Date: January 25, 2022

Main Plant Operational Procedure: Circulating Water NaCIO Dosing


1. System Description: The CW NaCIO Dosing System unloads sodium hypochlorite from the
truck or other source to one of ___ NaCIO Storage Tanks via one of the two unloading pump.

A. Three B. One C. Five D. Six


ANSWER: D. Six

2. System Description: The NaCIO is then sent to one of ___ NaCIO Continuous Dosing
Pumps.

A. Two B. Three C. Four D. Five


ANSWER: C. Four

3. System Description: The NaCIO is then sent to one of ___ NaCIO Shock Dosing Pumps.

A. Two B. Three C. Four D. Five


ANSWER: B. Three

4. System Description: The system is also equipped with an Accident Water Pond with ___
pump to send water to either the NaCIO Storag Tanks or straight to the Unit 1-3 Circulating
Water fore bays.

A. Two B. Three C. Four D. One


ANSWER: A. Two

5. Purpose: What is NaCIO?

A. Chlorine B. Sodium Chloride C. Sodium Hypochlorite D. Sodium Chlorite


ANSWER: C. Sodium Hypochlorite
6. Valve Alignment Checklist: Unload NaCIO Pump 1 & 2 suction / discharge is equipped
with ___ type of isolation valves.

A. Gate B. Butterfly C. Globe D. Ball


ANSWER: D. Ball
7. Valve Alignment Checklist: NaCIO storage tank 1,2,3,4,5 & 6 - inlet, outlet and drain is
equipped with ___ type of isolation valves.

A. Gate B. Butterfly C. Globe D. Ball


ANSWER: D. Ball

8. Valve Alignment Checklist: NaCIO dosing and shock dosing pump suction and discharge is
equipped with ___ type of isolation valves.

B. Gate B. Butterfly C. Globe D. Ball


ANSWER: D. Ball

9. Electrical Alignment Checklist: Required position of power supply breaker for NaCIO
Unloading pump A (YOPBN11AP001) / B (YOPBN12AP001).

A. OPEN B. CLOSE C. TRIP D. N/A


ANSWER: B. CLOSE

10. Electrical Alignment Checklist: Required position of power supply breaker for NaCIO
Accident water pump A (YOPBN61AP001) / B (YOPBN62AP001).

B. OPEN B. CLOSE C. TRIP D. N/A


ANSWER: B. CLOSE

Prepared by: Jonas S. Gabac


Checked by: Lourd Martin Agbay