the relevant CAUTION / WARNING / DANGER
sections of this booklet! Failure to observe this may lead to material
damage, and to injury to health which may
Maintenance range up to the severe or even life-threaten-
ing.
Tip
Points out useful practical tips.
Reference
Refers to other documents and materials.
8 999805802 - 03/2016
Original Operating Instructions Platform SCP Introduction
Eurocodes at Doka
In Europe, a uniform series of Standards known as The widely used "Permissible stress design" (compar-
Eurocodes (EC) was developed for the construction ing the actual stresses with the permissible stresses)
field by the end of 2007. These are intended to provide has been superseded by a new safety concept in the
a uniform basis, valid throughout Europe, for product EC.
specifications, tenders and mathematical verification. The EC contrast the actions (loads) with the resistance
The EC are the world's most highly developed Stand- (capacity). The previous safety factor in the permissible
ards in the construction field. stresses is now divided into several partial factors. The
In the Doka Group, the EC are to be used as standard safety level remains the same!
from the end of 2008. They will thus supersede the DIN
norms as the "Doka standard" for product design.
Ed Rd
98013-102
999805802 - 03/2016 9
Introduction Original Operating Instructions Platform SCP
Doka services
Support in every stage of the project
Doka offers a broad spectrum of services, all with a sin-
gle aim: to help you succeed on the site.
Every project is unique. Nevertheless, there is one
thing that all construction projects have in common –
and that is a basic structure with five stages. We at
Doka know our clients' varying requirements. With our
consulting, planning and other services, we help you
achieve effective implementation of your formwork
assignment using our formwork products – in every one
of these stages.
1 2 3
Project Development Stage Bidding Stage Operations Scheduling Stage
Taking well-founded decisions Optimising the preliminary work Controlled, regular forming oper-
thanks to professional advice and with Doka as an experienced part- ations, for greater efficiency
consulting ner resulting from realistically calculated
formwork concepts
Find precisely the right formwork Draw up potentially winning bids, by Plan cost-effectively right from the
solutions, with the aid of ▪ basing them on realistically calcu- outset, thanks to
▪ help with the bid invitation lated guideline prices ▪ detailed offers
▪ in-depth analysis of the initial sit- ▪ making the right formwork ▪ determination of the commission-
uation choices ing quantities
▪ objective evaluation of the plan- ▪ having an optimum time-calcula- ▪ co-ordination of lead-times and
ning, execution, and time-risks tion basis handover deadlines
10 999805802 - 03/2016
Original Operating Instructions Platform SCP Introduction
▪ Transparency
Because our services and costs
Optimum resource utilisation Seeing things through to a posi- are completely transparent, there
with assistance from the Doka tive conclusion is no need for improvisation dur-
Formwork Experts with professional support ing the project – and no unpleas-
ant surprises at the end of it.
999805802 - 03/2016 11
Introduction Original Operating Instructions Platform SCP
98058-405-01
Lifting unit attached on one side Lifting units attached on one side and on both sides are
often combined.
The lifting unit can be attached on one side with the
Bracket SCP.
▪ in the absence of walls
▪ if there are openings in the opposite wall
Lifting unit attached on one side Lifting unit attached on both sides
98058-406-01
12 999805802 - 03/2016
Original Operating Instructions Platform SCP Intended use
Intended use
The Platform SCP is a lifting appliance that is used Safety signs increase awareness
solely for rapid, safe raising of scaffolds, formwork or
other loads in the course of construction operations, around safe anchoring on the
without crane assistance.
structure
A Platform SCP needs a minimum of 4 lifting units.
☞ Important note:
The first time of putting into service, and the
first typical lifting sequence, must be super-
vised by certified Doka specialists.
999805802 - 03/2016 13
Intended use Original Operating Instructions Platform SCP
14 999805802 - 03/2016
Original Operating Instructions Platform SCP System description
System description
in a systematic sequence
▪ Quick and easy to reposition in only a few opera-
tional steps, as it is raised at the push of a button.
▪ Short forming-times, as the formwork suspended
from the girder grille is easy to close and open.
▪ Speeds up the workflow, as the crew enjoy an
enhanced sensation of safety at all heights.
999805802 - 03/2016 15
System description Original Operating Instructions Platform SCP
98058-402-01
98058-404-01
98058-403-01
16 999805802 - 03/2016
Original Operating Instructions Platform SCP System description
1st casting
section
98058-432-02
98058-422-15
98058-470-01
3rd casting
section
98058-416-28
999805802 - 03/2016 17
System description Original Operating Instructions Platform SCP
Functional principle
Starting position Platform is raised Lower base beam is pulled up
▪ The previous section has been cast. ▪ Platform travels upwards. ▪ The lifting operation is finished.
▪ All ties have been removed.
▪ Formwork has been struck.
18 999805802 - 03/2016
Original Operating Instructions Platform SCP Platform SCP – Lifting unit attached on both sides
D B E
A C A
98058-405-01
A Lifting unit
B Girder grille
C Suspended platform
D Facade platform
E Railing on girder grille
999805802 - 03/2016 19
Platform SCP – Lifting unit attached on both sides Original Operating Instructions Platform SCP
System overview
Lifting unit Upper base beam
The lifting units raise the entire Platform SCP from one ▪ Upper distance profile U300 .....mm
casting section to the next. - Is fabricated on a project-specific basis.
- The upper distance profile U300 …..mm is used
to adapt the upper base beam to the respective
L
shaft width.
▪ Upper latch beam S355
- Is used for transferring all vertical and horizontal
loads in the stationary situation, and for transfer-
N ring the horizontal loads in the lifting situation.
I
▪ Upper latch A S355
- Is used for introducing the vertical loads into the
structure in the stationary situation.
K
- The heavy-duty latch pivots unaided into the
O horizontal position.
▪ Latch roll
- Is used for introducing the horizontal loads into
H J
the structure in the stationary and lifting situa-
tions.
C
Lower base beam
B N
M ▪ Lower distance profile .....mm
D - Is fabricated on a project-specific basis.
- The lower distance profile is used to adapt the
G
A lower base beam to the respective shaft width.
F - The plunger rod of the hydraulic cylinder is
E pinned into the lower distance profile.
▪ Lower latch beam
- Is used for transferring the vertical loads in the
lifting situation.
- It also has a guiding function for the Vertical pro-
file FRQ 120.
▪ Lower latch
- Is used for introducing the vertical loads into the
structure in the lifting situation.
P
- The heavy-duty latch pivots unaided into the
horizontal position.
98058-408-01
20 999805802 - 03/2016
Original Operating Instructions Platform SCP Platform SCP – Lifting unit attached on both sides
B
Suspended platform
Hydraulic system
999805802 - 03/2016 21
Platform SCP – Lifting unit attached on both sides Original Operating Instructions Platform SCP
Girder grille
The lifting units of a platform are linked to one another
by the girder grille.
The girder grille has the following functions:
▪ Working platform (for placing the reinforcement)
▪ Storage platform (for installing all the infrastructure)
▪ Attaching all the formwork
▪ Attaching all the suspended platforms
During the lifting operation, the girder grille is lifted
along with all the components connected to it.
B A B C
B B
98058-407-01
A Girder grille
B Lifting unit
C Formwork
D Facade platform
22 999805802 - 03/2016
Original Operating Instructions Platform SCP Platform SCP – Lifting unit attached on both sides
H I
F F
E
G
D
G
98058-408-03 98058-408-08
F Enclosure
G Girder grille
H Railing profile IPB140 longitud.
I Railing profile IPB140 transverse
G
F A
98058-408-02
999805802 - 03/2016 23
Platform SCP – Lifting unit attached on both sides Original Operating Instructions Platform SCP
System dimensions
Adaptation to the shaft width
The upper distance profile U300 …..mm is used to
adapt the upper base beam to the respective shaft
c
a b a
width.
i
e h j
g
98058-408-05
g ... min. 2470 mm - 4500 mm
h ... length of distance profile = shaft width - 1630 mm
i ... 800 mm
d
j ... 60 mm
f The lower distance profile is used to adapt the lower
base beam to the respective shaft width.
i
g
h j
98058-409-04 g
98058-408-04
a ... 700 mm
b ... depends on width of shaft g ... min. 2470 mm - 4500 mm
c ... 2000 mm h ... length of distance profile = shaft width - 1566 mm
d ... 100 mm i ... 800 mm
e ... Height of casting section: 2700 mm - 4250 mm j ... 60 mm
(with custom cylinders: up to 4500 mm)
f ... approx. 1000 mm For other shaft widths, follow the directions in
g ... min. 2470 mm - 4500 mm the section headed 'Design variants'.
24 999805802 - 03/2016
Original Operating Instructions Platform SCP Platform SCP – Lifting unit attached on both sides
Note:
Note the connection points of the hydraulic cylinders!
Transverse-mem-
ber position
Longitudinal-
member position
a ... 140 mm
b ... 100 mm
c ... 145 mm
Note:
The distance profile of the lower base beam is fabri-
cated on a project-specific basis. Note the connection
points for the hydraulic cylinders!
999805802 - 03/2016 25
Structural design Original Operating Instructions Platform SCP
Structural design
Loading data
The statical design for the Platform SCP must allow for
two different loading states:
▪ Loads imposed when the platform is in the supported
state, i.e. while construction tasks are being carried
out.
▪ Loads occurring during the lifting operation, i.e. while
the Platform SCP is being moved into a new working
position.
V V
98058-412-01 98058-411-01
d
c
A
b
A
a
A
c
H
a
b
98058-412-02
98058-411-02
a ... 130 mm
b ... 75 mm a ... 86 mm
c ... 290 mm b ... 120 mm
d ... 140 mm c ... 130 mm
V ... 300 kN V ... 200 kN
H ... project-specific
A Support surface for the latches
26 999805802 - 03/2016
Original Operating Instructions Platform SCP Structural design
Service loads
+1
B B B B
0
B B
-1
98058-405-01
999805802 - 03/2016 27
Anchoring on the structure Original Operating Instructions Platform SCP
Wrong:
98058-415-04
98058-413-01
Right:
a
98058-415-05
98058-413-02
A
Wrong:
c
98058-415-06
A
98058-413-03
a ... 400 mm
b ... 160 mm
c ... 350 mm
A Latch roll
Shaft width tolerance
98058-413-05
☞ Important note:
Position the Latch rolls in such a way that the
horizontal loads can be safely transferred. Take
into account openings in the structure and
latch-boxes.
28 999805802 - 03/2016
Original Operating Instructions Platform SCP Anchoring on the structure
for one Box for latch for back-to-back Boxes for latch ☞▪ Inclination of base beam: max. 0.50%
- Example:
Width of shaft: 2000 mm
Max. height mismatch of two opposite
Boxes for latch: 10 mm
98058-415-02
98058-415-01
b
a
b
a
c
➤ Fit on a Form-ply protector 22mm.
➤ Twist two Tie rods 15.0 into the sockets of the Box 98058-413-06
for latch, until fully engaged.
c ... max. 4 mm
➤ Place the Box for latch over the position-holder and
fix it with Super plates 15.0.
Dimensioning the suspension point
98058-414-01
999805802 - 03/2016 29
Anchoring on the structure Original Operating Instructions Platform SCP
98058-414-02
B A
F D E
98058-414-03
30 999805802 - 03/2016
Original Operating Instructions Platform SCP Anchoring on the structure
999805802 - 03/2016 31
Operating the formwork Original Operating Instructions Platform SCP
98058-400-01 98058-401-01
For more information, see the 'Timber-beam For more information, see the 'Framed form-
formwork Top 50' User Information booklet. work Framax Xlife' User Information booklet.
32 999805802 - 03/2016
Original Operating Instructions Platform SCP Operating the formwork
agent.
➤ Press the holding formwork against the edge of the
structure and align it.
See the section headed 'Plumbing & aligning the
formwork'.
➤ Mount the Boxes for latch.
➤ Place the reinforcement.
