You are on page 1of 11

Project Name

Link Migration
PT OKI Pulp and Paper Mill
(Site Baung & Tanjung Tapah)

Document Name

MOP Document

Release date

5 November 2021

CV TRIM
Pekanbaru
Document Control

Company Name Sign

Elkana
Author CV TRIM
-
PIC 1
Document Control Smartfre
PIC 2
Customer PT OKI Pulp and Paper Mill

Document Release

Veion Date Release Page of Document Remark for Changes

1.0 5 November 2021 All Page

List of Distribution

Name Organization Description

Confidential, copyright and other patents

The information in the following documents is confidential and is owned by PT. xxxxxx. Patent has been
registered. No part of the following documents may be reproduced, stored, adapted or sent in any form, in
writing, mechanically, photocopies, sound / video recordings, etc. without written permission from PT. xxxxxx

2
Table of Content
DOCUMENT CONTROL....................................................................................................
TABLE OF CONTENT.......................................................................................................
LIST OF TABLE.................................................................................................................
1 EXECUTIVE SUMMARY.............................................................................................
1.1 Project Identification..........................................................................................
1.2 Project Scope....................................................................................................
1.3 Quality Control...................................................................................................

2 SCOPE OF WORK......................................................................................................
2.1 Prelimenery.......................................................................................................
2.2 Scope of Work For MOP Activity.......................................................................

3 MOP ACTIVITY...........................................................................................................
3.1 Preparation Activity...........................................................................................
3.2 Migration Activity...............................................................................................
3.3 Verification Activity............................................................................................
3.4 Monitoring Activity.............................................................................................
3.5 Rollback Activity................................................................................................

1. FORM AGREEMENT MOP DOCUMENT.................................................................


APPENDIX.......................................................................................................................
1. Appendix for xxxxxx........................................................................................

3
Executive Summary

CV Trim will implement at Baung & Tanjung Tapa for PT OKI Pulp & Paper.

CV Trim for providing hardware, Installation, and Local Maintenance.

Hardware, installation, and Local maintenance for:


a. type of service or equipment

1.1 Project Identification

Project Name Managed Service Access Point

Customer Name PT OKI Pulp & Paper

CV.TRIM will implement at Site Baung & Tanjung Tapa for PT. OKI Pulp & Paper .

Hardware, installation, and Local maintenance for:


a. type of service or equipment

1.2 Project Scope


The scope of the solutions should cover the following services:

Mention scope of activty


1. Maintenance Radio Link Wireless
2. Maintenance Access Point
3. Monitoring Perangkat

1.3 Quality Control


To provide the best quality assurance for PT. Smartfren, the implementation of migration will be carried out by a team of
CVTrim enginee and will be checked and controlled by the Smartfren

4
2 Scope of Work

2.1 Prelimenery
The scope of work (Scope of Works / SoW) describes the products and / or services provided by Xxxxxxxto in accordance
with the contract. The contents of the following scope of work are limited to the scope described and cannot be applied
to other work scopes that have been signed at the time of approval.

2.2 Scope of Work For MOP Activity


In detail for step by steps activity follow :

1. Preparation Activity
1. Instalasi Perangkat RB4011 CPE SF menuju ke Port Smartfren
a. Port05 R4011 mengarahkan ODU Smartfren
b. Topologi : ODU SF ---- [Eth5] RB4011 CPE SF [Eth1] ---- [Eth5] IGW
2. Menerima Alokasi IP untuk OKI PP
a. IP Public : 66.96.243.226-230
b. Subnet Mask : 255.255.255.248
c. Gateway : 66.96.243.225
d. DNS : 115.178.180.130-131
3. Melakukan Setup IP Smartfren di Laptop
a. IP 66.96.243.226
b. Netmask 255.255.255.248
c. Gateway 66.96.243.225
d. Melakukan plug Eth ke CPE RB4011 Smartfren Port01
4. Test Browsing
a. Youtube (Streaming)
b. Detik.com , Kompas.com (Lokal)
c. Facebook , Twitter (Internasional)
5. Test Bandwidth
a. Bandwidth Test speedtest.com ke IIX Jakarta
b. Bandwidth Test speedtest.com.sg ke Internasional
6. Melakukan Aktifasi Port di IGW Hotspot
a. Port01 RB4011 cross UTP ke Port01 IGW
b. Setup IP 66.96.243.228/29 di sisi IGW
c. Melakukan tes ping gateway

