SHYAM SEL AND POWER LIMITED

Pakuria, Howrah
Engineering Department
DAILY CHECK LIST OF CO2 SYSTEM
Equipment ID : Location:
Equipment Name : Date:
REF NO : Time:
Check list No.:
ACTUAL
S. NO. CHECKS EQUIPMENTS SHOULD BE REMARK
SHIFT-A SHIFT-B SHIFT-C
PANEL OF ACHENBACH MILL
1 OPERATION GREEN LED ON    
2 BATTERY MODE MAIN/RESERVE    
3 SYSTEM MODE AUTO/MANUAL    
4 FAULT LED OFF    
5 SHUT-OFF LED OFF    
6 PRE-ALARM LED OFF    
7 FIRE LED OFF    
8 ANY HEAT DETECTOR LED GLOWING OFF    
9 ANY OTHER LED GLOWING OFF    
10 PANEL DOORS LOCKED
CO2 ROOM
1 DIRECTIONAL VALVE LIMIT SWITCH POSITION    
2 LIMIT SWITCH OF PILOT CYLINDER MAIN/RESERVE LIFTED    
3 WEIGHT LIMIT SWITCH OF PILOT CYLINDER LIFTED    
4 PILOT CYLINDER SAFITY PIN FIXED YES    
5 BLOCKING DEVICE POSITION MAIN/RESERVE (MILL AREA) AUTO/MANUAL/INTERMEDIATE    
6 BLOCKING DEVICE POSITION MAIN/RESERVE (CELLAR AREA) AUTO/MANUAL/INTERMEDIATE    
7 BLOCKING DEVICE POSITION MAIN/RESERVE (FILTER AREA) AUTO/MANUAL/INTERMEDIATE    
8 SELECTION OF CO2 BANK MAIN / RESERVE    
9 STATUS OF RESERVE BANK EMPTY / FILLED    
10 PHYSICAL CONDITION OF ALL THE MANUAL CO2 DISCHARGE PUSH BUTTON STATION INTACT    
SHIFT TIME SIGNATURE OF SHIFT INCHARGE
A 07:00 to 15:00
B 14:00 to 22:00
C 22:00 to 07:00
Prepared By: Reviewed By: