Professional Documents
Culture Documents
Click on
‘Open (Ctrl+O)’
To open file
‘Start_Basement_footing’.
02 Basement Walls
Create Basement Walls
3 5 6
03 Footings
Create Footings
A
3 3 4
03 Footings
Edit Footings
3
03 Footings
Edit Footings
3 3 3 4
03 Footings
Create Slab
Preparation
1
1. Select [Body > Line].
2. Click [A, B] > Right-Click >
Press [Space bar] > Click [A,
C] > Right-Click > Press C
[Space Bar] > Click [D, B] > B
Right-Click > Press [Space
Bar] > Click [D, E] > Right-Click. A
D
E
03 Footings
Create Slab
Create Slab
1
1. Select [Member > Slab].
2. Go to [Top] view].
3. Click [By Select] > Select all
lines between mat and strip
footings.
4. Select Member Set [Basement].
5. Select Thickness [T200
(C30/37)] > Analysis Type
[Plate Out-In].
6. Click [Apply] > Press [Esc] to
finish.
4 5 6
03 Footings
Create Slab
Edit Slab
4
1. Select Filter [Member > Slab].
2. Select Slabs overlapped with 1
isolated footings.
3. Press [Delete].
4. Select [Member > Merge > 2D
Merge].
2
5. Select three Slabs [1, 2, 3] > 1
Click [Apply] > Press [Esc] to
finish.
3
03 Footings
Create Piles
5
Create Piles
1
6
03 Footings
Create Piles
Create Piles
1
2
03 Footings
Create Piles
Create Piles
1
1. Select [Pile Array > Line].
2. Input Spacing(Dia) [6.8].
3. Click [A, B] > Press [Esc] > C
Press [Space Bar] > Click [C, D
A] > Pres [Esc] > Press [Space
Bar] > Click [C, D] > Press [Esc]
to finish.
A
B
2
03 Footings
Create Piles
Create Piles
5
1. Select [Pile Array > Area]. 1
2. Select Mat Footing.
3. Input X-Spa.(Día) [6.8] > Y-
Spa.(Día) [6.8] > Edge(Día) [2].
4. Click [Apply] > Press [Esc] to
finish.
5. Click [Apply Pile Array].
3 4
04 Loads
Earth Pressure
2
06 Design
Design Settings
3
06 Design
Define Load Combinations
2 4
3
06 Design
Design Groups
2
06 Design
Member Parameters
5
06 Design
Assign Reinforcement
4
06 Design
Assign Reinforcement
3
06 Design
Assign Reinforcement
4
06 Design
Define Design Case
6
07 Design Results
Check Design Results
Design Results
2
1. Design Result Tree Menu >
Select [Design Results > Total
Status].
2. Select [Results > Design
Report]. 1
3. Select the Mat Footing > Click
[OK] to open Summary Design
Report of Mat Footing.
3
07 Design Results
Check Design Results
5
10 Additional Rebar
Apply Additional Rebar
Rebar].
4. Select [Bot. local x-dir.] > Define
5
Additional Rebar [P12]@ [0.2]m.
5. Click [Add]. D
6. Use [By Draw] tool > Click [A, B,
A C 8
C, D]
7. Click [Apply]. B
8. Click [Add] > Click [Close]. 8
7
11 Review Drawings
Define Drawing Set
4
11 Review Drawings
Generate Drawings
Generate Drawings
1
11 Review Drawings
Generate Drawings
Generate Drawings
2
1. Select [Generate Drawing >
Generate Structural Plan].
2. Select [Pile Layout plan] > Click
[Pile Arrangement (EL -4.20)]. 3
3. Click [OK] > Click on the
workspace > Confirm [Structural
Plan].
1
11 Review Drawings
Generate Drawings
Generate Drawings
2
1. Select [Generate Drawing >
Generate Structural Plan].
2. Select [Drawing of Slab
Reinforcement] > Click 3
[Rebar Arrangement Plan(EL -
4.20)].
3. Click [OK] > Click on the
workspace > Confirm [Structural
Plan]. 1
11 Review Drawings
Generate Drawings
Generate Section B C
Generate Drawings
2
1. Select [Generate Rebar
Arrangement].
2. Select [Basement Wall] > Click
[Wall Longitudinal Rebar 3
Section-1].
3. Click [OK] > Click on the
workspace > Confirm [Structural
Plan].
1
Thank you.