Professional Documents
Culture Documents
Submission
Sl. No. Description Rev JKIL LETTER Status GC LETTER GC Response (Date) Remarks
(Date)
R1
2. Geotechnical Interpretative Report
R2 KIL/ML9/SCSIC/SUB/1552 13-10-2020 Comments Received SCGC59/L7A/JK/GEOT/1788 27-10-2020
P11 (pile cap, pier) JKIL2522 dated 25.02.21 R0 GC 3233 dated 22.03.21 JKIL 2758 dated 25.03.2020 GC 3653 dated 03.05.20 Rev A
P12 (pile ) JKIL1623 dated 27.10.20 R0 GC 1972 dated 19.11.20 JKIL 1778 dated 26.11.2020 GC 2054 dated 30.11.20 Rev A
P12 (pile cap pier) JKIL2522 dated 25.02.21 R0 GC 3234 dated 22.03.21 JKIL 2924 dated 16.04.2021 GC 3537 dated 21.04.21 Rev A
1 P13 JKIL1976 dated 18.12.20 R0 GC 2364 dated 28.12.20 JKIL 2155 dated 09.01.2021 GC 2577 dated 16.01.21 Rev A
P14 JKIL1824 dated 03.12.20 R0 GC 2189 dated 14.12.20 JKIL 1977 dated 18.12.2020 GC 2300 dated 22.12.20 Rev A
P14 (Pile cap & Pier) JKIL4675 dated 30.12.21 R0 GC 5933 dated 08.01.22 JKIL 4762 dated 12.01.2022 GC 6012 dated 14.01.22 Rev B
P15 (pile) JKIL3088 dated 10.05.21 R0 GC 4069 dated 08.06.21 JKIL 4781 1dated 13.01.2021
P15(pile) JKIL4987 dated 11.02.22 R2 GC 6372 dated 21.02.22 JKIL 6372 1dated 21.02.2022 GC 6571 dated 14.03.22 Rev B
P15 pile cap & pier JKIL4987 dated 11.02.22 R1 GC 6372 dated 21.02.22 JKIL 6372 1dated 21.02.2022 GC 6571 dated 14.03.22 Rev B
P16 JKIL3105 dated 12.05.21 R0 GC 4020 dated 08.06.21 JKIL 3415 dated 22.06.2021 GC4368 dated 19.07.21 RevA
P16 JKIL4379 dated 22.11.21 R1 GC 5606 dated 07.12.21 JKIL 4600 dated 18.12.2021 GC5813 dated 28.12.21 RevB
P17 JKIL3442 dated 24.06.21 R0 GC 4261 dated 06.07.21 JKIL 3541 dated 08.07.2021 GC4335 dated 14.07.21 RevA
P18 JKIL3443 dated 24.06.21 R0 GC 4271 dated 07.07.21 JKIL 3555 dated 09.07.2021 GC4337 dated 14.07.21 RevA
P19 JKIL3490 dated 01.07.21 R0 GC 5734 dated 17.12.21 JKIL 4655 dated 27.12.2021 GC5862 dated 31.12.21 RevA
P20 JKIL3468 dated 28.06.21 R0 GC 4260 dated 06.07.21 JKIL 3542 dated 08.07.2021 GC4398 dated 21.07.21 RevA
P21 JKIL3476 dated 29.06.21 R0 GC 4273 dated 07.07.21 JKIL 3556 dated 09.07.2021 GC4336 dated 14.07.21 RevA
P22 JKIL3485 dated 01.07.21 R0 GC 4272 dated 08.07.21 JKIL 5164 dated10.03.2022 GC6572 dated 14.03.22 RevA
P23 JKIL4529 dated 11.12.21 R0 GC 5733 dated 17.12.21 JKIL 4605 dated 20.12.2021 GC5812 dated 28.12.21 RevA
P02 to P08 & P17 to P18 JKIL4353 dated 18.11.21 R0 GC 5478 dated 25.11.21 JKIL 4654 dated 25.12.2021 GC5831 dated 29.12.21 RevA
PIER CAP
P9 & P19 JKIL4778 dated 13.01.22 R0 GC 6299 dated 11.02.22 JKIL5083 dated 02.03.2022 GC5831 dated 12.03.22 RevA
2
P10 to P15 JKIL 4747 dated 07.01.22 GC 6038 dated 18.01.22 JKIL 4827 dated 20.01.2022 GC6098 dated 22.01.22 RevA
P16, P20 & P23 Not submitted
P21 & P22 JKIL 5009 dated 14.02.22 GC 6795 dated 9.04.22
GIRDER
I
P22 TO P23 Not submitted
U Girder (less than
4 P09 T0 P16 Not submitted
300 Radius )
5 JKIL 4782 dated 13.01.22 GC 6109 dated 25.01.22 JKIL 5014 dated 17.02.2022 GC6416 dated 24.02.22 RA
6 Elestomeric Bearing JKIL 4777dated 13.01.22 GC 6082 dated 21.01.22 JKIL 4920 dated03.02.2022 GC6259 dated 08.02.22 RA