98058-427-07
C Roller stop SK
A B
98058-427-06
A Roll-back formwork
B Holding formwork
999805802 - 03/2016 33
Operating the formwork Original Operating Instructions Platform SCP
A B
98058-427-01 98058-427-02
34 999805802 - 03/2016
Original Operating Instructions Platform SCP Operating the formwork
98058-427-03
A Girder grille
B Chain hoist
C Lifting-bracket
D Star grip nut 15.0
E Hexagon nut 15.0
999805802 - 03/2016 35
Operating the formwork Original Operating Instructions Platform SCP
Adjusting the formwork in shaft cores ➤ Adjust the formwork inclination with the spindle strut.
A A
98058-427-04
A Holding formwork
B Doka floor prop (type = project-specific)
C Spindle strut (type = project-specific)
36 999805802 - 03/2016
Original Operating Instructions Platform SCP Operating the formwork
Adjusting the formwork in shaft cores ➤ Swing the tie rod plus Star grip nut 15.0 round and
engage it in the holding fixture on the Fixing angle.
with base beams
➤ Press the holding formwork against the edge of the D C B
structure by hand.
E
98058-427-11
B Steel waling fixing WS10
C Tie rod 15.0mm (max. length 1.0 m)
D Star grip nut 15.0
E Fixing angle
A A
98058-427-10 F G
98058-427-08
98058-427-09
999805802 - 03/2016 37
Start-up phases Original Operating Instructions Platform SCP
Start-up phases
Starting up
The modular design of the Platform SCP means that Overview of working platforms
many different combinations are possible.
Depending on the project, the actual design may thus
differ very greatly from the basic type described here. The below assembly procedure describes the following
three types of working platforms:
➤ In these cases, you should discuss the assembly
procedure with your Doka technician. ▪ Working platform with one base beam
➤ Follow the shop drawing / assembly plan. ▪ Working platform with no base beams (suspended
☞
platform)
Important note: ▪ Working platform with two base beams
▪ A hard, flat, firm surface is needed!
▪ Prepare a sufficiently large assembly area. Working platform with one base beam
WARNING
Falling hazard!
➤ Use personal fall arrest systems to protect
against fall hazards when working on
unsafeguarded drop-off edges (e.g. Doka
personal fall-arrest set).
B
98058-433-01
38 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
Working platform with no base beams Working platform with two base beams
(suspended platform)
▪ For the transfer of horizontal loads
▪ The working platform is suspended exclusively from ▪ 4 Vertical profiles 150 support the girder grille
the girder grille.
E
C C
C C
A
A
B
98058-433-02
98058-433-03
Note:
Working platforms with two base beams can be assem-
bled with one or two hydraulic cylinders, as necessary.
999805802 - 03/2016 39
Start-up phases Original Operating Instructions Platform SCP
a
E
b
B C
98058-435-01
a ... 800 mm
b ... min. 700 mm
A Box for latch 15.0
B Wall-plinth
C Temporary support for formwork
D Pouring platform
E Temporary platform
40 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
B C
Positioning the lower base beams
➤ Attach the lifting chain to the pre-assembled base
beam.
➤ Position the pre-assembled base beams in the latch-
boxes.
98058-430-04 98058-430-05
98058-430-07
➤ Remove the Quick-locking strap 55cm from the ➤ Detach the lifting chain from the base beam.
latches.
➤ Put up service towers on the outsides.
F
E
D
98058-432-03
999805802 - 03/2016 41
Start-up phases Original Operating Instructions Platform SCP
Working platform with one base beam Erecting the vertical scaffold
➤ Lift the pre-assembled vertical scaffold into the upper
base beam.
Mounting the working platforms
➤ Position platform supports in the area of the multi-
purpose walings.
➤ Lift in the pre-assembled working platform as far as
the lower latch-boxes.
98058-432-01
98058-434-01
➤ Remove the Quick-locking strap 55cm from the top
latches.
➤ Pin each Vertical profile 150 into the base beam with
➤ Set down the working platforms in the latch-boxes
Fastening bolts FRQ150 and secure the bolts with
and on the platform supports.
the cotter pins.
➤ Adjust the latch rolls.
a C E
98058-430-02 98058-430-03
a ... 10 mm
C Upper latch
98058-428-01
D Quick-locking strap 55cm
E Latch roll F Upper base beam
G Vertical profile 150
42 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
➤ Remove the Distribution bolts D50 and lower the Working platform with no base beams
Vertical profile FRQ120 down to the ground.
(suspended platform)
☞
H
Position platforms with a Platform cross
100 mm lower than the platforms with a base
beam.
Erecting the working platforms
➤ Position platform supports in the area of the multi-
purpose walings.
➤ Set down the working platform on the supports.
C D
a
I
98058-429-01
A B
J
E
98058-426-05
98058-426-01
J Squared timber (height = project-specific)
E Squared timber (height = project-specific)
999805802 - 03/2016 43
Start-up phases Original Operating Instructions Platform SCP
Working platform with two base Erecting the vertical scaffold gang
➤ Lift the pre-assembled vertical scaffold gang into the
beams upper base beams.
98058-430-08
a C E
98058-430-02 98058-430-03 F
a ... 10 mm
C Upper latch
D Quick-locking strap 55cm
E Latch roll
98058-428-01
44 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
I
98058-429-01
98058-426-03
999805802 - 03/2016 45
Start-up phases Original Operating Instructions Platform SCP
A
A
A
98058-422-10
A Temporary platform
B Pre-assembled girder grille
➤ Release the clamping connections in the area of the ➤ Carefully lower the grille-beam unit on to the Vertical
Vertical profiles 150. profiles 150.
➤ Push Clamping plates WU30 on to the Vertical pro-
files 150.
Ensure that the Clamping plate WU30 is in the
correct position.
46 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
98058-425-01
F E G
98058-491-02
D
98058-422-12
999805802 - 03/2016 47
Start-up phases Original Operating Instructions Platform SCP
A
A
A
98058-422-11
A Temporary platform
B Pre-assembled grille-beam pair
C Lifting beam 110kN 6.00m
48 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
➤ Release the clamping connections in the area of the ➤ Repeat the procedure to position the other grille-
Vertical profiles 150. beam pairs on the vertical scaffolds.
➤ Push Clamping plates WU30 on to the Vertical pro- ➤ Set the grille-beam pairs for the transverse members
files 150. on the Joint plates WU30.
➤ Bolt the grille-beam pair to the Vertical profiles 150
Ensure that the Clamping plate WU30 is in the
with threaded rods.
correct position.
➤ Carefully lower the grille-beam pair on to the Vertical
profiles 150.
WARNING
➤ Do not detach the crane until the grille-beam
pair is firmly bolted to the Vertical profiles
150. D
➤ Bolt the grille-beam pair to the Vertical profiles 150
with threaded rods. G
98058-422-16
999805802 - 03/2016 49
Start-up phases Original Operating Instructions Platform SCP
A B B A A B B A
98058-422-01
A Roll-back formwork
B Holding formwork
Close-up A: Roller unit SK (roll-back formwork) Close-up B: Element suspender (holding formwork)
E
D
F
C C
98058-422-02
98058-422-03
98058-422-05
98058-422-04
C Element holder SK ➤ Guide the tie rod through the Element holder SK on
D Roller unit SK the formwork.
E Element suspender SK ➤ Screw the tie rod into the roller unit / tie rod holder,
F Tie rod holder 15.0 and secure it with a locking plate.
50 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
☞
Fixing the tie rod in the roller unit
Important note:
➤ The excess length of the tie rod below the 1) Raise the locking plate.
star grip nut must be at least as large as the 2) Screw the tie rod into the roller unit until it protrudes
clearance between the formwork and the by approx. 20 mm.
working platform.
3) Push the locking plate onto the tie rod.
➤ Screw the star grip nut onto the tie rod and tighten it This fixes the tie rod so that it cannot be turned.
until the element is suspended.
B
A
1
3
c
D 2
E 98071-266-11 98071-266-10
a
c ... approx. 20 mm
Max. load:
1300 kg per Roller unit SK
1000 kg per Roller unit WS10
2) Screw the tie rod into the Tie rod holder 15.0 until it
98058-416-14
1
➤ Lock the Star grip nut 15.0 with a hexagon nut 15.0.
3
c
98071-304-02 98071-304-03
c ... approx. 20 mm
Max. load:
1300 kg per Tie rod holder 15.0
999805802 - 03/2016 51
Start-up phases Original Operating Instructions Platform SCP
Suspending platforms from the girder ➤ Fix the Suspension profile FRQ 50 to the Clamping
unit FRQ 50 B and secure it.
grille
E D
C F
B 98058-424-02
C F
98058-424-01
98058-416-12
52 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
Working platform with no base beams ➤ Secure the Suspension profile FRQ 120/8 to the
(suspended platform) girder grille with threaded rods.
A
A
98058-424-04
D
98058-424-03
999805802 - 03/2016 53
Start-up phases Original Operating Instructions Platform SCP
☞ Important note:
Note the installation position of the Upper cylin-
➤ Attach the crane suspension tackle to the Upper cyl-
inder connector SCP.
der connector SCP and the position of the
clamping angles M7!
C B A
98058-421-01
98058-416-08
54 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
WARNING
Risk of fracture if unsuitable bolts are used.
☞ Important note:
➤ The Cylinder head guide SCP has to be
➤ Use only the Screw-set M24x65 10.9, in mounted on the topside or the underside of
every case. the base beam, depending on the height of
the casting section.
➤ Use new screw-sets every time the equip-
ment is re-assembled. ➤ Mount the Cylinder head guide SCP on the upper
➤ The bolted joints must comply with base beam.
EN 1090-2.
Cylinder head guide SCP Cylinder head guide SCP
➤ Secure Upper cylinder connector SCP to the girder mounted on topside of base mounted on underside of base
grill with clamping angles M7. beam beam
98058-421-03
F
F E
98058-421-04
C
Distance plates can be used for precision posi-
tioning of the cylinder head guide. The cylinder
head guide must be located at the bottom end
C Clamping angle M7 of the cylinder head.
D Grille-beam pair U300
F G
98058-421-06
98058-421-05
999805802 - 03/2016 55
Start-up phases Original Operating Instructions Platform SCP
98058-416-10
➤ Bolt Doka beams H20 on to the girder-grille profile ➤ Detach the crane suspension tackle from the work-
U300 with Beam clamps U300 double. ing platform.
➤ Fix the Beam clamps U300 double in the Doka
beams H20 with universal countersunk screws 5x50.
98058-417-01
56 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
H G
E F
92865-201-03
98058-416-11
F Enclosure element
G Railing profile IPB140
999805802 - 03/2016 57
Start-up phases Original Operating Instructions Platform SCP
C B A
B A
98058-420-01
F E
98058-416-06
58 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
Mounting the enclosure elements to ➤ Clamp further enclosure elements to the facade pro-
files in the same way.
the facade profiles
➤ Attach the crane suspension tackle to the lifting rings
on the enclosure element.
B
H I
I
92865-201-03
Note:
J
The top enclosure element is not mounted until later.
98058-408-06
999805802 - 03/2016 59
Start-up phases Original Operating Instructions Platform SCP
98058-416-03
60 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
999805802 - 03/2016 61
Start-up phases Original Operating Instructions Platform SCP
98058-418-01
98058-416-02
62 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
98058-416-01
999805802 - 03/2016 63
Start-up phases Original Operating Instructions Platform SCP
B
G H
C
D 98058-405-11
I
A
98058-405-06
B
I Platform decking
98058-405-08
64 999805802 - 03/2016
Original Operating Instructions Platform SCP Start-up phases
98058-445-05
a ... 50 mm
J Platform roller unit
98058-406-13
999805802 - 03/2016 65
Start-up phases Original Operating Instructions Platform SCP
98058-405-01
66 999805802 - 03/2016
Original Operating Instructions Platform SCP Typical sequence of lifting-phases
Note:
When combining lifting units attached on both sides
with lifting units attached on one side, follow the direc-
tions in the section headed 'Typical sequence of lifting-
phases – Lifting unit attached on one side'.
☞ Important note:
Before lifting: Remove any loose items from
the formwork and platforms, or secure them
firmly.
