OBJECTIVE An enthusiastic & high energy driven professional targeting for challenging
assignments in Constructions project management, Multi-storey Construction and
Infrastructure Industry with a reputed organization preferably in Gulf Countries
WORK EXPERIENCE
IT SKILLS
Yashaswi Engineering Consultant Pvt. Ltd. Feb’ 2021 – Present
Oracle Primavera P6- PPM Location: India | Bangalore
& EPPM Projects- Multistory Construction, Steel Structure and Infrastructure
Planning Engineer
Microsoft Project (MSP) Software- Working with Oracle Primavera P6- PPM
Key Result Areas:
MS Office
Prepare a detailed program of works under contract key dates.
Develop work breakdown structure and define work packages and coding of the
AutoCAD scheduled activity
Identify and manage all interfaces, milestones, and major activities, the
E Survey Softest relationship between activities, and create budget estimates
Coordinating in preparation of drawing submission schedule and following the
delivery material as per the schedule
Prepare updates of actual progress at sites in the project plan
Prepares weekly/ monthly/ reports of progress S-Curve, manpower histogram,
and equipment histogram
Project cost estimation using research and software to establish equipment,
material, and labor need
Identify, analyze, and monitor schedule deviation for assigned discipline or
special
CORE COMPETENCIES Coordinating with various disciplines and attending progress meetings
PREVIOUS EXPERIENCE
Site Administration
Project Planning & Energy Technical Services WLL Dec’ 2019 to Dec’ 2020
Execution Location: Qatar | Doha
Projects- Oil and Gas, Multistory Construction and Infrastructure
Stakeholder
Planning Engineer
Management
Software- Working with Oracle Primavera P6- PPM
Budgeting & Cost Key Result Areas:
Control
Project planning, baseline scheduling, monitoring, tracking, and reporting
Manpower activities. Analyses and reports project economics including costs, operational
Management budgets, staffing requirements, resources, and risk
Contracts Management Prepare the project-wide master program reflecting the project phasing and
packaging strategy and including engineering procurement construction
Risk Management & handing over the project
Mitigation Track the delivery of long-lead materials into stage-wise requirements at the
site, highlighting the priority of materials to the Project Manager, as per the
Quality Management agreed schedule
Establish the delay analysis by capturing the delay analysis, notification and EOT
Value Engineering claim accurately in line with the project requirements
Prepare the Look-ahead schedules, KPI tracker, and the progress updates based
on the QC approval
EVM Analysis
Setup presentation of the Progress updates, including Schematic layout
illustration
Collate and analyse reports from the site team to ensure that delays,
CERTIFICATIONS stoppages, constraints, and deviations are being recorded in line with the
project requirements
Monitor and analyse Earned Value and associated Key Performance Indicator
Master Diploma in Project
Planning and Management BCIM Engineering Pvt. Ltd. Jan’ 2018 to Dec’ 2019
from Synergy School of Location: India | Bangalore
Business Skills Projects- Multistory Construction
AutoCAD Essentials Certificate Planning Engineer
from Kruthi Pvt. Ltd. Software- Working with Oracle Primavera P6- PPM
Key Result Areas:
E Survey CAD/ E Survey Lisp
from E Survey Section Pvt. Ltd. Track and monitor major equipment
Participate in project meetings and discussions with the clients as required
National Certificate in Modular
Assists in preparing work program, cash flow, manpower histogram, S- Curve
Employable Skill from Kruthi
Manpower and equipment deployment chart
Pvt. Ltd.
Develop variance analysis and responsibility float consumption
Construction Management Reflect change order scope on schedule and perform variance analysis
from Prayojana Pvt. Ltd. Link and modify linkages of proper sequence in planning software
Track and monitor project manpower levels to include direct, indirect,
support, and idle
Assign cost components and cost types to create graphs to illustrate actual
performance and project status
Package the project into the scope of work
Develop levels1 to 7 of the schedules
Prepare weekly/monthly look ahead plan, progress schedule, recovery plan,
and accelerate plans
M/s Karnataka Test House Pvt. Ltd. Jan’ 2013 to May’ 2014
Location- India | Bangalore
Projects- Government projects
Soil and Material Engineer
Key Result Areas:
Collected the soil samples from the project intended site using bores and test
pits
Conducted laboratory testing performed as per the relevant part of IS 2720
Performed geotechnical analysis and study to assess construction sites based
on substructure conditions revealed from field investigation
PERSONAL DETAILS
Driving License : KA04 20120016334 Marital Status : Marred
th
Date of Birth : 18 July 1985 No. of Dependents : 2
Nationality : Indian Passport No. : P9016302; valid till 2027
Visa Status : Work Visa/ Employment Visa Languages known : English, Hindi, Kannada, Telugu, Tamil
Address : 14, 2nd Cross, CP layout, Devinagar, RMV 2nd Stage, Bengaluru -560094, Karnataka, India