7 Wedge plate 08.02.22 Awaited
Design status
Tunnel
Sl no location JKIl submission Rev GC Response GFC Submission GFC approval Rev
JKIL766 dated GC 0729 dated
R0
17.05.2020 11.06.2020
1 Tunnel segments
JKIL3046 dated GC 4078 dated JKIL4004 dated GC 5295 dated
R1 Rev A
04.05.2021 15.06.2021 22.09.2021 08.11.2021
Instrumentation & GC 6590 dated
2 R0
Monitoring plan 16.03.2022
Cross passages
3 (Primary support JKIL 4663 dated R0 GC 6280 dated
design ) 27-12-2021 10.02.2022
Aiport colony Design status
Pile foundation
SL Location JKIL submission Rev GC response GFC Submssion Rev GFC approval Rev
JKIL 4939 dated GC 6537 dated JKIL 5185 dated GC 6687 dated
1 GRID 1 R0 RA
11.02.2022 10.03.2022 15.03.2022 29-03-2022
JKIL 4886 dated GC 6535 dated JKIL 5185 dated GC 6688 dated
2 GRID 2 R0 RA
28-01-2022 10.03.2022 15.03.2022 29-03-2022
JKIL 4921 dated GC 6536 dated JKIL 5185 dated GC 6689 dated
3 GRID 3 R0 RA
03-02-2022 10.03.2022 15.03.2022 29-03-2022
JKIL 5013 dated GC 6735 dated 05- JKIL 5316 dated GC 6868 dated
4 GRID 4 RA
15.02.2022 04-2022 08.04.2022 16.04.2022
JKIL 5774 dated GC 7541 dated 20- JKIL 5811 dated
R1 Rev.B
14.06.2022 06-2022 21.06.2022
JKIL 4919 dated GC 6769 dated 07-
5 GRID 5 Rev.R0 Rev.A
03-02-2022 04-2022
JKIL 5674 dated 31-05-
Rev.R1
2022
JKIL 4930 dated GC 6773 dated
6 GRID 6 Rev.R0
03-02-2022 16.02.2022
JKIL 5563 dated 14-05- GC 7227 dated JKIL 5616 dated 23-05-
Rev.R1 Rev.A
2022 21.05.2022 2022
JKIL 4979 DATED GC 7388 dated 06- JKIL 5860 dated 28-06-
7 GRID 7 R0 Rev.A
10.02.22 06-22 2022
JKIL 5711 Dated
Rev.1
14.06.22
JKIL 4780 dated GC 6004 dated JKIL 4793 dated GC 6019 dated
8 GRID 8 Rev.2 RB
13-01-2022 08.01.2022 14.01.2022 17-01-2022
JKIL 4790 dated GC 6063 dated 20- JKIL 4830 dated 22-01- GC 6133 dated
9 GRID 9 R1 RA
14-01-2022 01-2022 2022 27-01-2022
JKIL 4790 dated GC 6063 dated 20- JKIL 4830 dated 22-01- GC 6133 dated
10 GRID 10 R1 RA
14-01-2022 01-2022 2021 27-01-2022
JKIL 4789 dated GC 6097 dated 22- JKIL 4863 dated 25-01- GC 6243 dated
11 GRID 11 R0 RA
14-01-2022 01-2022 2022 07-02-2022
JKIL 4796 dated GC 6081 dated 21- JKIL 4884 dated 25-01- GC 6246 dated
12 GRID 12 RA
15-01-2022 01-2022 2022 07-02-2022
JKIL 4918 dated GC 6279 dated 10-
FRAMING 01-02-2022 02-2022
13
PLAN JKIL 5253 dated 30-03- JKIL 5742 dated 09-06- GC 7577 dated
R3 RA
2022 2022 23-06-2022
Pilecap
JKIL 5588 dated 18-05-
1 GRID 1
2022
JKIL 5640 dated 26-05-
2 GRID 2 R0
22
JKIL 5640 dated 26-05-
3 GRID 3 R0
23
JKIL 5639 dated 26-05-
4 GRID 4
22
JKIL 5590 dated 26-05-
5 GRID 5
22
JKIL 5642 dated
6 GRID 6
26-05-22
JKIL 5688 dated
7 GRID 7 Rev.R0
04.06.2022
JKIL 4972 dated GC 7107 dated 9- GC 7576 dated
8 GRID 8 Rev.R0 JKIL 5776 dated 17.06.22 Rev.A Rev.A
08.02.22 05-2022 23-06-2022
JKIL 4977 Dated GC 7763 dated 15- JKIL 6057 dated 29-7-
9 GRID 9 Rev.R0 Rev.A
09.02.22 07-2022 2022
JKIL 4985 dated GC 7769 dated 15- JKIL6058 DATED 29-7-
10 GRID 10 Rev.R0 Rev.A
01.06.22 07-2022 2022
JKIL 4995 Dated GC 7769 dated 15- JKIL6058 DATED 29-7-
11 GRID 11 Rev.R0 Rev.A