CAUTION
➤ Max. wind speed for climbing operations:
72 km/h.
➤ Heed all storm warnings and take action as
necessary.
➤ Only begin climbing-operations that you can
be sure of finishing before wind speeds rise
too high.
➤ While the platform is being raised, the only
persons allowed on the platform are the
trained personnel in charge of the lifting
operation – i.e. the hydraulic-system opera-
tor and the watchmen.
999805802 - 03/2016 67
Typical sequence of lifting-phases Original Operating Instructions Platform SCP
98058-409-01 98058-409-02
68 999805802 - 03/2016
Original Operating Instructions Platform SCP Typical sequence of lifting-phases
☞ Important note:
➤ Do not move the lower base beam down into
the recess in the concrete.
The latches of the lower base beam remain
unloaded.
➤ Switch off the hydraulic unit.
The lifting operation is finished.
98058-409-03
999805802 - 03/2016 69
Pre-assembly Original Operating Instructions Platform SCP
Pre-assembly
The modular design of the Platform SCP means that
many different combinations are possible.
Depending on the project, the actual design may thus
differ very greatly from the basic type described here.
➤ In these cases, you should discuss the assembly
procedure with your Doka technician.
➤ Follow the shop drawing / assembly plan.
☞ Important note:
▪ A hard, flat, firm surface is needed!
▪ Prepare a sufficiently large assembly area.
▪ All platforms must be statically verified!
70 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
WARNING
☞ When the base beam is being lifted into the
shaft, the latches must each be held back with
a Quick-locking strap 55cm.
Risk of fracture if unsuitable screws are used. Inside the shaft, these straps are then removed.
➤ Use only the Screw-set M24x85 10.9, in
every case.
➤ Use NEW 'Screw-sets' every time the equip-
ment is re-assembled.
C
➤ The threaded joints must comply with
EN 1090-2.
D
➤ Bolt the Lower latch beams onto the lower distance
profile.
98058-471-01
A
C Lower latch
B
D Quick-locking strap 55cm
98058-436-03
Upper base beam
A Lower distance profile .....mm (project-specific)
➤ Set the upper distance profile down on level ground,
B Lower latch beam on hardwood blocking.
Nuts & bolts etc. required for each base beam WARNING
▪ 2 screw-sets M24x85 10.9 Risk of fracture if unsuitable bolts are used.
➤ Use only the Screw-set SCP M24x75 10.9,
➤ Pin a Lower latch into each Lower latch beam and
in every case.
secure with spring cotters.
➤ Use new screw-sets every time the equip-
ment is re-assembled.
C
➤ The bolted joints must comply with
EN 1090-2.
➤ Bolt Upper latch beams S355 onto the upper dis-
B
tance profile.
B A
98058-436-04
98058-436-01
999805802 - 03/2016 71
Pre-assembly Original Operating Instructions Platform SCP
a
➤ Use only the Screw-set SCP M24x75 10.9,
in every case.
➤ Use new screw-sets every time the equip-
ment is re-assembled.
➤ The bolted joints must comply with
EN 1090-2.
➤ At the joints between the Upper latch beams S355
and the upper distance profile, bolt on a Tension b
98058-437-01
plate U300 (at top) and a Tension plate S355 (at bot-
tom). Insert the bolts as shown, from the outside. a ... 49 mm
b ... 47 mm
D
98058-472-01
F 98058-437-05
F Latch roll
G B
98058-437-06
72 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
C B
E
D B A 98058-438-02
98058-438-01
F G
C
98058-438-05
98058-438-03
98058-438-06
999805802 - 03/2016 73
Pre-assembly Original Operating Instructions Platform SCP
B A A B
C
98058-438-07
B A
A Fixing angle
B Double bolt D12
C Vertical profile 150/.../S355
98058-440-01
Required nuts & bolts etc.
A Plumbing strut 260 IB ▪ 2 hexagon screws M16x40, strength grade 8.8
B Doka express anchor 16x125mm (EN ISO 4017 / DIN 933)
▪ 2 washers 16 (EN ISO 7089)
WARNING ▪ 2 hexagon nuts M16, strength grade 8
(EN ISO 4032 / DIN 934)
Risk of fracture if unsuitable bolts are used.
➤ Use only the Screw-set M24x65 10.9, in
every case.
➤ Use new screw-sets every time the equip-
ment is re-assembled.
➤ The bolted joints must comply with
EN 1090-2.
➤ Mount braces.
E
D
C
C
E
98058-440-02
74 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
WARNING C
☞ Important note:
A gap at the join between beams can result in
the grille beams not running in a straight line C Grille connector U300
98058-491-02
98058-491-01
999805802 - 03/2016 75
Pre-assembly Original Operating Instructions Platform SCP
B D A
98058-441-03
E
98058-441-01 C
a ... 370 mm
A Grille beam U300 F Joint plate WU30
B Squared timber (length 500 mm) G Clamping plate WU30
C Super plate 15.0
D Tie rod 15.0 (length 1000 mm) Threaded-fastener material required
E Doka beam H20 (length 250 mm) ▪ 4 threaded rods M20
(length 750 mm, strength grade 8.8)
▪ 8 washers 20 (EN ISO 7089)
▪ 8 hexagon nuts M20, strength grade 8
(EN ISO 4032 / DIN 934)
98058-492-01
76 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
☞
➤ Set down Grille beams U300 on the hardwood block-
Important note:
ing.
Guide value for one grille-beam unit: ➤ Mount facade profile connector or railing profile at
▪ Area approx. 100 m2 the edge area of a grille-beam unit.
▪ Consider what craneage is available! ➤ Position joint plates on the grille beams.
Note the weights stated in the final drawing or
assembly drawing!
C A
E B
98058-444-01
999805802 - 03/2016 77
Pre-assembly Original Operating Instructions Platform SCP
98058-444-05
78 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
98058-444-07
C F
98058-444-10
G
98058-444-11
E Clamping-connection WU30
F Railing profile IPB140 transverse
G Railing profile IPB140 longitudinal
999805802 - 03/2016 79
Pre-assembly Original Operating Instructions Platform SCP
A
D C
B B
A a
A 98058-446-02
Note:
Use Tensioning instrument 300kN to pretension the
bolted connections.
▪ 1 carrying case
☞▪ Important note:
Pretension only the clamping connection
➤ Re-tighten the hexagon nuts and release the load
WU30.
from the hollow-piston cylinder.
▪ Clamping-connections located in the area of
the vertical profiles must be loosened again ➤ Pre-load all the other threaded rods of the clamping-
when the girder grille is mounted. connection WU30 in the same way.
Do not pre-load these connections until the
girder grille is mounted to the vertical pro-
files.
80 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
D J
D F
H
E I
98058-446-01
A
H
98058-444-09
999805802 - 03/2016 81
Pre-assembly Original Operating Instructions Platform SCP
98058-424-05 C
D E
98058-424-06
82 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
WARNING
➤ Limit the travel of the roller units on both F
sides.
➤ Dismount the supporting rollers from the Roller 98058-447-02
98058-423-02
98058-423-03
999805802 - 03/2016 83
Pre-assembly Original Operating Instructions Platform SCP
▪ Roller unit SK A
- for suspending the roll-back formwork
▪ Element suspender SK
- for suspending the holding formwork
C
B
98058-422-13
A B 98058-447-01
F
A Grille beam U300 B
B Multi-purpose waling WS10 Top50
E B
98058-447-06
84 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
D
98058-422-06
A Roller unit SK E
F
➤ Pin a Roller stop SK onto the Multi-purpose waling, 98058-447-04
and secure it with two Spring cotters 5mm.
D Clamping plate SK
E Element suspender SK
F Tie-rod holder 15.0
C B
D
A E
a 98058-422-08 b
F
a ... 80 mm 98058-447-05
b ... 36 mm
D Clamping plate SK
A Roller unit SK
E Element suspender SK
B Roller stop SK
F Tie-rod holder 15.0
C Roller safety pin WS10
B A
C D
98058-442-01
C Lifting bow
D Clamping angle
98058-439-01
WARNING
Risk of fracture if unsuitable bolts are used.
➤ Use only the Screw-set M24x65 10.9, in
every case.
➤ Use new screw-sets every time the equip-
ment is re-assembled.
➤ The bolted joints must comply with
EN 1090-2.
➤ Install the lifting bow and clamping angles as shown
in the final drawing or assembly drawing.
98058-439-02
C Lifting bow
D Clamping angle
86 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
B x
D
98058-443-05
98058-443-07
a
A Upper base beam
98058-443-04
B Custom profile U200
C Hardwood blocking (height min. 150 mm)
Note:
Threaded-fastener material required for each custom To fasten the Doka beams H20 onto the base beams,
profile a longer hexagon bolt is needed for the Beam screws
▪ 4 hexagon bolts M20x60, strength grade 8.8 S8/70!
(EN ISO 4017 / DIN 933)
➤ Bolt Doka beams to the base beams with 'Beam
▪ 4 washers 20 (EN ISO 7089) screws'.
▪ 4 hexagon nuts M20, strength grade 8
(EN ISO 4032 / DIN 934) E F
98058-443-03
999805802 - 03/2016 87
Pre-assembly Original Operating Instructions Platform SCP
98058-443-01
c
d
98058-443-08
H I J
c ... 710 mm
d ... 610 mm
➤ Screw the Manhole B 70/60cm onto the platform
decking with universal countersunk screws 5x40.
a
K
98058-443-02
b
a ... 490 mm
b ... width of shaft - 2 x 200 mm
H Opening in decking, for latch (490x180 mm) 98058-443-09
88 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
Working platform with one base beam ➤ Fasten platform decking to the Doka beams with suf-
ficient numbers of universal countersunk screws
6x80.
➤ Set down the base beam and Multi-purpose waling
WS10 Top50 on hardwood blocking. F
➤ Bolt Doka beams to the base beam and Multi-pur-
pose waling WS10 Top50 with 'Beam screws'.
98058-445-01
y
E
x
D F Platform decking (Raw sheet 3-S 38mm)
A C
a
B 98058-445-04
H I
a
J
a ... centre-to-centre distance
x = y ... diagonals
A Upper base beam U300
B Multi-purpose waling WS10 Top50
C Doka beam H20
D Beam screw S8/70
E Beam screw S8/70
(longer hexagon bolt necessary) G
c
98058-445-02
a ... 490 mm
98058-445-03
b ... width of shaft - 2 x 200 mm
c ... 250 mm
d ... 350 mm
G Opening in decking, for Suspension profile FRQ 50 (80x80 mm)
H Opening in decking, for latch (490x180 mm)
I Opening in decking, for vertical scaffold (240x300 mm)
J Opening in decking, for hydraulic cylinder (320x320 mm)
98058-445-05
e ... 50 mm
K Platform roller unit
999805802 - 03/2016 89
Pre-assembly Original Operating Instructions Platform SCP
98058-445-07 B A
C
f ... 710 mm
98058-448-04
g ... 610 mm
➤ Screw the Manhole B 70/60cm onto the platform A Multi-purpose waling WS10 Top50
decking with universal countersunk screws 5x40. B Platform cross double
C Connecting pin 10cm
D Spring cotter 5mm
F E
98058-445-06
90 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
➤ Fasten platform decking to the Doka beams with suf- ➤ Mount Doka beams H20 to the multi-purpose wal-
ficient numbers of universal countersunk screws ings.
6x80. Width-across 13 mm
Hole diameter: 10 mm
F E
G
98058-448-01
98058-449-03
G Platform decking (Raw sheet 3-S 38mm)
E Doka beam H20
F Beam screw S8/70
Cut-out needed in platform decking
➤ Fasten platform decking to the Doka beams with suf-
ficient numbers of universal countersunk screws
6x80.
