Example 3.8. Draw the network for a project having four
activities Labelled A, B, CO weul D, and related as below:
(@ Aetinity A and cetivity B can be done concurrently.
id) Activity A is the immediate predecessor of activity C, and
20 is the relation between B and D.
(éié) Accomplishment of Cand D marks the completion of the
project.
FINAL DIAGRAM
Example 3.7. Draw the network of @ project having seven
activities, Activities A, Band Crun concurrently. Activities predeces-
sor relationships are as follows :
Activity lmmediate Predecessor
D A
E B
F Cc
Activity G is the last operation of the project, and is also
immediate successor to D, E and F.
(0) Final Net Work
Example 3.8. Draw a network diagram for the project having
9 activities, with the following inter-relationships :
@ C follows D but precedes F.
(id) C follows B but precedes H.
Git) G follows F but precedes I.
(iv) E follows A but precedes I.
(w) D follows A.
wi) H and J terminate at the same time
(vii) A and B start at the same time.
cExample 3.9. A project consists of six activities (jobs) desig-
nated from A to F, with the following relationships
W) Ais the first job to be performed.
Gi) Band C can be done concurrently, and must follow A.
121) B muse precede D.
(iv) E muse succoed C, but it cannot start until B is complete.
lu) The last operation F is depenclent on the completion of both.
Draw the network diagram.
{9} Final Network
Example 3.10. The maintenance projeet of a building con
sists of ten jobs. The predecessor relationships are identified by tlesir
node numbers, as indicated below :
es
| A r 12) F (4,5)
| 4 3) & >
a 2 " a8
& ee
3 5 68
(hy Final Natwort
Example 3.11. A project plan consisting of ten events have
predecessor relationships as under :
Byer Immediate Been! | Pormediate
Prececensor Prednorssor|
| 6 as
7 a4 |
| 8 BT
2
0
7
5,6,5,9
eae
te tors |
Draw the network diagram for the project plan.
(0 Final Network