Professional Documents
Culture Documents
Sr. No.
1
2
3
5
6
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Partial Risk Guarantee for Energy Efficiency
24
25
26
27
28
29
30
31
32
33
34
35
36
Partial Risk Guarantee for Energy Efficiency
Instruction to Applicant
Please insert Name of your company
Please insert type of project: New Project, Expansion of project, Diversification,
modernisation of project. Please specify the name of project also for eg. Street Light or
replacement of incandescent lamp with T5 tube light
Installed capacity of the project in kW
Load factor - Its a measure of the output of a project compared to the maximum output
it could produce.
Total Project Cost: Project Cost includes cost of Fixed assets such as Plant & Machinery,
Land, building etc., any contingency expense, Interest during construction, Preliminary &
Preoperative exp. incurred during the installation of the project
Equity Contribution % - Own fund infused by the promoters of the company
Debt Funding %: Debt/ Loan taken from bank or financial institution for this particular
project
Rate of Interest on Debt/ Working Capital: Rate at which the project company has
availed loan from Financial Institution or Bank for this project
Annual Increase in tariff: Assumption to project power rate for defined life of the project
Number of Working Days of project in a year: eg. A street light would operate for 365
Days in a year
Number of Hours in a day: Total number of hours in a day when the project would run
for eg. A street light would operate for 10 hrs in a day
Operations & Maintenance Cost: The cost incurred in operation and maintenance of the
project
Insurance Cost: Cost incurred to insure the project which may affect the operations of
the project
Average Cost of Material: Cost of consumables for the project
Personal Cost: Includes manpower cost at various level to run the project for eg. Salary
cost of Plant Manager, Maintenance Manager, Shift Supervisor, Foreman, Technicians/
Instrumentation, Helpers, Administrative & Management Staff, General Manager etc.
Administrative Cost: day to day cost for running the project like Printing & Stationery,
Postage & Telephone, Travelling & Conveyance, Legal & Other Professional Charges etc.
Partial Risk Guarantee for Energy Efficiency
MAT Rate: its a tax that has to be paid by the companies that are enjoying tax benefits
or tax exemption under various schemes
Corporate Tax Rate: considered as per income tax department of India
Method of Depreciation: Method of charging depreciation on fixed assets value of the
project
Working capital Assessment: capital used in day-to-day operations of a business/
project. Cost of Material, Operating and maintenance cost, insurance cost, personal cost,
administrative cost are required to run the project
Contingencies: amount kept aside as cash reserve to meet the contingencies in capital
(assumed)
NPV Discounting rate: it represents the time value of money
Risk Free Rate of Return: The risk-free rate represents the interest an investor would
expect from an absolutely risk-free investment over a specified period of time, here
average 10 years Government of India Securities rate have been considered
Beta: A measure of the volatility, or systematic risk, of a security or a portfolio in
comparison to the market as a whole.
Expected Return on Market Index: considered on 20 year average of BSE Sensex annual
return
Environment Cost: Assumed as 1% of total project cost. It is the cost to environment for
eg. the cost born for disposing off incandescent bulb after replacement with energy
efficient lights
Installed capacity of the proposed system
Total Number of systems to be installed
Capital Cost sheet, insert the capital investment required for the project
Partial Risk Gurantee for Energy Efficiency
Miscellaneous Expenses 0 -
Education cess/
Secondary &
Higher
Education cess
Education cess/
Secondary &
Higher
Education cess
Contingencies 5.00%
ANCIAL MODEL
t Street Light
Annual Increase
10% 30%
10% 5%
10% 5%
10%
10% 5%
10%
Partial Risk Gurantee for Energy Efficiency
ANCIAL MODEL
10%
10% 25%
10% 15%
10% 15%
Partial Risk Gurantee for Energy Efficiency
ANCIAL MODEL
Ann Increase
0% 10%
0% 20%
2% 40%
2% 30%
0%
0%
um Alternate Tax
18.50%
10.00%
3.00%
3%
SLM
Annexure -2
Applicable Tariff:
Tariff
Year FY Ending
1 2014 4.92
2 2015 5.07
3 2016 5.22
4 2017 5.38
5 2018 5.54
6 2019 5.70
7 2020 5.87
8 2021 6.05
9 2022 6.23
10 2023 6.42
Partial Risk Gurantee for Energy Efficiency
PROJECT COST
5 Contingencies 5.85
6 Interest During Construction 1.55
7 Preliminary & Preoperative Exp 0.000
TOTAL CAPITAL COST 129.40
MEANS OF FINANCE
36
42%
58%
2 3 4 5 6 7 8 9 10
- - - - - - - - -
24.57 24.57 - - - - - - -
24.57 24.57 - - - - - - -
2 3 4 5 6 7 8 9 10
24.83 49.91 75.26 75.26 75.26 75.26 75.26 75.26 75.26
24.57 24.57 - - - - - - -
49.40 74.48 75.26 75.26 75.26 75.26 75.26 75.26 75.26
0.51 0.78 - - - - - - -
49.91 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
2 3 4 5 6 7 8 9 10
- - - - - - - - -
0.51 0.78 - - - - - - -
2 3 4 5 6 7 8 9 10
- - - - - - - - -
42.62 42.62 - - - - - - -
42.62 42.62 - - - - - - -
Partial Risk Gurantee for Energy Efficiency
Partial Risk Gurantee for Energy Efficiency
11 12 13 14 15 16 17 18 19
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
11 12 13 14 15 16 17 18 19
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
11 12 13 14 15 16 17 18 19
- - - - - - - - -
- - - - - - - - -
11 12 13 14 15 16 17 18 19
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
Partial Risk Gurantee for Energy Efficiency
20 21 22 23 24 25 26 27 28
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
20 21 22 23 24 25 26 27 28
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
20 21 22 23 24 25 26 27 28
- - - - - - - - -
- - - - - - - - -
20 21 22 23 24 25 26 27 28
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
Partial Risk Gurantee for Energy Efficiency
29 30 31 32 33 34 35 36 37
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
29 30 31 32 33 34 35 36 37
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
29 30 31 32 33 34 35 36 37
- - - - - - - - -
- - - - - - - - -
29 30 31 32 33 34 35 36 37
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
Partial Risk Gurantee for Energy Efficiency
38 39 40 41 42 43 44 45 46
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
38 39 40 41 42 43 44 45 46
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
38 39 40 41 42 43 44 45 46
- - - - - - - - -
- - - - - - - - -
38 39 40 41 42 43 44 45 46
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
Partial Risk Gurantee for Energy Efficiency
47 48 49 50 51 52 53 54 55
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
47 48 49 50 51 52 53 54 55
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
- - - - - - - - -
75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26 75.26
47 48 49 50 51 52 53 54 55
- - - - - - - - -
- - - - - - - - -
47 48 49 50 51 52 53 54 55
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
Partial Risk Gurantee for Energy Efficiency
56 57 58 59 60
- - - - -
- - - - -
- - - - -
56 57 58 59 60
75.26 75.26 75.26 75.26 75.26
- - - - -
75.26 75.26 75.26 75.26 75.26
- - - - -
75.26 75.26 75.26 75.26 75.26
56 57 58 59 60
- - - - -
- - - - -
56 57 58 59 60
- - - - -
- - - - -
- - - - -
Partial Risk Gurantee for Energy Efficiency
POWER
SavingGENERATION
PARTICULARS Units (KWH/KG/LTR) 1 2 3 4 5 6
Total Energy Saving '000 397 530 530 530 530 530
Reduction in Energy Efficiency '000 0.00 0.00 0.00 0.00 0.00 0.00
Net Energy Saving 530 530 530 530 530 530
Net Energy Saving after reduction in'000 530 530 530 530 530 530
Energy shared with Facility owner '000 53 53 53 53 53 53
Energy saving share of ESCO '000 477 477 477 477 477 477
O&M services Expenses 27 30 33 36 40 43
Tarriff INR ` 4.92 5.07 5.22 5.38 5.54 5.70
Energy Saving of ESCO '000 477 477 477 477 477 477
Total Savings Realization from
project INR Lacs 50.45 53.86 57.55 61.56 65.93 70.67
Total Savings Realization from
project (at constant prices) & )
O&M INR Lacs 50.45 53.15 56.12 59.39 62.98 66.94
Partial Risk Gurantee for Energy Efficiency
7 8 9 10
530 530 530 530
0.00 0.00 0.00 0.00
530 530 530 530
530 530 530 530
53 53 53 53
477 477 477 477
48 53 58 64
5.87 6.05 6.23 6.42
477 477 477 477
Depreciation as per Companies Act 6.18 6.18 6.18 6.18 6.18 6.18
Total Depreciation 4.63 6.18 6.18 6.18 6.18 6.18
INR Lacs
7 8 9 10
- - - -
4.25 4.68 5.14 5.66
6.38 7.02 7.72 8.49
5.10 5.61 6.17 6.79
7.65 8.42 9.26 10.19
6.80 7.48 8.23 9.05
2.55 2.81 3.09 3.40
32.74 36.01 39.61 43.57
- - - -
- - - -
2.13 2.34 2.57 2.83
7 8 9 10
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
- - - -
- - - -
- - - -
- - - -
- - - -
Partial Risk Gurantee for Energy Efficiency
B Expenditure
Cost of Material 0.75 1.00 1.00 1.00 1.00 1.00 1.00
Operating & Maintenance Cost 0.73 0.97 1.02 1.07 1.12 1.18 1.24
Insurance Cost 0.73 0.98 0.99 1.00 1.01 1.02 1.03
Personnel Cost 14.76 21.65 23.81 26.19 28.81 31.69 34.86
Administrative Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00
service Tax 5.55 5.92 6.33 6.77 7.25 7.77 8.34
F Profit After Taxation 13.39 8.11 10.55 12.91 14.46 15.11 15.66
Partial Risk Gurantee for Energy Efficiency
8 9 10
72.50 77.95 83.90
8.96 9.63 10.37
81.46 87.59 94.26
- - -
- - -
24.63 26.17 27.82
Balance Sheet
Particulars 1 2 3 4 5 6
Sources Of Fund
Shareholder's Fund
Share Capital 54.14 54.14 54.14 54.14 54.14 54.14
Internal Cash Generation
Share Premium - - - - -
Profit and Loss 13.39 21.51 32.05 44.97 59.43 74.54
Total Shareholders Fund 67.53 75.65 86.19 99.11 113.57 128.68
% of Capital Employed
Borrowed Fund
Term Loan 63.37 47.53 31.69 15.84 - -
Total Borrowed Fund 63.37 47.53 31.69 15.84 - -
% of Capital Employed
Total Capital Employed 130.91 123.18 117.88 114.95 113.57 128.68
Application of Fund
Fixed Asset
Gross Block 129.40 129.40 129.40 129.40 129.40 129.40
Less: Accumulated Depreciation 4.63 10.81 16.99 23.17 29.34 35.52
Net Block 124.76 118.59 112.41 106.23 100.05 93.88
Cash Balance( As Per cash flow) 6.14 4.59 5.47 8.72 13.52 34.80
WC requiremnt - - - - - -
Total Capital Employed 130.91 123.18 117.88 114.95 113.57 128.68
- - - - - -
Partial Risk Gurantee for Energy Efficiency
Figures in lacs
7 8 9 10
- - - -
90.20 104.84 120.51 137.30
144.34 158.98 174.65 191.44
- -
- - - -
-
144.34 158.98 174.65 191.44
- - - -
Partial Risk Gurantee for Energy Efficiency
B APPLICATION OF FUNDS
Capital Expenditure 129.40 127.85
Increase in WC - - - - - -
Repayment of Term Loan 11.88 15.84 15.84 15.84 15.84 -
INR Lacs
7 8 9 10
15.66 14.63 15.68 16.79
6.18 6.18 6.18 6.18
- - - -
- - - -
- - - -
INR Lacs
7 8 9 10
- - - - -
- - - -
Partial Risk Gurantee for Energy Efficiency
Tax calculation
1 2 3 4
PBDIT 27.94 23.33 24.40 25.53
Interest on Term Loan 6.56 7.01 5.03 3.05
Depreciation as per IT 19.84 16.80 14.22 12.04
PBT 1.54 -0.48 5.14 10.43
Cumulative 1.54 1.06 6.21 16.64
Set off
Tax as per IT 0.50 -0.15 1.67 3.39
Cumulative tax IT 0.50 0.35 2.01 5.40
MAT 3.35 2.03 2.64 3.26
MAT credit 3.35 5.38 8.02 11.28
Tax 3.35 2.03 2.64 3.39
5 6 7 8 9
26.73 28.00 29.36 30.81 32.35
1.07 0.00 0.00
10.19 7.31 6.19
15.46 20.69 23.17 30.81 32.35
32.10 52.80 75.97 106.78 139.12
10
34.00
34.00
173.12
11.03
56.17
5.57
39.91
11.03
11.03
Partial Risk Gurantee for Energy Efficiency
8 9 10
3 4 5 6 7 8 9
0 0 0 0 0 0 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 0 0 0 0 0 0
3 4 5 6 7 8 9
0 0 0 0 0 0 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
Partial Risk Gurantee for Energy Efficiency
10
0
0.0
0.0
0
10
0
0.0
Partial Risk Gurantee for Energy Efficiency
Moratorium 3 months
Repayment 60 months
Opening
Sl No. FY Ended Month Balance
1 1 75.26
2 2 75.26
3 3 75.26
4 4 75.26
5 5 73.94
6 6 72.62
7 1 7 71.30
8 8 69.98
9 9 68.65
10 10 67.33
11 11 66.01
12 12 64.69
13 13 63.37
14 14 62.05
15 15 60.73
16 16 59.41
17 17 58.09
18 18 56.77
19 2 19 55.45
20 20 54.13
21 21 52.81
22 22 51.49
23 23 50.17
24 24 48.85
25 25 47.53
26 26 46.21
27 27 44.89
28 28 43.57
29 29 42.25
30 30 40.93
31 3 31 39.61
32 32 38.29
33 33 36.97
34 34 35.65
35 35 34.33
36 36 33.01
37 37 31.69
38 38 30.37
39 39 29.05
40 40 27.73
41 41 26.41
42 42 25.09
43 4 43 23.77
Partial Risk Gurantee for Energy Efficiency
Moratorium 3 months
Repayment 60 months
Opening
Sl No. 4
FY Ended Month Balance
44 44 22.44
45 45 21.12
46 46 19.80
47 47 18.48
48 48 17.16
49 49 15.84
50 50 14.52
51 51 13.20
52 52 11.88
53 53 10.56
54 54 9.24
55 5 55 7.92
56 56 6.60
57 57 5.28
58 58 3.96
59 59 2.64
60 60 1.32
Partial Risk Gurantee for Energy Efficiency
Moratorium 3 months
Repayment 60 months
Opening
Sl No. FY Ended Month Balance
61 61 -
62 62 -
63 63 -
64 64 -
65 65 -
66 66 -
67 6 67 -
68 68 -
69 69 -
70 70 -
71 71 -
72 72 -
73 73 -
74 74 -
75 75 -
76 76 -
77 77 -
78 78 -
79 7 79 -
80 80 -
81 81 -
82 82 -
83 83 -
84 84 -
85 85 -
86 86 -
87 87 -
88 88 -
89 89 -
90 90 -
91 8 91 -
92 92 -
93 93 -
94 94 -
95 95 -
96 96 -
97 97 -
98 98 -
99 99 -
100 100 -
101 101 -
102 102 -
103 9 103 -
