DAILY CHECK LIST OF CO2 SYSTEM
Equipment ID : Location:
Equipment Name : Date:
REF NO : Time:
Check list No.:
ACTUAL
S. NO. CHECKS EQUIPMENTS SHOULD BE REMARK
SHIFT-A SHIFT-B SHIFT-C
PANEL OF ACHENBACH MILL
1 OPERATION GREEN LED ON
2 BATTERY MODE MAIN/RESERVE
3 SYSTEM MODE AUTO/MANUAL
4 FAULT LED OFF
5 SHUT-OFF LED OFF
6 PRE-ALARM LED OFF
7 FIRE LED OFF
8 ANY HEAT DETECTOR LED GLOWING OFF
9 ANY OTHER LED GLOWING OFF
10 PANEL DOORS LOCKED
CO2 ROOM
1 DIRECTIONAL VALVE LIMIT SWITCH POSITION
2 LIMIT SWITCH OF PILOT CYLINDER MAIN/RESERVE LIFTED
3 WEIGHT LIMIT SWITCH OF PILOT CYLINDER LIFTED
4 PILOT CYLINDER SAFITY PIN FIXED YES
5 BLOCKING DEVICE POSITION MAIN/RESERVE (MILL AREA) AUTO/MANUAL/INTERMEDIATE
6 BLOCKING DEVICE POSITION MAIN/RESERVE (CELLAR AREA) AUTO/MANUAL/INTERMEDIATE
7 BLOCKING DEVICE POSITION MAIN/RESERVE (FILTER AREA) AUTO/MANUAL/INTERMEDIATE
8 SELECTION OF CO2 BANK MAIN / RESERVE
9 STATUS OF RESERVE BANK EMPTY / FILLED
10 PHYSICAL CONDITION OF ALL THE MANUAL CO2 DISCHARGE PUSH BUTTON STATION INTACT
SHIFT TIME SIGNATURE OF SHIFT INCHARGE
A 07:00 to 15:00
B 14:00 to 22:00
C 22:00 to 07:00
Prepared By: Reviewed By: