You are on page 1of 7

x

x JTB PROJECT

x TP CRITICAL PATH

x
x P/R NO SUB SISTEM CRITICAL PATH CRITICAL PATH PURPOSE
CATEGORY

x
x 1A IA-PA CRITICAL PATH 1ST FIRING AI AP -SAT1 (MRT)

x 1B IA-PA CRITICAL PATH 1ST FIRING AI AP -SAT2 (1ST FIRING)

x
x 2A N2 CRITICAL PATH 1ST FIRING N2-SAT1 (MRT)

x 2B N2 CRITICAL PATH 1ST FIRING N2-SAT2 (1ST FIRING)

x 2C N2 NO N/A NON SAT

x
x 3A1 WATER - FW-SAT1 CRITICAL PATH 1ST FIRING SAT TEMPORARY FW PUMP
(TEMPORARY)
x 3A2 WATER - FW-SAT2 NO N/A SAT PERMANENT FW PUMP
(PERMANENT)
x
x 3B1 WATER - WTP-SAT1 CRITICAL PATH 1ST FIRING SAT TEMPORARY (FILLING
DEMIN TANK)
x 3B2 WATER - WTP-SAT2 CRITICAL PATH 1ST FIRING SAT TEMPORARY (MRT DEMIN
PUMP)

x 3B3 WATER - WTP-SAT3 CRITICAL PATH 1ST FIRING SAT TEMPORARY (DIST TO
DEARATOR)
x 3B4 WATER - WTP-SAT-4 CRITICAL PATH PERMANENT WTP SAT DEMIN & RO

x
x 3C1 WATER - BFW-SAT CRITICAL PATH 1ST FIRING WATER-BFW-SAT1 (1ST
FIRING)
x 3C2 WATER - BFW NO N/A NON SAT (DISTRIBUTION)

x
x 3D1 WATER - WASTE-SAT CRITICAL PATH 1ST FIRING WATER-WASTE-SAT1 (1ST
FIRING - BLOWDOWN)
x 3D2 WATER - WASTE-SAT NO N/A NON SAT (DISTRIBUTION)

x
x 3E WATER - CHEMICAL INJ CRITICAL PATH 1ST FIRING CHEM-INJ SAT

x
x 3F GAS TURBINE GENERATOR CRITICAL PATH 1ST FIRING GTG-SAT
(GTG)
x
x 4A DIESEL FUEL CRITICAL PATH 1ST FIRING WATER-FD-SAT1 (1ST FIRING)

x
x 5A STEAM CRITICAL PATH 1ST FIRING STEAM-SAT1 (1ST FIRING -
BLOWDOWN)
x 5B1 STEAM CRITICAL PATH STEAM BLOW STEAM-SAT2 (STEAM BLOW) -
FOR CHEM CLEAN 241

x 5B2 STEAM CRITICAL PATH STEAM BLOW STEAM-SAT2 (STEAM BLOW) -


FOR CHEM CLEAN 322

x 5C STEAM CRITICAL PATH STEAM BLOW STEAM-SAT3 (STEAM BLOW) -


LP STEAM
x 5D STEAM CRITICAL PATH STEAM BLOW STEAM-SAT4 (STEAM BLOW-
MP STEAM)
x 5E STEAM NO N/A CONDENSATE - NON SAT

x
x 6 BUY BACK CRITICAL PATH FUEL GAS SAT

x
x 7A BUY BACK CRITICAL PATH FLARE SAT

x 7B BUY BACK CRITICAL PATH ADDITIONAL SAT


BUYBACK
x
x 8A SELEXOL (UNIT 241) CRITICAL PATH CHEM CLEAN 241 - CHEM CLEAN 241 - BOX UP
BOX UP
x 8B SELEXOL (UNIT 241) CRITICAL PATH CHEM CLEAN 241 CHEM CLEAN 241 - NON BOX
UP
x
x 9A CORE (UNIT 322) CRITICAL PATH CHEM CLEAN 322 - CHEM CLEAN 322 - BOX UP
BOX UP

x 9B CORE (UNIT 322) CRITICAL PATH CHEM CLEAN 322 - CHEM CLEAN 322 - NON BOX
NON BOX UP UP

x
x 10 PROPYLENE REF (UNIT 234) CRITICAL PATH VACUUM UNIT 234 VACUUM UNIT 234

x
x 11A KOMPRESSOR 242 & 260 CRITICAL PATH KOMPRESSOR 242 KOMPRESSOR 242 & 260 -
& 260 LUBE OIL

x 11B KOMPRESSOR 242 & 260 CRITICAL PATH KOMPRESSOR 242 KOMPRESSOR 242 & 260 -
& 260 DRY GAS

x 11C KOMPRESSOR 242 & 260 CRITICAL PATH KOMPRESSOR 242 KOMPRESSOR 242 & 260 -
& 260 PIPE ALIGNMENT

x
x 12 FLARE - LF & HF CRITICAL PATH FLARE - LF & HF FLARE - LF & HF

x
TOTAL CRITICAL PATH
x
TOTAL (TP) TESTED (TP) REMAINING SHEDULE FINISH P6 FORECAST HYDRO
(TP) (UPDATE 26 DES)

#VALUE! #VALUE! #VALUE! 30 JAN 21 CLOSED

#VALUE! #VALUE! #VALUE! 18 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 30 JAN 21 CLOSED

#VALUE! #VALUE! #VALUE! 16 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 16 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 31 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 27 APR 21 CLOSED

#VALUE! #VALUE! #VALUE! 16 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 16 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 16 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 16 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 27 APR 2021 CLOSED

#VALUE! #VALUE! #VALUE! 27 APR 2021 CLOSED

#VALUE! #VALUE! #VALUE! 8 MAR 21 CLOSED


#VALUE! #VALUE! #VALUE! 8 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 16 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 25 MEI 21 CLOSED

#VALUE! #VALUE! #VALUE! 1 MAR 21 CLOSED

#VALUE! #VALUE! #VALUE! 30 APR 2021 CLOSED

#VALUE! #VALUE! #VALUE! 30 APR 2021 CLOSED

#VALUE! #VALUE! #VALUE! 30 APR 2021 CLOSED

#VALUE! #VALUE! #VALUE! 30 APR 2021 15 APR 2022

#VALUE! #VALUE! #VALUE! 30 APR 2021 CLOSED

#VALUE! #VALUE! #VALUE! 30 APR 2021 15 APR 2022

#VALUE! #VALUE! #VALUE! 25 MEI 2011 CLOSED

#VALUE! #VALUE! #VALUE! 15 APR 2021 CLOSED

#VALUE! #VALUE! #VALUE! 15 APR 2021 CLOSED

#VALUE! #VALUE! #VALUE! 29 MEI 2021 CLOSED

#VALUE! #VALUE! #VALUE! 29 MEI 2021 CLOSED

#VALUE! #VALUE! #VALUE! 14 JUNE 2021 CLOSED

#VALUE! #VALUE! #VALUE! 14 JUNE 2021 CLOSED

#VALUE! #VALUE! #VALUE! 9 SEP 2021 CLOSED


#VALUE! #VALUE! #VALUE! 9 SEP 2021 CLOSED

#VALUE! #VALUE! #VALUE! 6 JUN 2021 CLOSED

#VALUE! #VALUE! #VALUE! 27 MEI 2021 CLOSED

#VALUE! #VALUE! #VALUE! 9 SEP 2021 CLOSED

#VALUE! #VALUE! #VALUE!


JTB PROJECT TOTAL TP PIPING 2624 100.00%
TEST PACKAGE DETAIL TOTAL TP TESTED 2555 97.37%
TOTAL PIPE CLEANING 2529 96.38%
TOTAL REINSTATEMENT 2062 78.58%
TOTAL PAINTING DONE 727 31.55%
TOTAL INSULATION DONE 115 38.85%

HYDROTEST STATUS
CRITICAL TEST PRESS
TP NO AREA TEST TYPE TESTED DATE TEST STATUS LATEST STATUS
PATH (PSI)

10 TB-234-DC-0002 PROCESS 1 HYDROTEST 150 28/10/2021 TESTED TESTED

10 TB-234-DC-0003 PROCESS 1 HYDROTEST 225 10/10/2021 TESTED TESTED

10 TB-234-DO-0102 PROCESS 1 VISUAL TEST - 15/07/2021 TESTED TESTED

10 TB-234-DO-0106 PROCESS 1 VISUAL TEST - 16/07/2021 TESTED TESTED

10 TB-234-FD-0001 PROCESS 1 HYDROTEST 225 21/05/2021 TESTED TESTED

10 TB-234-GG-0001 PROCESS 1 PNEUMATIC TEST 187 30/08/2021 TESTED TESTED

10 TB-234-RQ-0031 PROCESS 1 HYDROTEST 450 26/11/2021 TESTED TESTED

10 TB-234-RQ-0036 PROCESS 1 HYDROTEST 547,5 19/11/2021 TESTED TESTED

NON CP TB-241-DC-0005 PROCESS 1 HYDROTEST 150 16/06/2021 TESTED TESTED

NON CP TB-241-DS-0004A PROCESS 1 HYDROTEST 150 06/01/2022 TESTED TESTED

9B TB-322-DN-0004 PROCESS 2 HYDROTEST 75 29/10/2021 TESTED TESTED

9B TB-322-DN-0114 PROCESS 2 HYDROTEST 300 05/06/2021 TESTED TESTED