01.06.22 07-2023 2022
JKIL 5011 DATED GC 7106 dated 15-
12 GRID 12 Rev.R0
14.02.22 07-2022
JKIL 5881 DATED GC 7770 dated 15-
Rev.R0
02.07.2022 07-2022
PIER
JKIL 5588 dated 26-05-
1 GRID 1 R0
22
JKIL 5640 DATED
2 GRID 2 R0
26.05.22
JKIL 5640 DATED
3 GRID 3 R0
26.05.22
JKIL 5684 DATED
4 GRID 4 R0
02.06.2022
JKIL 5684 DATED
5 GRID 5 R0
02.06.2022
JKIL 5684 DATED
6 GRID 6 R0
02.06.2022
JKIL 5879 DATED 28-06-
7 GRID 7 R0
2022
JKIL 5677 DATED GC 7653 DATED 02- JKIL 5920 DATED 07-07-
8 GRID 8 R0
01.06.2022 08-2022 2022
JKIL 5677 DATED GC 7653 DATED 02- JKIL 6057 dated 29-7-
9 GRID 9 R0 A
01.06.2022 08-2023 2022
JKIL 5678 DATED 01-06- GC 7769 DATED 15- JKIL6058 DATED 29-7-
10 GRID 10 R0 A
2022 07-2022 2022
JKIL 5678 DATED 01-06- GC 7769 DATED 15- JKIL6058 DATED 29-7-
11 GRID 11 R0 A
2022 07-2022 2022
JKIL 5881 DATED 29-06- GC 7770 dated 15-
12 GRID 12 R0
2022 07-2022
15 GRID 15
16 GRID 16
17 GRID 17
18 GRID 18
19 GRID 19
20 GRID 20
Design status
Cut & Cover and Ramp
Sl no location JKIl submission Rev GC Response GFC Submission GFC approval Rev
JKIL 4748 dated GC 6064 dated
R0
08-01-2022 20.01.2022
JKIL 4797 dated
R1 By E Mail
31-01-2022
JKIL 4973 dated GC 6292 dated
1 Elevated Ramp R2
08-02-2022 10.2.2022
JKIL 5010 dated GC 6379 dated JKIL 5080 dated GC 6554 dated
R3 RA
14-02-2022 22.2.2022 24-02-2022 12.3.2022
JKIL 5620 dated 27-05- GC 7421 dated JKIL 5755 dated GC 7486 dated 15-06-
R4 Rev.B
2022 09.06.2022 13-06-2022 2022
JKIL 1687 dated GC 2252 dated
R0
07-11-2020 17.12.2020
JKIL 4187 dated GC 5660 dated
R2
UG Ramp (permanent 29-10-2021 10.12.2021
2
structure) JKIL 5238 dated
R2
25-03-2022
JKIL 4888 dated GC 6474 dated JKIL5920 dated 07-07-
R1
28-01-2022 03.03.2022 2022
JKIL 4895 dated GC 6442 dated
R1
28-01-2022 26.02.2022
UG Ramp (Temporary JKIL 5188 dated
2A R2
structure) 25-03-2022
JKIL 5736 dated GC 7562 dated JKIL 6060 dated
R3 DD
09-06-2022 22.06.2022 02-08-2022 REV.A
JKIL 1183 dated GC1369 dated
R0 (PD)
04-08-2020 08.09.2020
JKIL 3414 dated GC 4338 dated
R1 (PD)
24-06-2021 14.07.2021
CUT & COVER JKIL 3833 dated GC 4684 dated
3 R0 (DD)
(Permanent Structure) 24-08-2021 21.09.2021
JKIL 4859 dated GC 6553 dated
R1 (DD)
28-01-2022 12.03.2022
JKIL 5708 dated
R3 (DD)
08-06-2022
JKIL 3900 dated GC 5052 dated
08-09-2021 R1 11.10.2021
JKIL 4988 dated GC 5608 dated
R2
CUT & COVER 29-10-2021 07.12.2021
3A JKIL 4761 dated GC 6634 dated
(Temporary Structure) R03
12-01-2022 22.03.2022
JKIL 5565 dated GC 7331 dated 31-05- JKIL 5739 dated GC 7488 dated 15-06-
R4 & R5 Rev.A
16-05-2022 2022 09-06-2022 2022
Design status
UG Station
Sl no location JKIl submission Rev GC Response GFC Submission GFC approval Rev
GC 6025
Secant pile design & JKIL4616 dated GC 5849 dated JKIL 4735 dated dated
1 R2 RA
drawings (Zone A) 21.12.2021 30.12.2021 07.01.2022 17.01.202
2
Secant pile design & JKIL 5735 dated For
2
drawings (Zone A1) 10.06.2022 reference
GC 6471
Secant pile design & JKIL4937 dated GC 6330 dated JKIL 5043 dated dated
3 R0 RA
drawings (Zone B) 05.02.2022 16.02.2022 18.02.2022 03.03.202
2