98058-449-01
H
Cut-out needed in platform decking
a
b b
98058-448-02
H
a
a ... 250 mm
98058-449-02
b ... 350 mm
H Opening in decking, for Suspension profile FRQ 120/8 (150x150
mm)
D A
C B
98058-449-04
a ... 50 mm
b ... 214 mm
A Multi-purpose waling WS10 Top50
B Platform cross WS10
C Connecting pin 10cm
D Spring cotter 5mm
999805802 - 03/2016 91
Pre-assembly Original Operating Instructions Platform SCP
c
d
x
y
98058-473-02
A
c ... 710 mm
a d ... 610 mm
98058-473-05 ➤ Screw the Manhole B 70/60cm onto the platform
a ... centre-to-centre distance decking with universal countersunk screws 5x40.
x = y ... diagonals
A Multi-purpose waling WS10 Top50
B Doka beam H20
B D
C C
98058-473-01
98058-473-03
F Manhole B 70/60cm
B Doka beam H20
C Beam screw S8/70
D Platform decking (Raw sheet 3-S 38mm)
b
a
98058-473-06
a ... 250 mm
b ... 350 mm
E Opening in decking, for Suspension profile FRQ 50 (80x80 mm)
92 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
a
98058-450-01 A
98058-450-03
a ... 710 mm
b ... 610 mm
➤ Screw the Manhole B 70/60cm onto the platform
decking with universal countersunk screws 5x40.
98058-450-02
C Manhole B 70/60cm
999805802 - 03/2016 93
Pre-assembly Original Operating Instructions Platform SCP
B
c
C A A
98058-452-02
☞
beams, using hexagon bolts.
Important note:
Width-across 30 mm
If 'a' >2.0 m or 'b' >4.0 m, then an extra stiffen- Hole diameter: 22 mm
ing reinforcement must be added in the middle
of each of these spans. C
98058-452-08 A
98058-452-04
94 999805802 - 03/2016
Original Operating Instructions Platform SCP Pre-assembly
➤ Bolt planks into the Enclosure clamps SCP to Installing the Lifting ring
increase rigidity. ➤ Screw the Enclosure SCP lifting ring into the Enclo-
Width-across 13 mm sure clamp SCP of the enclosure element as far as it
Hole diameter: 10 mm will go.
Hole diameter: 22 mm
98058-452-07
C
E A
a
b
B
F
98058-452-01
98058-452-06
A Doka beam H20
a ... 10 mm E (Perforated) trapezoidal sheeting
b ... 25 mm F Drilling screw 6.5x50mm / Flat head screw 6x60mm
c ... 75 mm
B Plank, 5x20 cm
999805802 - 03/2016 95
Pre-assembly Original Operating Instructions Platform SCP
Assembling the Facade profile ➤ Bolt an Enclosure clamp SCP onto the Facade pro-
file.
➤ Set down the Facade profile HE-A180 on hardwood
blocking.
A
WARNING
Risk of fracture if unsuitable bolts are used.
➤ Use only the Screw-set M24x65 10.9, in
every case.
➤ Use new screw-sets every time the equip-
ment is re-assembled.
E
➤ The bolted joints must comply with
EN 1090-2. F
➤ Bolt a WS10 connector F onto the bottom of the
Facade profile HE-A180.
98058-451-02
B A
A Facade profile HE-A180
E Enclosure clamp SCP
F Wooden batten
98058-451-01
E C
98058-451-03
B WS10 connector F
C Multi-purpose waling WS10 Top50
D Connecting pin 10cm
E Spring cotter 5mm
96 999805802 - 03/2016
Original Operating Instructions Platform SCP Dismantling
Dismantling
☞▪ Important note:
A hard, flat, firm surface is needed!
➤ Lift the working platform off the girder grille and set it
down.
▪ Provide a sufficiently large dismantling
space.
☞▪ Important note:
Before lifting: Remove any loose items
from the formwork and platforms, or secure
them firmly.
▪ "Passenger transportation" is forbidden!
▪ Exposed fall-hazard locations must be
closed off by attaching side railings.
▪ During all assembly and dismantling work on
the Platform SCP that is carried out on the
E
structure itself, the operators must use fall-
arrest equipment (e.g. the Doka personal
fall-arrest set).
98058-417-01
E Working platform
F Temporary platform
999805802 - 03/2016 97
Dismantling Original Operating Instructions Platform SCP
Dismounting the hydraulic cylinders ➤ Attach the lifting chain to the Upper cylinder connec-
tor SCP.
☞ Important note:
If the plunger rod is contaminated
(e.g. with concrete laitance):
▪ Carefully clean the plunger rod before
retracting the cylinders.
▪ Do not hit any objects against the plunger
rod.
➤ Start up the hydraulic unit.
➤ Remove the cylinder bolt D80x215.
E
C A
98058-463-01
98058-418-01
98 999805802 - 03/2016
Original Operating Instructions Platform SCP Dismantling
➤ Lift the Hydraulic cylinder SCP off the platform, set it Dismounting the enclosure elements
down on hardwood blocking and secure it so that it
cannot roll away.
➤ Screw the Enclosure SCP lifting ring into the Enclo-
sure clamp SCP of the enclosure element as far as it
will go.
➤ Attach the lifting chain to the lifting rings of the enclo-
sure element.
Follow the directions in the 'Enclosure SCP lift-
ing ring' Operating Instructions!
98058-408-07
B
C
98058-416-22
98058-416-23
C Enclosure element
999805802 - 03/2016 99
Dismantling Original Operating Instructions Platform SCP
Dismounting the facade platform ➤ Lift the facade platform away from the girder
grille and set it down.
➤ Position the formwork so that its lifting brackets are
accessible from above.
CAUTION
➤ Off-the-wall formwork elements must be
fixed on the scaffold, e.g. with a chain or a
quick-locking strap, to secure them against
accidental motion (dislocation or swinging).
➤ Attach the lifting chain to the facade profiles of the
facade platform.
➤ Dismount the facade platform from the Facade pro-
file connectors.
E
C B A
98058-416-24
98058-416-25
☞ Important note:
➤ Secure the vertical scaffold to the structure
so that it cannot tip over.
➤ Take into account the loads imposed by the
formwork.
➤ Dismount the suspension profiles between the girder
grille and the working platforms.
B B
98058-467-02
Working platform with no base beams ▪ recess for Doka beams H20
(suspended platform) ▪ recess for latches
CAUTION
➤ The supports for the platforms must be
checked by the structural designer!
☞ Important note:
➤ Take into account the loads imposed by the
formwork.
The formwork is set down on these platforms ➤ Dismount the suspension profiles between the girder
later in the disassembly procedure. grille and the supported platforms.
Ways of supporting the platforms:
▪ project-specific bracket
98058-416-26
Setting the formwork down on the ➤ Loosen the star grip nut to lower the formwork onto
the working platform.
working platform
➤ Prepare squared timbers along the entire length of
the formwork.
➤ Secure the formwork to the working platform with
panel struts.
➤ Fix each panel strut to the working platform with a tie
E
rod and super plates.
F
B C
98071-270-03
98058-416-30
E Star grip nut 15.0 G
B Panel strut F Hexagon nut 15.0
C Tie rod 15.0mm
D Super plate 15.0
➤ Dismount the tie rods from which the formwork was
suspended.
G G
98058-416-27
☞ Important note:
If any part of the girder grille does not have
enough support points during disassembly, suf-
ficiently strong supports must be provided at
site.
The loads imposed on individual supports are
shown in the project plans.
WARNING
➤ Do not cut through pretensioned connec-
tions (cutting torch, angle grinder,...).
➤ When undoing a bolted join, keep clear of
the axis of the threaded rod.
➤ Attach crane suspension tackle to the girder grille.
➤ Release the clamping connections in the area of the
Vertical profiles 150.
A
98058-422-12
98058-467-01
Lifting the formwork off the working Dismounting the lifting units and
platform suspended platforms
➤ Dismount the temporary platforms.
Working platform with two base beams
➤ Attach the lifting chain to the lifting brackets on the
formwork gang. ➤ Fix the lower base beam to the Vertical profile
➤ Tension the lifting chain. FRQ 120 6.00m and secure it.
This protects the formwork against tipping over. ➤ Dismount the ladder.
➤ Remove the panel-strut fixings and lift the formwork ➤ Attach the lifting chain to the vertical scaffold.
element off the working platform.
➤ Lift the vertical scaffold and the platforms connected
to it out of the shaft.
98058-467-03
98058-468-01
Working platform with one base beam Working platform with no base beams
(suspended platform)
➤ Dismount the working platform with one base beam
in the same way as the working platform with two ➤ Attach the lifting chain to the suspended platform.
base beams.
98058-468-04
98058-468-05
Design variants
Base beams for various shaft sizes
Standard shafts
List of the various different types of base beam, shown
schematically.
Design variant
▪ as shown in document. a
▪ with 4-way U300 join above verti- G
cal profile.
98058-466-01
98058-466-02
b A D B E b C
A
a ... min. 2470 mm
b ... 700 mm
Design variant
▪ with only one tier of U300 grille- a
beams above the vertical profile.
G
98058-466-03
98058-466-04
b A D B E b C
A
Narrow shafts
List of the various different types of base beam, shown
schematically.
Design variant
▪ with 4-way U300 join above verti- a
cal profile. G
▪ Latch beam is integrated in Dis-
tance profile.
98058-466-05
98058-466-02
b F B A b C
A
a ... min. 2090 mm
b ... 510-700 mm
Design variant
▪ with only one tier of U300 grille- a
beams above the vertical profile.
G
▪ Latch beam is integrated in Dis-
tance profile.
98058-466-06
98058-466-04
b F B A b C
A
C
B
F
98058-466-07
Extra-wide shafts
List of the various different types of base beam, shown
schematically.
Design variant
▪ for wide base-beam spans. a
C E A
98058-466-08
b b
▪ Support SCP
- Is anchored to the structure, for transferring
loads.
▪ Support SCP lower distance profile .....mm
- Is fabricated on a project-specific basis.
- The lower distance profile is used to adapt the
E lower base beam to the respective shaft width.
- Is used for transferring the vertical loads in the
lifting situation.
- The plunger rod of the hydraulic cylinder is
C pinned into the lower distance profile.
B - It also has a guiding function for the Vertical pro-
file FRQ 120.
A ▪ Lower latch
- Is used for introducing the vertical loads into the
D structure in the lifting situation.
- The heavy-duty latch pivots unaided into the
A horizontal position.
Suspended platform
A Support SCP
B Upper distance profile support SCP U300 .....mm
(project-specific)
C Latch roll
D Lower distance profile support SCP .....mm (project-specific)
E Vertical profile FRQ 120 6.00m
F FRQ extension level -1 (project-specific)
G Multi-purpose waling WS10 Top50
C
D
e
B
A G
E
F
d
98058-462-01
i
h
F
j
k
C
D
B
A E
98058-462-02
Note:
See the section headed 'Anchoring on the structure –
Lifting unit attached on one side'!
Assembling the working platform ➤ Additionally secure each Support SCP to the dis-
tance profile with 2 chains.
98058-465-03
F Support SCP
G Lower distance profile support SCP .....mm (project-specific)
98058-465-01
F Support SCP
G Lower distance profile support SCP .....mm (project-specific)
98058-479-01
G
D C E
B A
98058-406-01
System overview
Lifting unit ▪ One Bracket SCP (bottom)
- Is used for transferring the vertical loads in the
lifting situation.
The lifting units raise the entire Platform SCP from one
casting section to the next. ▪ Bracing
- Is fabricated on a project-specific basis.
- For bracing the Vertical profiles 150 and the
brackets.
▪ Vertical strut
D
J - For transferring horizontal loads. Check on pro-
C
H ject-specific basis whether a vertical strut is nec-
essary.
F
▪ Bracket SCP suspension shoe
E
- Is anchored to the structure and is used for load
G
transfer.
M
▪ Bracket SCP cylinder connector B
- Is secured to the Bracket SCP.
L
- The piston rod of the hydraulic cylinder is pinned
B into the Bracket SCP cylinder connector B.
A I Vertical scaffold
K
▪ Vertical profile 150/.../S355
- Is fixed in the upper brackets and connects the
upper brackets to the girder grille.
▪ Bracing
- Is fabricated on a project-specific basis.
- For transferring horizontal loads.