2. Migration to plan design :


1. Mengarahkann default router IGW Hotspot menuju ke ip 66.96.243.225
2. Melakukan aktifasi NAT menuju out interface SF dan konfigurasi DNS 115.178.180.130
dan 115.178.180.131 di sisi Router.
3. Melakukan Adjustment Bandwidth Baung 50Mb dan Tapa 20Mb

3. Verification Activity:
1. Melakukan Test koneksi di sisi pelanggan
. Youtube (Streaming)
. Detik.com , Kompas.com (Lokal)
Facebook , Twitter (Internasional)
Test Bandwidth
a. Bandwidth Test speedtest.com ke IIX Jakarta
b. Bandwidth Test speedtest.com.sg ke Internasional
3. Testing Filter di Tj Tapa sesuai konfigurasi untuk limitasi akses

5
3 MOP Activity

3.1 Preparation Activity

No Activity Configuration PIC Duration


1 Instalasi Perangkat RB4011 CPE SF menuju ke Port Smartfren -
 Port05 R4011 mengarahkan ODU Smartfren 09.00 – 09.05
TRIM
 Topologi 5 minutes
ODU SF ---- [Eth5] RB4011 CPE SF [Eth1] ---- [Eth5] IGW
2 Menerima Alokasi IP untuk OKI PP -
IP Public : 66.96.243.226-230
09.06 – 09.08
Subnet Mask : 255.255.255.248 TRIM
2 minutes
Gateway : 66.96.243.225
DNS : 115.178.180.130-131
3 Melakukan Setup IP Smartfren di Laptop -
- IP 66.96.243.226
09.09 – 09.10
- Netmask 255.255.255.248 TRIM
1 minutes
- Gateway 66.96.243.225
Melakukan plug Eth ke CPE RB4011 Smartfren Port01
4 Test Browsing -
 Youtube (Streaming) 09.11 – 09.15
TRIM
 Detik.com , Kompas.com (Lokal) 5 minutes
 Facebook , Twitter (Internasional)
5 Test Bandwidth -
09.16 – 09.20
 Bandwidth Test speedtest.com ke IIX Jakarta TRIM
5 minutes
 Bandwidth Test speedtest.com.sg ke Internasional
6 Melakukan Aktifasi Port di IGW Hotspot
 Port01 RB4011 cross UTP ke Port01 IGW 09.30 – 09.37
TRIM
 Setup IP 66.96.243.228/29 di sisi IGW 7 minutes
 Melakukan tes ping gateway
Total 25 minutes
Table 1. Preparation Activity

6
3.2 Migration Activity

No Activity PIC Remarks


1 Mengarahkann default router IGW Hotspot menuju ke ip 66.96.243.225
Melakukan aktifasi NAT menuju out interface SF dan konfigurasi DNS 115.178.180.130 dan 115.178.180.131 di sisi TRIM Xx minutes
Router.
2 Melakukan Adjustment Bandwidth Baung 50Mb dan Tapa 20Mb TRIM xx minutes
Total 15 minutes
Table 2 Migration Activity

3.3 Verification Activity

No Activity Configuration PIC Remarks


Melakukan Test koneksi di sisi pelanggan
 Youtube (Streaming) TRIM & Smartfren
1 Xx minutes
 Detik.com , Kompas.com (Lokal)
 Facebook , Twitter (Internasional)
Test Bandwidth
TRIM & Smartfren
2  Bandwidth Test speedtest.com ke IIX Jakarta xx minutes
 Bandwidth Test speedtest.com.sg ke Internasional
Testing Filter di Tj Tapa sesuai konfigurasi untuk
3 xx minutes
limitasi akses sosial media.
Total time 10 minutes
Table 3. Verification Activity

3.4 Monitoring Activity

7
No Activity Configuration PIC Remarks
Memantau traffik penggunaan apakah sesuai
kapasitas
TRIM
1  Realtime Traffik dari interface IGW 120 minutes
 Average Traffik dari MRTG (Cacti)
 Durasi monitoring estimasi 2 jam
Total 120 minutes
Table 4. Monitoring Activity

3.5 Rollback Activity

No Activity Configuration PIC Remarks


1 Mengarahkann default router IGW Hotspot menuju ke ip WANXP dan melakukan
TRIM 15 minutes
adjustment Bandwidth kembali kapasitas yang lama.
Total 15 minutes
Table 5. Rollback Activity

1. Form Agreement MOP Document


Design Plan document ver 1.0 approve? Yes / No

8
Any Changes? Yes / No

Detail Changes

Approve by Date :

Company Xxxxxxx

Signature

If the following forms are not returned within seven (7) business days, Xxxxxxxassumes that the following documents are approved unchanged.

9
APPENDIX

1. Appendix for xxxx

10
11

You might also like