RECOMMENDATIONS Based on the test results and discussion, our recommendations are provided for the foundation design and construction. 6.1 Shallow foundations (Isolated with rigid tie beams/strip or raft) ‘The foundation depth may vary according to the architectural requirement. For the area with basement, the foundations can be placed at a minimum depth of 3.0m below the average natural ground level. Excavate the topsoil layer up to a minimum depth of 3.20m below. Further backfilling, if any shall be using selected fill composed of sand and/or granular mixture free from organic matter or other deleterious substances. It shall be placed in layers not exceeding compacted thickness of 250mm with each layer compacted to not less than 95% of the meximum dry density. Place at least one layer of granular road base material of thickness 0.20m up to the foundation formation layer and compacted to not less than 98% of its maximum dry density. An allowable bearing pressure 1.40kg/em* (140kN/m?) was determined considering shallow foundation at a depth specified above. A modulus of sub grade reaction (k) of 16,000kN/m? can be used for the design of raft foundation. ‘The foundations for the area without basement can be placed at a minimum depth of 1.0m below the average natural ground level, Excavate the topsoil layer up to a minimum depth of 1.20m below. Further backfilling, if any shall be using selected fill composed of sand and/or granular mixture free from organic matter or other deleterious substances. It shall be placed in layers not exceeding compacted thickness of 250mm with each layer compacted to not less than 95% of the maximum dry density, Place at least one layer of granular road base material of thickness 0.20m up to the foundation formation layer and compacted to not less than 98% of its maximum, dry density. An allowable bearing pressure 1.20kg/em? (120KN/m*) can be used for the design of foundations. Universal Soil Testing Laboratory shall be contacted to carry out the recommended tests in this report. A site inspection certificate, confirming the bearing pressure and depth of foundation shall be obtained from the laboratory prior to the construction of foundation. 6.2 Foundation Settlements The total settlements under the above pressures are estimated to be within the tolerable limit with minimal allowable differential settlements. Most of the settlements will take place during the construction period. Report No: RGT08.271 Form No FGT-03 Issue No. : 01 Page 7 of 8 Issue Dt. : 01.03.2007 6.3 Excavations & De-watering The excavation works should be carried out in accordance with good construction practice, such as BS 6031: 1981, “Code of Practice for Earthworks” or a similar recognized standard. Where space permits and above the water table, the sides of the excavations would be necessary to be battered and as a guide the CIRIA Report No. 97 “Trenching Practice” recommends a maximum safe temporary slope of 35° to the horizontal. For deep excavations, if any, detailed study of the side slope stability should be carried out by a competent engineer using the findings of investigation When the excavations have to be carried out below the ground water table, dewatering is necessary. Specialist contractors should be consulted in this regard. It is important to make sure that fines are not removed during dewatering as this may cause unpredictable settlements of the surrounding ground and the structures. 7. FOUNDATION CONCRETE The results of the chemical analysis for soil and ground water shows that Class 1 condition should be assumed for the proposed site according to BRE digest 363, "Sulphate and acid resistance of conerete in the ground" (refer appendix D). In view of aggressive environment and severe climatic conditions in the Gulf region, the appropriate recommendations in the digest should be strictly followed. The recommendations of CIRIA special publication 31 should also be taken in to consideration. The publication considers both sulphates and chloride contamination of soils, ground water and aggregates in various exposure conditions and to all forms of concrete including foundation concrete. Alternatively the standard requirements of local municipality should be strictly followed. Good quality dense concrete with low permeability shall be made under careful supervision and good workmanship. In case of shallow foundations bitumen coating may be applied. Also adequate precautions should be taken to avoid corrosion of steel reinforcement due to moisture movement and chloride ingress. Report No: RGTO8-271 Form No.: FGT-03 Page 8 of 8 | DEVELOPMENT REGULATIONS GENERAL NOTES FEGUREMENTS| 85 RESD IN CONANGTION :O-OTSDNES SRST FOR AT [| ana. HTAN! IVANDNA MEHTANLL Say) Guill po al Jiu 4 jap Se Univetoal Sou i “gede Borehole No.:1 tent: Wis Chirag Contacing Lc Borehoe Dep (): 10.0 Project: Proposed B+G+1 Vila ordinates: Not Given Location : Pet No RG.052, Dubal Land, Dubal- UAE Ding Method: igt cable Percussion round Level: Fat Dring Fic: Water Dog Stared on 080872008 Depth of Casing Used (m) 30 pring Comelted on 7108/2008 Inside Di of Caslngim) 60 Gore Sis: Not Aoolcable Gore Barel:Not Appteable Dem ae Sno Gamoen] Stata iva (2) [evel The [aes Tamm fce ime fson [rm fev [Ten [seman] Symbol icant = [OGRE eam, Si, medium araned san osm Sofer|sfe;efs}s fa] 2 ea donee, aitbrown, iy, re ‘orined Sano : 15m Ey [orl alefelal alu] » = Danse, igh brown bow af Te grained SAND wth are gyosum. ES Jerjefalelefe}al] « Em fer|s[sfrfoleful « 4 som ES jerlrfalale a | soc Navy dena, brow, vay ay, ne aed Sano. set | 2 [ase] | am | ae | & | soteme cor | ar [ems] [asso] om | ow | soaten v eS : zon ee Very dense, reaish own, ICONGLOWERATE = | eer | aos] fren] on | m | seen {fer | a fas] ofa] a |e | cons sot zine] a] as fn | on | | sonomn End of Borehole 0.5m ; [a easeemer 7S RE a [Srouns Water evel (n) 8.7 Date & Time of Water Level Measured: 07/08/2008, 0:004M Remares: None Dies Name: Hayedar Rig No. R02 Issue Date ovazomr Page 4044 servancis esta 7 auyill cpoal Jliujcrigi Universal Soil Testing Lab. ga pia p Repon No. RGTOETT Request No. : QGTOB.271 Cient: Ws.Chirag Contacting LLC Project : Proposed B=G+1 Villa Location: Plot No.RG.082, Dubai Land, Dubsi- UAE |Ground Level: Flet Driting Started on : 07/08/2008 Joriting Completed on: 07/08/2008 [Core Bia: Not Applicable Borehole Log Borehole No. :2 Borehole Depth Coordinates: N Dring Method Dring Fluid: Water Deptt of Casing Inside Dia of Casing(mm) : 150 Core Barrel: Not Appicabie. (om): 100 fot Given Light cable Percussion Used (m):3.0 Seree| Sea eaneapE a Saeen| Sree = Stata Descipion WPS trom [ries [rte [ism [rsom [rims |wvanes [roe [sce [Rao] Symbot nt = == [lghtbroa, sy rete medium ares {sano — ot} sfe}efe| > * dion dense, ahtbrown, Sy re ‘arenes san | 15m ~ s)epe) a *: |Mecium dense and dense, light brown to brew sty, ne rained SAND wi re sven sr}efelrfe} x » : ES jerle]s| ef] » . ‘ 3.0m serfs fs |e] a] | so | sarin Way dase, Bown, very aye ned SAN EE for] + [uso] 2] | ce | a | sont ea v 7.0m cr] |u| a fave] 8 ten > an @ [oy donee roi bow, 3 oe © CONGLOMERATE prres ES fer 12s} a1 | sea0] sors nace Sees ser | |] = [ro] a sane = Beee Sees — End of Borehole 10.5m |G:ound Water Level (m) :6.7 Remarks : None [rem na :For-1 nee 0 RS aga Se Date & Time of Water Level Measured : 08/08/2008, 08:00AM Driller Name : Hayedar lene Dae 09082007 Rig No: RM-02 Page: tat

You might also like