Suspended platforms
For detaching and fixing the suspension shoes during
the lifting operation.
Consisting of:
▪ Suspension profile FRQ 50
- Is fabricated on a project-specific basis.
- Is used for linking the different platform levels.
98058-406-02
▪ Multi-purpose waling WS10 Top50
A Bracket SCP - Is used for constructing the platform.
B Bracket SCP suspension shoe
C Vertical profile 150/.../S355 Hydraulic system
D Bracing shoe 2-times
E Bracing shoe 3-times ▪ Upper cylinder connector SCP
F Bracing FL .....mm (project-specific) - Links the hydraulic cylinder to the girder grille.
G Bracing FRQ .....mm (project-specific) ▪ Hydraulic cylinder SCP
H Suspension profile FRQ 50 (project-specific) - The double-acting hydraulic cylinder is used to
I Hydraulic cylinder SCP raise the Platform SCP to the next casting sec-
J Upper cylinder connector SCP tion. It is pinned into the lower bracket and the
K Bracket SCP cylinder connector B Upper cylinder connector SCP.
L Cylinder tube guide SCP ▪ Cylinder tube guide SCP
M Vertical strut (project-specific) - This is a bend-protector for the Hydraulic cylin-
der SCP and is attached to the bracing of the ver-
A lifting unit consists of three brackets. tical scaffold.
▪ Two Brackets SCP (top)
- For transferring all vertical and horizontal loads
in the stationary situation, and for transferring the
horizontal loads in the lifting situation.
- For securing the vertical profiles and for connect-
ing the main working platform.
Functional principle
Starting position Platform is raised Lower bracket is brought up
▪ The previous section has been cast. ▪ Platform travels upwards. ▪ The lifting operation is finished.
▪ All ties have been removed.
▪ Formwork opened.
System dimensions
a
b
f
g
cd
98058-406-07
f ... 500 mm
g ... min. 350 mm
98058-406-06
h h
a ... 700 mm
b ... 2000 mm
c ... 100 mm
d ... Height of casting section: 2700 mm - 4250 mm
e ... approx. 1000 mm
h
g
i i
98058-406-08
Note:
Note the connection points of the hydraulic cylinders!
Transverse-mem-
ber position
Longitudinal-
member position
V1 V1
V2 98058-459-02
98058-459-01
Service loads
+1
B B B
0
B
-1
B
-2
98058-406-01
Max. lifting force per cylinder: 400 kN ☞ During lifting, it is not permissible for the sum of
the vertical loads in the area of influence of any
one hydraulic cylinder to exceed 400 kN.
☞ Important note:
Use only the Tie rod system 20.0 with Doka
Stop anchor 20.0 17.5cm 90
98058-490-01
d b
c
WARNING
➤ If other stop-anchor lengths and plate sizes
98058-453-01
F
E are used, then revised structural analysis is
required and extra reinforcement steel must
A Climbing cone SCP 20.0 be placed where necessary.
B Sealing sleeve SCP 20.0 (expendable anchoring component) ➤ It is forbidden to use Stop anchors 20.0 with
C Stop anchor 20.0 17.5cm 90 (expendable anchoring component) a plate size of 55 mm and a stop-anchor
D Depth mark length of < 30.5 cm in conjunction with
E Cone screw M36 SW50 9cm
Climbing cones SCP 20.0.
F Bracket SCP suspension shoe ➤ It is forbidden to use the Stop anchor 20.0
11.5cm 90.
▪ Climbing cone SCP 20.0
- The positioning point and the suspension point
are prepared using the Climbing cone SCP 20.0.
▪ Stop anchor 20.0
- Expendable anchoring component for anchoring
the Climbing cone SCP (and thus the climbing
unit) in the concrete from one side.
▪ Cone screw M36 SW50 9cm
- At the positioning point – for fastening the Climb-
ing cone SCP.
- At the suspension point – for safe fixing of the
Bracket SCP suspension shoe, and thus of the
whole climbing unit.
▪ Bracket SCP suspension shoe
- Is anchored to the structure and is used for load
transfer.
- The suspension shoe is not rigidly connected to
the Bracket SCP. This facilitates the jobs of
installation on and removal from the structure.
Plan view
98058-489-01
G
Suspension point
c
b C B A E
98058-489-02
c b c
98058-455-02
a
a ... min. 150 mm, if c < 2 x b
b ... installation depth a ... 47 - 88 cm
c ... Wall thickness b ... order length = wall thickness 'a' - 2 x concrete cover 'c'
c ... concrete cover 14.0 cm
Risk of formwork falling off if two cones are A Climbing cone SCP 20.0
fitted opposite one another and joined with B Sealing sleeve SCP 20.0 (expendable anchoring component)
a tie rod. C Stop anchor double-ended 20.0 ..cm 90 (expendable anchoring
Unscrewing the anchoring component on one component)
side may cause the anchoring point on the E Cone screw M36 SW50 9cm
opposite side to shear off. G Packing plate
➤ Every suspension point must have its own
separate anchorage.
Exception: Suspension points prepared with a WARNING
Stop anchor double-ended 20.0 In walls that are less than 59 cm thick, the
Stop anchor double-ended 20.0 ..cm 90 has a
much lower load-bearing capacity than the
Stop anchor 20.0 17.5cm 90.
➤ Revised static calculation is required here.
98058-455-03
➤ Where high tensile forces occur, locate extra
reinforcement steel as statically required.
Preparing the positioning point Positioning point with Cone screw M36
SW50 9cm (with hole drilled through form-ply)
Installation:
➤ Fasten a packing plate (e.g. Dokaplex 15 mm) to the
form-ply (position as per project plan).
➤ Drill diam. 36 mm holes in the form-ply (position as
shown in shop drawing / assembly plan).
Secure the Positioning template SCP to the
form-ply to ensure that the holes are accurately
positioned relative to each other.
98058-453-02
a
WARNING
➤ Always screw the stop anchor into the Climb-
ing cone SCP until it fully engages (up to the
depth mark). ➤ Push the Sealing sleeve SCP completely on to the
Not screwing the stop anchor sufficiently far Climbing cone SCP.
into the cone may subsequently lead to ➤ Screw the stop anchor into the Climbing cone SCP,
reduced load-bearing capacity and to the until it engages (up to the depth mark).
failure of the suspension point – resulting in ➤ Push the Cone screw M36 SW50 9cm through the
injury and damage. form-ply, screw it into the Climbing cone SCP and
➤ Use only the Cone screw M36 SW50 9cm for tighten it firmly.
the positioning point and suspension point
(head of screw is yellow)! a
➤ It is forbidden to use the Positioning disk
M36 to prepare a positioning point.
C D B A
G
WARNING
Sensitive rod steel!
➤ Never weld or heat tie rods.
➤ Tie rods that are damaged or have been
weakened by corrosion or wear must be E
☞
a ... 45 - 55 mm
▪ The axis of the Climbing cone SCP must be A Climbing cone SCP 20.0
at right-angles to the surface of the concrete
B Sealing sleeve SCP 20.0 (expendable anchoring component)
– maximum angle of deviation: 2°.
C Stop anchor 20.0 17.5cm 90 (expendable anchoring component)
▪ The Climbing cone SCP must be embedded
D Depth mark
so that it is flush with the concrete surface.
E Cone screw M36 SW50 9cm
▪ Tolerance for locating the positioning points
G Packing plate
and suspension points: ±10 mm in the hori-
zontal and the vertical.
Tools needed:
▪ The two positioning points of a Suspension
shoe must be mounted at the same height – ▪ Reversible ratchet 3/4"
with max. 2° deviation from the horizontal. ▪ Cone spanner SCP 20.0 (for climbing cone)
▪ Climbing cones SCP are supplied with Seal- ▪ Extension 20cm 3/4"
ing sleeves SCP. Every time the cones are ▪ Box nut 50 3/4" (for Cone screw M36 SW50 9cm)
re-used, fit them with new sealing sleeves
first.
C D B A J
98058-456-01
E
Installation:
➤ Fix the plank to the Doka beams. 98058-483-01
➤ Push the Sealing sleeve SCP completely on to the A Climbing cone SCP 20.0
Climbing cone SCP. B Sealing sleeve SCP 20.0 (expendable anchoring component)
➤ Screw the stop anchor into the universal climbing C Stop anchor 20.0 17.5cm 90 (expendable anchoring component)
cone, until it engages (up to the depth mark). D Depth mark
➤ Push the Positioning screw SCP M36 through the E Cone screw M36 SW50 9cm
plank and form-ply and screw it into the Climbing J Form-ply protector 38mm (width-across 70 mm)
cone SCP.
➤ Tighten the nut of the positioning screw to fix the Where necessary, the Form-ply protector 38mm can be
Climbing cone SCP into place on the form-ply. closed off with a Framax Xlife plus frame hole plug
38mm (included with product).
a
C D B A I
98058-456-02
98058-483-02
98058-484-02
98058-453-03
Tr687-200-01 Tr687-200-01
☞
Retrofitting a safe suspension point Important note:
➤ Weld a bead to the Super plate to join the nut
Dimensioning the suspension point and the plate. Do this BEFORE screwing the
super plate onto the tie rod.
➤ Before welding the seam, align the wing nut parallel
The required cube compressive strength of the con- to the baseplate.
crete and ready-mix mortar at the time of loading must
be specified separately for each project by the struc- E
tural designer. It will depend on the following factors:
▪ load actually occurring
▪ wall thickness 98034-228-01
▪ reinforcement / extra reinforcement steel
E Weld-seam
▪ distance from edge
The introduction of the forces, the transfer of these
forces into the structure, and the stability of the overall ➤ On the other side of the concrete wall, screw on the
construction, must all be verified by the structural Super plate (now welded together) and secure it with
designer. a screw and dowel so that it cannot be unscrewed.
B A
I
a
D C B A
98058-455-05
98058-455-06
a ... 28 mm
b ... 215 mm A Climbing cone SCP 20.0
c ... 95 mm B Sealing sleeve SCP 20.0
A Climbing cone SCP 20.0 I Stop anchor 20.0
B Sealing sleeve SCP 20.0
C Tie rod 20.0mm
D Ready-mix mortar
b
c
D C B A E
98058-489-04
b ... 215 mm
c ... diam. 95 mm
A Climbing cone SCP 20.0
B Sealing sleeve SCP 20.0 (expendable anchoring component)
C Tie rod 20.0mm (expendable anchoring component)
D Adhesive: 'Hilti HIT-RE 500-SD' or equivalent product
E Cone screw M36 SW50 9cm
☞ Important note:
For more information, please contact your Doka
technician.
☞ Important note:
Use only the Tie rod system 20.0 with Doka
WARNING
Do not use the holes in the middle of the
automatic climbing formwork.
Bracket SCP suspension shoe for anchoring
with Universal climbing cones 20.0.
Risk of confusion! ➤ Install the cover in such a way that the holes
➤ If Doka automatic climbing formwork is being are concealed.
used jointly with other Doka climbing sys-
tems, then the Tie rod system 20.0 must be
used throughout the entire project.
98058-488-01
C 98058-454-01
D
B
A
F E
Note:
In the project planning stage and later, avoid mixing
different types of stop anchor to exclude the risk of
confusion on the jobsite.
a e
98071-350-20
d b
a e
98071-355-01
d b
c
WARNING
The short Stop anchor 20.0 11.5cm 90 has a
much lower load-bearing capacity than the
Stop anchor 20.0 17.5cm 55.
➤ For this reason, the short stop anchor is only
allowed to be used on systems with low ten-
sile loads at the anchoring location, such as
on climbing systems inside shafts.
➤ If the geometry means that it is only possible
to install the short stop anchor, then revised
static calculation, with extra reinforcement
steel, is required in cases where larger ten-
sile loads may occur.
➤ The Stop anchor 20.0 11.5cm 90 is only per-
mitted for wall thicknesses < 25 cm. For wall
thicknesses 25 cm, the Stop anchor 20.0
17.5cm 55 (or larger) must be used.
