You are on page 1of 2

Pre Commissioning Check List For BSSC

Customer Name Utility Projects & Services P Ltd Location Pedakakani - Guntur
Project Name Sri Sringeri Sharada Rajeshwari Hospital BSL office VIJAYAWADA
Installation Engineer Name Marley Ferdin A Installation Engineer Contact 9849560900
Unit Model No LCWX1-0424FI Unit Serial No
Compressor Model No. Screw Compressor Compressor Serial No.
Refrigerant type R134a Requested Date of Commissioning 20/6/2018

General Electrical and Controls Other Checks

Chiller application (Comfort, process etc) Comfort Power Wiring ok YES 3 Way valve for Condenser water line Installed (Yes/No) NO
Chiller supplied with BMS connectivity(RS485 Serial Card
Chiller location (Basement, terrace etc.) Roof Provided with controller ) YES Make up water line and valve provided (Yes/No) YES

Chiller Mounted on a level Surface (Yes/No) YES Check wiring of power panel ( OK / not OK) OK Manually rotate cooling tower fan blades (Yes/No) YES

Refrigerant charged and leak free (Yes/No) YES Earthing is proper (should not be painted) ( Yes / No) YES Cooling tower fan blades rotation is ok (Yes/No) YES

Check earth leakage current in power panel between Neutral Calibrated Pressure Gauges Installed
No visible equipment damage (Yes/No) YES and Earth OK (with psyphon and valve) (Yes/No) YES

Insulation in good condition (Yes/No) YES Power panel Main incoming cable Material Copper/ Aluminium ALUMINIUM Minimum Load is available for startup (Yes/No) YES
Drain and Purge Valve installed and
Clearance as per requirement (Yes/No) YES Power panel Main incoming cable Routing in air/duct CABLE TRAY operational (Yes/No) YES

Power panel Main incoming cable Size All Sensors installed in


All piping installed and supported (Yes/No) YES thermowell with thermal paste (Yes/No) YES
in Sq. mm

Foundation checked, pads provided (Yes/No) YES YES Balancing valve is provided in cooler and condenser water line.
Oil Heater Energised ( Yes/ No) (Yes/No) YES

Chilled Water Circuit Condenser Water Circuit Design Specification

Piping is insulated to cooler (Yes/No) YES Piping is complete to the condenser (Yes/No) YES Design Set Point in ° F
System cleaned and Flusshed (Yes/No) YES System cleaned and Flushed (Yes/No) YES Checked chiller mounted on Spring Isolators YES
Water system pressure checked and No leak (Yes/No) YES Water System pressure checked and No leak (Yes/No) YES Confirm adequate space for operation and maintenance YES
Chilled water system is vented (Yes/No) YES Flow switch Installed and Functional (Yes/No) YES Standing Pressure checked by Pressure Gauge
Flow switch Installed and Functional (Yes/No) YES Strainers cleaned after flush (Yes/No) YES Visible leaks or Damages on Chiller NO
Strainers cleaned after flush (Yes/No) YES Service clearance as per requirement (Yes/No) YES Oil level in sight glass 0/ 0.5/.75/Full HALF
Service clearance as per requirement (Yes/No) YES Water pump rotation checked (Yes/No) YES Chilled water In/Out pressure Difference
Water pump rotation checked (Yes/No) YES All water line valves are open (Yes/No) YES Condenser water IN/OUT pressure difference
All water line valves are open (Yes/No) YES Pump head (recommended) 22 MTR
Pump head (recommended) 15 mtr Pump head (Actual)
Pump head (Actual) Pump Flow rate (recommended) 4861LPM
Pump Flow rate (recommended) 4012 LPM Pump Flow rate (Actual)
Pump Flow rate (Actual) YES
Pressure gauges installed at IN and OUT of Pump (Yes/No)
Pressure gauges installed at IN and OUT of Pump YES

1
Is there primary and secondary YES
system for chilled water line
If Yes then ensure YES
Installation of decoupler line

Other Site or Commissioning Note

Signature of the Engineer Signature Date