Plan view
a
TR1006-200-02
D
Suspension point
c
b
C B A E
98037-281-01
TR1006-200-03
c b c
Risk of formwork falling off if two cones are a
fitted opposite one another and joined with
a tie rod. a ... 30 - 71 cm
Unscrewing the anchoring component on one b ... order length = wall thickness a - 2 x concrete cover c
c ... concrete cover 5.5 cm
side may cause the anchoring point on the
opposite side to shear off. A Universal climbing cone 20.0
➤ Every suspension point must have its own B Sealing sleeve K 20.0 (expendable anchoring component)
separate anchorage. C Stop anchor double-ended 20.0 ..cm 90 (expendable anchoring
component)
Exception: Suspension points prepared with a
Stop anchor double-ended 20.0 D Packing plate (e.g. Dokaplex 15 mm)
E Cone screw B 7cm
WARNING
98037-281-02
In walls that are less than 42 cm thick, the
Stop anchor double-ended 20.0 ..cm 90 has a
much lower load-bearing capacity than the
Stop anchor 20.0 17.5cm 55.
➤ Revised static calculation is required here.
➤ Where high tensile forces occur, locate extra
reinforcement steel as statically required.
b
a
98058-475-01
WARNING
➤ Always screw the stop anchor into the uni-
versal climbing cone until it fully engages (up
to the depth mark).
Not screwing the stop anchor sufficiently far
into the cone may subsequently lead to
reduced load-bearing capacity and to the
failure of the suspension point – resulting in
injury and damage.
➤ Use only the Cone screw B 7cm for the posi-
tioning point and suspension point (head of
screw is red)!
WARNING
Sensitive rod steel!
➤ Never weld or heat tie rods.
➤ Tie rods that are damaged or have been
weakened by corrosion or wear must be
withdrawn from use.
Positioning point with Cone screw B 7cm (with Where necessary, the Form-ply
hole drilled through form-ply) protector 32mm can be closed off with a Cover
cap D35x3 (included with product).
Installation:
☞ Important note:
➤ Secure the Positioning template SCP to the
form-ply to ensure that the holes are accu-
rately positioned relative to each other.
98037-282-02
C D A H
98037-282-01
Tools needed:
▪ Centre drill-bit diam. 46 mm
▪ Reversible ratchet 3/4"
▪ Spanner for Universal climbing cone 15.0/20.0
▪ Extension 20cm 3/4"
▪ Box nut 50 3/4" (for Cone screw B 7cm)
☞
Retrofitting a safe suspension point Important note:
➤ Weld a seam onto the super plate to join the
Dimensioning the suspension point nut and the plate. Do this before screwing the
super plate onto the tie rod.
➤ Before welding the seam, align the wing nut parallel
The required cube compressive strength of the con- to the baseplate.
crete and ready-mix mortar at the time of loading must
be specified separately for each project by the struc- E
tural designer. It will depend on the following factors:
▪ load actually occurring
▪ wall thickness 98034-228-01
▪ reinforcement / extra reinforcement steel
E Weld-seam
▪ distance from edge
The introduction of the forces, the transfer of these
forces into the structure, and the stability of the overall ➤ On the other side of the concrete wall, screw on the
construction, must all be verified by the structural Super plate (now welded together) and secure it with
designer. a screw and dowel so that it cannot be unscrewed.
➤ Drill a hole of diam. 55 mm and 130 mm depth. F Welded Super plate 20.0 B
➤ Drill a hole of diam. 28 mm. G Hexagon timber screw 10x50
➤ Push the sealing sleeve all the way onto the Univer- H Dowel, diam. 12
sal climbing cone.
➤ Screw the tie rod into the universal climbing cone
until it fully engages. WARNING
➤ Put the unit part-way into the borehole.
➤ Do NOT fit Stop anchors with the anchor
➤ Paste the ready-mix mortar (site-provided) into the plate left exposed! This must always be
drilled hole with a spatula. embedded in the concrete.
b
A
C
a
98037-279-01
D C B A
98037-286-01
In the case of large wall thicknesses or in corner and If only M30 threaded rods are glued in instead of the
end zones, a safe suspension point can be retrofitted Universal climbing cone with tie rod, the manufacturer
using 'Hilti HIT-RE 500-SD' adhesive or an equivalent of the anchorage (e.g. Hilti) has to provide proof of cal-
product. culation for the suspension point
It is essential to provide the manufacturer with the fol-
Comply with the manufacturer's installation lowing information for this purpose:
instructions for the adhesive!
▪ Concrete strength
▪ a, b, c ... distance from edge
Glue in a tie rod with Universal climbing cone 20.0 ▪ d ... centre-to-centre spacing of anchors
▪ e ... wall thickness
▪ Zd ... design value of the tensile load
on the anchor group (F = 1.5)
▪ Vd ... design value of the shear force
b
on the anchor group (F = 1.5)
d
c
D C B A E
b
98071-350-22 e
b ... 130 mm Zd
c ... diam. 55 mm
d
A Universal climbing cone 20.0 Vd
B Sealing sleeve K 20.0 (expendable anchoring component)
C Tie rod 20.0mm (expendable anchoring component)
D Adhesive: 'Hilti HIT-RE 500-SD' or equivalent product
c
E Cone screw B 7cm
☞
98058-493-01
Important note:
Example:
For more information, please contact your Doka ▪ Basic data:
technician. - Vk ... vertical load: 400 kN
- Zk ... tensile load: 150 kN
- F ... Safety factor: 1.5
▪ Zd ... Zd ... 150 (Zk) x 1.5 (F) = 225 kN
▪ Vd ... Zd ... 400 (Zk) x 1.5 (F) = 600 kN
Note:
Actual loads have to be ascertained on a project-spe-
cific basis. Loads higher than those used in this exam-
ple are possible.
☞ Important note:
For more information, please contact your Doka
technician.
☞ Important note:
▪ Prepare a sufficiently large assembly area.
▪ A hard, flat, firm surface is needed!
WARNING
Falling hazard!
➤ Do not step onto the pouring platforms until
the formwork is closed!
➤ Use personal fall arrest systems to protect
against fall hazards when working on
unsafeguarded drop-off edges (e.g. Doka
personal fall-arrest set).
b
c
a
98058-461-03
A B
98058-461-07
98058-457-03
98058-460-02
C Support roller in parking position
E Bracket SCP suspension shoe
Pre-assembling the upper brackets F Fixing plate
A D
98058-476-01
A Bracket SCP
D Bracket SCP strut connection (project-specific)
G
98058-460-04
A Bracket SCP
E Bracket SCP suspension shoe
98058-460-03
H
98058-460-01
A Bracket SCP
E Bracket SCP suspension shoe
F Fixing plate
98058-461-06
➤ Detach the crane suspension tackle from the
H Working platform
bracket.
➤ Install the brackets of the working platform in the
same way. ➤ Pin the working platform to the Brackets SCP and
and secure the pins with Spring cotters 5mm.
☞
➤ Pin each Vertical profile 150 into the brackets with 4
Important note: Fastening bolts FRQ 150 and secure the bolts.
Overload of the temporary reshore
➤ Dimension the reshoring of the working plat- J
form adequately.
The formwork will be set down on this working
platform at a later stage of the assembly pro-
cess.
➤ Place floor props under the working platform.
H
A
I 98058-460-05
A Bracket SCP
J Vertical profile 150
98058-461-05
H Working platform
Included with the Vertical profile 150:
I Floor prop
▪ 4 Fastening bolts FRQ 150
▪ 8 washers 21
Erecting the vertical scaffold ▪ 8 cotter pins 5x45
➤ Lift the pre-assembled vertical scaffold into the
Positioning the formwork
Brackets SCP.
➤ Prepare squared timbers for the correct operational
height along the entire length of the formwork.
➤ Attach the crane suspension tackle to the lifting
brackets on the pre-assembled formwork.
➤ Lift in the formwork elements and secure them
against tip-over.
➤ Mount temporary platforms (site-provided).
98058-461-02
98058-461-04
98058-461-01
98058-458-04
A Working platform
B Suspended platform
F
98058-424-01
☞ Important note:
➤ Do not secure the platforms to the lower C
brackets. E G
➤ Pin the Suspension profiles FRQ 50 to the Multi-pur-
pose walings WS10 Top50 of the working platform
and secure the pins with spring cotters.
F C G
F
98058-424-01
98058-405-10
98058-458-03
A Working platform
B Suspended platform
A B A B B A
98058-458-05
A Roll-back formwork
B Holding formwork
Close-up A: Roller unit SK (roll-back formwork) Close-up B: With element suspender (holding formwork)
E
D
F
C C
98058-422-02
98058-422-03
98058-422-05
98058-422-04
C Element holder SK ➤ Guide the tie rod through the Element holder SK on
D Roller unit SK the formwork.
E Element suspender SK ➤ Screw the tie rod into the roller unit / tie-rod holder,
F Tie-rod holder 15.0 and secure it with a locking plate.
☞
Fixing the tie rod in the roller unit
Important note:
➤ The excess length of the tie rod below the 1) Raise the locking plate.
star grip nut must be at least as large as the 2) Screw the tie rod into the roller unit until it protrudes
clearance between the formwork and the by approx. 20 mm.
working platform.
3) Push the locking plate onto the tie rod.
➤ Screw the star grip nut onto the tie rod and tighten it This fixes the tie rod so that it cannot be turned.
until the element is suspended.
B
A
1
3
c
D 2
E 98071-266-11 98071-266-10
a
c ... approx. 20 mm
Max. load:
1300 kg per Roller unit SK
1000 kg per Roller unit WS10
2) Screw the tie rod into the Tie rod holder 15.0 until it
98058-416-14
1
➤ Lock the Star grip nut 15.0 with a hexagon nut 15.0.
3
c
98071-304-02 98071-304-03
c ... approx. 20 mm
Max. load:
1300 kg per Tie rod holder 15.0
☞ Important note:
Note the installation position of the Upper cylin-
➤ Attach the crane suspension tackle to the Upper cyl-
inder connector SCP.
der connector SCP and the position of the
clamping angle M7!
C B A
98058-421-01
98058-458-02
98058-459-03
D
E Cylinder tube guide SCP
F Bracing
98058-421-02
C Clamping angle M7
D Grille-beam pair U300
98058-421-05
98058-458-06
98058-458-01
98058-457-01
98058-458-07
➤ Lift the platform to the next position (see the section headed 'Typical sequence of lifting phases').
➤ Bring up the lower brackets and base beam. ➤ Place the reinforcement.
➤ Apply concrete release agent and set up one side of ➤ Close the formwork and tie it.
the formwork. ➤ Pour the 3rd section.
➤ Adjust the formwork. ➤ Suspend suspended platform "-2" to suspended plat-
➤ Mount the positioning-points. form "-1".
➤ Mount the 'Boxes for latch'.
98058-406-01
98058-406-03
Raising the platform ➤ Move the suspension shoes of the main working
platform to the same height as the new positioning
points.
➤ Press and hold down the 'Lift cylinder' button until the To do this operate the cylinders of the lifting units
platform has been lifted approx. 30 cm. attached on one side one at a time.
The upper brackets are no longer resting in the sus-
pension shoes. Mounting the Suspension shoe
➤ Remove the cone screws from the upper suspension ➤ Align the suspension shoes with the positioning
shoes. points.
➤ Fix the Bracket SCP suspension shoe to the Climb-
☞ Important note:
Failure of any one hydraulic cylinder during the
lifting operation will lead to deformations of the
ing cones SCP with 2 Cone screws M36 SW50 9cm.
A tightening torque of 100 Nm (20 kg, assuming a
ratchet-length of approx. 50 cm) is sufficient.
platform.
▪ The Bracket SCP suspension shoe must be
➤ Watch out for the manometer indicator, and secured with 2 Cone screws M36
act upon it! SW50 9cm.
➤ Stop the lifting operation if there are any ▪ The Bracket SCP suspension shoe must be
irregularities. flush against the concrete.
Do not resume the lifting operation until the
malfunction has been rectified.
➤ Press and hold down the 'Lift cylinder' button until the
suspension shoes of the main working platform are
at the same height as the new positioning points.
98058-406-04
☞
Pulling up the lower bracket Important note:
➤ Do not lower the lower base beam into the
➤ Press and hold down the 'Lower cylinder' button until concrete box-out.
the brackets of the main working platform are seated
in the suspension shoes and the lower brackets are The latches of the lower base beam remain free
lifted approx. 30 cm. of load.
➤ Remove the cone screws from the lower suspension ➤ Move the suspension shoe of the lower bracket to
shoes. the same height as the new positioning points.
To do this operate the cylinders of the lifting units
The travel path is free of obstacles. attached on one side one at a time.
➤ Switch off the hydraulic unit.
➤ Press and hold down the 'Lower cylinder' button until The lifting operation is finished.
the suspension shoes of the lower brackets are at
Mounting the Suspension shoe
the same height as the new positioning points.
➤ Align the suspension shoe with the positioning point.
➤ Fix the Bracket SCP suspension shoe to the Climb-
ing cones SCP with 2 Cone screws M36 SW50 9cm.
A tightening torque of 100 Nm (20 kg, assuming a
ratchet-length of approx. 50 cm) is sufficient.
▪ The Bracket SCP suspension shoe must be
secured with 2 Cone screws M36
SW50 9cm.
▪ The Bracket SCP suspension shoe must be
flush against the concrete.
98058-406-05
General remarks
Hydraulic system
The Platform SCP is driven by a hydraulic branch-line
system.
The branch-line system with a stationary hydraulic unit
allows the entire Platform SCP to be driven 'in sync'.
The hydraulic system is equipped with all necessary
electrical and hydraulic control and safety elements for
ensuring lasting safe operation.
☞ Important note:
Dirt in the hydraulic system leads to malfunc-
tions. The following measures prevent dirt from
entering the hydraulic system.
▪ Start up the hydraulic unit at least one hour
before the lifting operation begins.
▪ Do not disconnect the hydraulic hoses after
initial installation.
▪ Do not keep cylinders extended after lifting
the platform. Pull up the lower base beams
and brackets.
☞ Important note:
If the plunger rod is contaminated
(e.g. with concrete laitance):
▪ Carefully clean the plunger rod before
retracting the cylinders.
▪ Do not hit any objects against the plunger
rod.
92802-801
B B General remarks
98058-405-12
Ladder system
For safe up-and-down access between platforms.
a
A
a
D
98058-416-28
A Manhole B 70/60cm
B System ladder XS 4.40m
C Ladder extension XS 2.30m 98058-405-14
D Ladder adapter XS a ... min. 1 m
Note:
The Ladder system XS must be implemented in such a
way that all national regulations are complied with.
Put up safety netting in the ladder and manhole zone,
as required by the applicable regulations.
WARNING
➤ The Ladders XS may only be used as part of
the XS system, and must NOT be used sep-
arately (as "lean-to" ladders).
C
B
A B C
D
85°
A
98010-359-03
98058-480-01
A Cover hinge SK 35cm
A Manhole B 70/60cm B Manhole lid
B System ladder XS 4.40m C Framax screw 7x22
C Ladder bolt XS D Timber stop-bar
d
a
98058-481-01
a ... 800 mm
b ... 800 mm
c ... 50 mm
d ... 500 mm
98058-482-01
E Ladder suspension SK
e
98058-481-02
F
G
E
98058-481-03
E Ladder suspension SK
F System ladder XS 4.40m
G Ladder bolt XS
Lengthening the ladder ➤ Screw the Ladder adapter XS to the platform deck-
ing.
Telescoping ladder extension (for adjusting to ➤ Fix the bottom of the ladder to the Ladder adapter
ground level) XS.
➤ To telescope the ladders past one another, lift the
safety latch on the ladder and fix the Ladder exten-
sion XS 2.30m onto the desired rung of the other lad-
der.
C
A
98010-337-02
B
D Ladder adapter XS
Tr625-201-04
Nuts & bolts etc. required for each Ladder adapter XS
▪ 4 square bolts M10x70
Close-up ▪ 4 washers A 10.5
▪ 4 hexagon nuts M 10
C
B
Ladder cage
Tr625-201-03
A
C
Tr625-202-01
F
Screws (C) are included in the scope of supply of the System ladder
XS 4.40m and the Ladder extension XS 2.30m. Tr625-201-02
Safety features
Rubber sheets or flaps for openings Closing the gap with a flap
of up to 50 mm in the decking
Gap between two platforms
When planning the platforms, a gap to the wall or to the D D
next platform is allowed for to ensure there is enough
play for the lifting operation.
☞
98058-416-19
Important note:
a B A C
Cover these gaps to prevent any small items
from falling off. a ... 50 mm
A Platform decking
Closing the gap with a rubber sheet B Cover hinge SK 35cm
C Universal countersunk screws
D Raw sheet 3-S 31mm 300/150cm
Gap between two platforms
B Gap between platform and wall
98058-416-18
a C A
a ... 50 mm
A Platform decking
B Rubber sheet, 0.35x10.00m
C Universal countersunk screw 5x50 + washer 6
D
Distance between bolted joints: approx. 20 cm
98058-416-20
a ... 50 mm
A Platform decking
B Cover hinge SK 35cm
C Universal countersunk screws
D Raw sheet 3-S 31mm 300/150cm
B A
☞ Important note:
The flaps must be open during the lifting opera-
tion.
a C
98058-416-17
a ... 50 mm
A Platform decking
B Rubber sheet, 0.35x10.00m
C Universal countersunk screw 5x50 + washer 6
CAUTION
When choosing what type of flap to use, make
sure that it has sufficient load-bearing capacity!
It is forbidden to use 21mm or 27mm 3-ply
sheeting for the manhole lid.
➤ Use a 32mm web board or equivalent 21mm
multi-ply formwork sheets with non-skid sur-
facing.
➤ Use the Planking hinge 39cm.
a
B A
98058-416-29
A A
a
C
E E
98071-270-06 98071-270-05
Height of guard-rail
boards:
15 cm 20 cm
1.1 kN/m2 4.0 m 1.7 m 1.3 m
1.3 kN/m2 3.4 m 1.5 m 1.1 m
1.7 kN/m2 2.6 m 1.1 m 0.8 m
98058-409-05 a ... 1500 mm
☞ Important note:
In this handrail-post configuration, gapless
enclosures are not allowed!
Mounting handrail posts to deck-boards Mounting handrail posts to a Raw sheet 3-S 38mm
☞ Important note:
➤ Screw planks to the underside of the deck-
Note:
The Screw-on handrail post 1.50m can be bolted
boards to distribute the loads. directly onto the Raw sheet 3-S 38mm. There is no
➤ Bolt the Screw-on handrail post onto the platform need for a plank to distribute the loads.
decking.
F
E A
b c
98071-296-01
E
F Raw sheet 3-S 38mm 300/150cm
A WARNING
98016-292-01 ➤ Do not mount Screw-on handrail posts
1.50m on Raw sheets 3-S 31mm!
b ... 150 mm
c ... 100 mm
Only the thicker Raw sheet 3-S 38mm is suita-
ble for mounting the Screw-on handrail post
A Screw-on handrail post 1.50m 1.50m.
E 5x20 cm board
Useful equipment
Suspended stair tower 250
The suspended stair tower provides easy access to the
Platform SCP, a safe 'up and down route' between the
working platform and the follow-up platform, and an
emergency exit.
98058-304-05
98058-304-06
Utilise the benefits of Doka multi-trip packaging Using Doka skeleton transport boxes
on your site. 1.70x0.80m as transport devices
Multi-trip packaging such as containers, stacking pal-
lets and skeleton transport boxes keep everything in Lifting by crane
place on the site, minimise time wasted searching for
parts, and streamline the storage and transport of sys-
tem components, small items and accessories. ➤ Only lift the boxes when their sidewalls are
closed!
☞ ▪▪
Doka skeleton transport box Multi-trip packaging items may only be lifted
1.70x0.80m one at a time.
Use a suitable lifting chain
(e.g. Doka 4-part chain 3.20m).
Do not exceed the permitted load-bearing
capacity.
▪ Spread-angle max. 30°!
9234-203-01
Tr755-200-04 Tr755-200-05
A
Tr755-200-02
9206-202-01
Doka stacking pallet 1.55x0.85m and Using Doka stacking pallets as transport
1.20x0.80m devices
Lifting by crane
Storage and transport devices for long items:
☞ ▪▪
▪ durable Multi-trip packaging items may only be lifted
▪ stackable one at a time.
Suitable transport appliances: Use a suitable lifting chain
▪ crane (e.g. Doka 4-part chain 3.20m).
▪ pallet stacking truck Do not exceed the permitted load-bearing
capacity.
▪ forklift truck
▪ Load the items centrically.
The Bolt-on caster set B turns the stacking pallet into a ▪ Fasten the load to the stacking pallet so that
fast and manoeuvrable transport trolley. it cannot slide or tip out.
Follow the directions in the "Bolt-on castor set ▪ When lifting stacking pallets to which Bolt-on
B" Operating Instructions! castor sets B have been attached, you must
also follow the directions in these Operating
Instructions!
▪ Spread-angle max. 30°!
= =
a
92815-224-01
Max. load: 1100 kg
Permitted imposed load: 5900 kg a
Doka stacking pallet 1.55x0.85m max. 4.0 m
92816-206-01
Max. n° of boxes on top of one another The Bolt-on caster set B can be mounted to the follow-
Outdoors (on the site) Indoors ing multi-trip packaging items:
Floor gradient up to 3% Floor gradient up to 1% ▪ Doka accessory box
3 6 ▪ Doka stacking pallets
It is not allowed to stack empty
pallets on top of one another! Follow the directions in the Operating Instruc-
Malfunctions
Declaration of Conformity
EC Declaration of Conformity
pursuant to EC Directive 2006/42/EC.
The manufacturer declares that by reason of its conception and
design, the following product
Platform SCP
conforms – in the version marketed by ourselves – to the pertinent
fundamental health and safety stipulations of the relevant EC Direc-
tives.
The following harmonised standards were applied:
▪ EN ISO 12100:2010
▪ EN 349:1993+A1:2008
▪ EN 982 1996+A1:2008
▪ EN 60204-1:2005
Person authorised to compile technical documentation
(pursuant to European Directive on Machinery Annex II):
Ing. Johann Peneder
Josef Umdasch Platz 1
A-3300 Amstetten
Doka GmbH
Amstetten, 19/01/2016 Josef Umdasch Platz 1
A-3300 Amstetten
Grille beam U300 1.25m 57.0 540289005 Joint plate WU30 F 22.9 581252000
Grille beam U300 2.50m 115.0 540289008 Zwischenplatte WU30 F
Grille beam U300 3.00m 139.0 540289010 Galvanised
Grille beam U300 4.00m 185.0 540289020 Width: 51 cm
Grille beam U300 5.00m 231.0 540289030
Height: 51 cm
Grille beam U300 6.00m 277.0 540289040
Grille beam U300 7.00m 324.0 540289050
Grille beam U300 8.00m 370.0 540289060
Grille beam U300 9.00m 416.0 540289070
Rostträger U300
Painted blue
Bracing shoe 2-times 9.3 540289800 Lower latch beam 154.0 540289350
Verschwertungsschuh 2-fach Unterer Klinkenträger
Galvanised Galvanised
Length: 31 cm Length: 72 cm
Height: 21 cm
Cylinder head guide SCP 5.4 583136000 Railing profile IPB140 longitud. 117.0 540289470
Zylinderkopfführung SCP Geländerprofil IPB140-Joch
Galvanised Galvanised
Length: 24 cm Length: 282.5 cm
Width: 21 cm
Suspension profile FRQ 120/8 3.790m 115.0 540289790 Beam clamp U300 double 0.50 540289935
Suspension profile FRQ 120/8 4.100m 123.0 540289795 Trägerklammer U300 doppelt
Suspension profile FRQ 120/8 4.410m 131.0 540289760 Galvanised
Suspension profile FRQ 120/8 4.720m 139.0 540289770
Suspension profile FRQ 120/8 5.030m 148.0 540289775
Suspension profile FRQ 120/8 5.340m 156.0 540289780
Suspension profile FRQ 120/8 5.650m 164.0 540289785
Hängeprofil FRQ 120/8
Galvanised
Element suspender SK 3.9 583260000
Elementabhängung SK
Galvanised
Roller safety pin WS10 0.35 540451160 Double bolt D12 0.50 540289540
Rollensicherung WS10 Doppelbolzen D12
Galvanised Galvanised
Length: 17 cm Width: 13.4 cm
Clamping plate WS10 H 1.1 540289160 Hydraulic unit SCP B 50/60Hz 2100.0 583102000
Klemmplatte WS10 H Hydraulikaggregat SCP B 50/60Hz
Galvanised Painted blue
Length: 12 cm Length: 220 cm
Width: 12 cm Width: 130 cm
Height: 202 cm
Ladder holder SK 0.36 581532000 Follow the directions in the "Opera-
Leiternhalter SK ting Instructions"!
Galvanised
Doka personal fall-arrest set 3.6 583022000 Connection adapter S SCP 2.0 581647000
Doka-Auffanggurt Anschlussadapter S SCP
Follow the directions in the "Opera-
ting Instructions"!
Tie rod 15.0mm galvanised 0.50m 0.72 581821000 Spring cotter 5mm 0.05 580204000
Tie rod 15.0mm galvanised 0.75m 1.1 581822000 Federvorstecker 5mm
Tie rod 15.0mm galvanised 1.00m 1.4 581823000 Galvanised
Tie rod 15.0mm galvanised 1.25m 1.8 581826000 Length: 13 cm
Tie rod 15.0mm galvanised 1.50m 2.2 581827000
Tie rod 15.0mm galvanised 1.75m 2.5 581828000
Tie rod 15.0mm galvanised 2.00m 2.9 581829000
Tie rod 15.0mm galvanised 2.50m 3.6 581852000
Tie rod 15.0mm galvanised .....m 1.4 581824000 Multi-purpose waling WS10 Top50 0.50m 10.2 580001000
Tie rod 15.0mm non-treated 0.50m 0.73 581870000 Multi-purpose waling WS10 Top50 0.75m 14.9 580002000
Tie rod 15.0mm non-treated 0.75m 1.1 581871000 Multi-purpose waling WS10 Top50 1.00m 19.6 580003000
Tie rod 15.0mm non-treated 1.00m 1.4 581874000 Multi-purpose waling WS10 Top50 1.25m 24.7 580004000
Tie rod 15.0mm non-treated 1.25m 1.8 581886000 Multi-purpose waling WS10 Top50 1.50m 29.7 580005000
Tie rod 15.0mm non-treated 1.50m 2.1 581876000 Multi-purpose waling WS10 Top50 1.75m 35.0 580006000
Tie rod 15.0mm non-treated 1.75m 2.5 581887000 Multi-purpose waling WS10 Top50 2.00m 38.9 580007000
Tie rod 15.0mm non-treated 2.00m 2.9 581875000 Multi-purpose waling WS10 Top50 2.25m 44.2 580008000
Tie rod 15.0mm non-treated 2.50m 3.6 581877000 Multi-purpose waling WS10 Top50 2.50m 48.7 580009000
Tie rod 15.0mm non-treated 3.00m 4.3 581878000 Multi-purpose waling WS10 Top50 2.75m 54.2 580010000
Tie rod 15.0mm non-treated 3.50m 5.0 581888000 Multi-purpose waling WS10 Top50 3.00m 58.9 580011000
Tie rod 15.0mm non-treated 4.00m 5.7 581879000 Multi-purpose waling WS10 Top50 3.50m 68.4 580012000
Tie rod 15.0mm non-treated 5.00m 7.2 581880000 Multi-purpose waling WS10 Top50 4.00m 79.4 580013000
Tie rod 15.0mm non-treated 6.00m 8.6 581881000 Multi-purpose waling WS10 Top50 4.50m 89.1 580014000
Tie rod 15.0mm non-treated 7.50m 10.7 581882000 Multi-purpose waling WS10 Top50 5.00m 102.0 580015000
Tie rod 15.0mm non-treated .....m 1.4 581873000 Multi-purpose waling WS10 Top50 5.50m 112.4 580016000
Ankerstab 15,0mm Multi-purpose waling WS10 Top50 6.00m 118.0 580017000
Mehrzweckriegel WS10 Top50
Painted blue
Doka beam H20 eco N 1.80m 9.0 189283000 Beam screw S 8/70 0.06 580116500
Doka beam H20 eco N 2.45m 12.3 189271000 Riegelverschraubung S 8/70
Doka beam H20 eco N 2.65m 13.3 189272000 Galvanised
Doka beam H20 eco N 2.90m 14.5 189273000 Length: 8 cm
Doka beam H20 eco N 3.30m 16.5 189284000
Width-across: 13 mm
Doka beam H20 eco N 3.60m 18.0 189285000
Doka beam H20 eco N 3.90m 19.5 189276000
Doka beam H20 eco N 4.50m 22.5 189286000 Scaffold tube 48.3mm 0.50m 1.7 682026000
Doka beam H20 eco N 4.90m 24.5 189277000 Scaffold tube 48.3mm 1.00m 3.6 682014000
Doka beam H20 eco N 5.90m 29.5 189287000 Scaffold tube 48.3mm 1.50m 5.4 682015000
Doka beam H20 eco N .....m 5.0 189299000 Scaffold tube 48.3mm 2.00m 7.2 682016000
Doka beam H20 eco N .....m BS 5.0 189289000 Scaffold tube 48.3mm 2.50m 9.0 682017000
Doka-Träger H20 eco N Scaffold tube 48.3mm 3.00m 10.8 682018000
Varnished yellow Scaffold tube 48.3mm 3.50m 12.6 682019000
Scaffold tube 48.3mm 4.00m 14.4 682021000
Scaffold tube 48.3mm 4.50m 16.2 682022000
Scaffold tube 48.3mm 5.00m 18.0 682023000
Scaffold tube 48.3mm 5.50m 19.8 682024000
Scaffold tube 48.3mm 6.00m 21.6 682025000
Scaffold tube 48.3mm .....m 3.6 682001000
Gerüstrohr 48,3mm
Galvanised
Doka beam H20 eco P 1.80m 9.4 189940000 Swivel coupler 48mm 1.5 582560000
Doka beam H20 eco P 2.45m 12.7 189936000 Drehkupplung 48mm
Doka beam H20 eco P 2.65m 13.8 189937000 Galvanised
Doka beam H20 eco P 2.90m 15.1 189930000
Doka beam H20 eco P 3.30m 17.2 189941000 Width-across: 22 mm
Doka beam H20 eco P 3.60m 18.7 189942000 Follow fitting instructions!
Doka beam H20 eco P 3.90m 20.3 189931000
Doka beam H20 eco P 4.50m 23.4 189943000
Doka beam H20 eco P 4.90m 25.5 189932000
Doka beam H20 eco P 5.90m 30.7 189955000
Doka beam H20 eco P 9.00m 46.8 189956000 Trapezoidal metal sheet 35x207mm 1.03x.....m 6.1 580786000
Doka beam H20 eco P .....m 5.2 189999000 Trapezblech 35x207mm 1,03x.....m
Doka beam H20 eco P .....m BS 5.2 189957000 Painted yellow
Doka-Träger H20 eco P
Varnished yellow Galvanised
Flat head screw 6x60mm 0.008 580764000 Tool box SK 23.0 581539000
Tellerkopfschraube 6x60mm Werkzeugbox SK
Galvanised included in scope of supply:
(A) Box nut 17 1/2" L 0.24 581542000
(B) Box nut 19 1/2" L 0.16 580598000
(C) Box nut 22 1/2" L 0.25 581543000
(D) Box nut 24 1/2" L 0.30 586364000
(E) Box nut 24 3/4" L 0.25 582845000
Rubber sheet 0.35x10.00m 25.6 580789000 (F) Box nut 30 1/2" L 0.50 581545000
Gummiplatte 0,35x10,00m (G) Box nut 30 3/4" L 0.52 582846000
Height: 0.5 cm (H) Box nut 32 3/4" L 0.66 581544000
(I) Box nut 36 3/4" L 0.67 580895000
(J) Box nut 13 1/2" 0.06 580576000
(K) Box nut 24 3/4" 0.21 500679030
(L) Box nut 41 3/4" 0.79 581541000
(M) Box nut 50 3/4" 0.81 581449000
Doka express anchor 16x125mm 0.31 588631000 (N) Combination wrench 13 0.06 586341000
Doka-Expressanker 16x125mm (O) Combination wrench 17 0.16 586340000
Galvanised Length: 20 cm
Length: 18 cm (P) Combination wrench 19 0.14 582837000
Follow fitting instructions! (Q) Combination wrench 22 0.20 582838000
(R) Combination wrench 24 0.25 582839000
(S) Combination wrench 27 0.33 581548000
(T) Combination wrench 30 0.43 582840000
(U) Combination wrench 32 0.75 582859000
(V) Combination wrench 36 0.75 582860000
(W) Combination wrench 41 1.5 582841000
Doka coil 16mm 0.009 588633000
Doka-Coil 16mm (X) Ratchet-ring wrench 17/19 0.47 581546000
Galvanised Length: 27 cm
Diameter: 1.6 cm
(Y) Ratchet-ring wrench 22/24 0.59 581547000
Length: 33 cm
(Z) Fork wrench 50 0.98 581549000
Length: 41 cm
(AA)Reversible ratchet 1/2" 0.73 580580000
Lifting beam 110kN 6.00m 136.5 586359000 Galvanised
Umsetzbalken 110kN 6,00m Length: 30 cm
Galvanised
(AB)Reversible ratchet 3/4" 1.5 580894000
Length: 626 cm Galvanised
Follow the directions in the "Opera- Length: 50 cm
ting Instructions"! (AC)Extension 11cm 1/2" 0.20 580581000
(AD)Extension 20cm 3/4" 0.68 580683000
(AE)Extension 22cm 1/2" 0.31 580582000
(AF)Transition piece A 1/2"x3/4" 0.18 580684000
(AG)Universal pry bar 400/23 0.61 581550000
(AH)Angular arbor SL-1 1.4 582867000
(AI) Torx bit-set 25/30 0.25 581540000
(AJ)Universal cone spanner 15.0/20.0 0.90 581448000
Galvanised
Length: 9 cm
Width-across: 50 mm
(AK)Universal cone spanner M36 0.90 583274000
Galvanised
(AL)Center bit DF 30 0.10 586081000
(AM)Tie-rod wrench 15.0/20.0 1.9 580594000
Galvanised
Length: 37 cm
Diameter: 8 cm
(AN)Mounting tool for form-ply protector 0.96 580222000
Galvanised
Width: 12 cm
Height: 12 cm
N O P Q R S T U V W Z
X
AI
Y AB
AH
AJ AA
AG AD
AK
AM AL AE
AC
AF
AN I
H
G
F
M
E
D L
C K
B J
A
Tensioning instrument 300kN 32.0 581815000 Screw-set M24x65 10.9 2.3 583131000
Vorspanngerät 300kN Schraubensatz M24x65 10.9
Galvanised Galvanised
Width-across: 41 mm
Project-specific articles
Doka multi-trip transport box 1.20x0.80m 70.0 583011000 Tie rod system 20.0
Doka-Mehrwegcontainer 1,20x0,80m
Galvanised
Stop anchor 20.0 11.5cm 90 0.88 581456000
Height: 78 cm Sperranker 20,0 11,5cm 90
Non-treated
Doka is one of the world leaders in developing, manu- technical support are provided swiftly and profession-
facturing and distributing formwork technology for use in ally.
all fields of the construction sector. An enterprise forming part of the Umdasch Group, the
With more than 160 sales and logistics facilities in over Doka Group employs a worldwide workforce of more
70 countries, the Doka Group has a highly efficient dis- than 6000.