Partial Risk Gurantee for Energy Efficiency
Moratorium 3 months
Repayment 60 months
Opening
Sl No. 9
FY Ended Month Balance
104 104 -
105 105 -
106 106 -
107 107 -
108 108 -
109 109 -
110 110 -
111 111 -
112 112 -
113 113 -
114 114 -
115 10 115 -
116 116 -
117 117 -
118 118 -
119 119 -
120 120 -
TOTAL
Partial Risk Gurantee for Energy Efficiency
Street Light
L REPAYMENT SCHEDULE
Principal Total
Interest Repayment Repayment
- - -
- - -
- - -
0.78 1.32 2.10
0.77 1.32 2.09
0.76 1.32 2.08
0.74 1.32 2.06
0.73 1.32 2.05
0.72 1.32 2.04
0.70 1.32 2.02
0.69 1.32 2.01
0.67 1.32 1.99
0.66 1.32 1.98
0.65 1.32 1.97
0.63 1.32 1.95
0.62 1.32 1.94
0.61 1.32 1.93
0.59 1.32 1.91
0.58 1.32 1.90
0.56 1.32 1.88
0.55 1.32 1.87
0.54 1.32 1.86
0.52 1.32 1.84
0.51 1.32 1.83
0.50 1.32 1.82
0.48 1.32 1.80
0.47 1.32 1.79
0.45 1.32 1.77
0.44 1.32 1.76
0.43 1.32 1.75
0.41 1.32 1.73
0.40 1.32 1.72
0.39 1.32 1.71
0.37 1.32 1.69
0.36 1.32 1.68
0.34 1.32 1.66
0.33 1.32 1.65
0.32 1.32 1.64
0.30 1.32 1.62
0.29 1.32 1.61
0.28 1.32 1.60
0.26 1.32 1.58
0.25 1.32 1.57
Partial Risk Gurantee for Energy Efficiency
Street Light
L REPAYMENT SCHEDULE
Principal Total
Interest Repayment Repayment
0.23 1.32 1.55
0.22 1.32 1.54
0.21 1.32 1.53
0.19 1.32 1.51
0.18 1.32 1.50
0.17 1.32 1.49
0.15 1.32 1.47
0.14 1.32 1.46
0.12 1.32 1.44
0.11 1.32 1.43
0.10 1.32 1.42
0.08 1.32 1.40
0.07 1.32 1.39
0.06 1.32 1.38
0.04 1.32 1.36
0.03 1.32 1.35
0.01 1.32 1.33
Partial Risk Gurantee for Energy Efficiency
Street Light
L REPAYMENT SCHEDULE
Principal Total
Interest Repayment Repayment
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Partial Risk Gurantee for Energy Efficiency
Street Light
L REPAYMENT SCHEDULE
Principal Total
Interest Repayment Repayment
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
22.73 75.26 97.99
Partial Risk Gurantee for Energy Efficiency
SENSITIVITY ANALYSIS
Indicative Parameter 1 2 3
Key Results
Net Sales 50.45 53.86 57.55
PBDIT 27.94 23.33 24.40
Profit Before Taxes 16.74 10.14 13.19
Profit After Taxes 13.39 8.11 10.55
1.17 1.28 -
1.20 1.30 -
Partial Risk Gurantee for Energy Efficiency
INR Lacs
7 8 9 10
- - - -
- - - -
- - - -
7 8 9 10
- - - -
- - - -
Partial Risk Gurantee for Energy Efficiency
INR Lacs
7 8 9 10
7 8 9 10
7 8 9 10
Cost of Equity
Risk Free Return Beta Equity Risk Premium
8.43% 1.00 5.8246%
Cost of Equity 14.25000%
Cost of Debt
Interest Rate Tax
12.50% 33.99%
Cost of Debt 8.25%
Debt - Equity
Debt Equity
60% 40%
WACC 10.65%
Partial Risk Gurantee for Energy Efficiency
Amounts in Lakhs
5 6 7 8 9 10
(129.40)
Partial Risk Gurantee for Energy Efficiency
Amount in Lakhs
5 6 7 8 9 10
6.18 6.18 6.18 6.18 6.18 6.18
14.46 15.11 15.66 14.63 15.68 16.79
20.64 21.29 21.84 20.81 21.85 22.97
(40.62) (19.34) 2.51 23.32 45.17 68.14
Partial Risk Gurantee for Energy Efficiency
Economic Analysis
PROJECT COST
Project Cost
PARTICULARS Units 1
Capital Cost 122.85
O&M cost (excluding personnel cost) 7.76
Personnel Cost 11.07
Energy bill 5.02
Total Project cost 146.70
Project Benefits
PARTICULARS Units 1
Energy Saving '000 KWH/KG/LTR 397
Reduction in Energy Efficiency '000 KWH/KG/LTR -
Net Energy Saving '000 KWH/KG/LTR 397
Tarriff INR /KWH/KG/LTR 4.92
EIRR 44.48%
NPV ₹ 123.88
5323
Partial Risk Gurantee for Energy Efficiency
2 3 4 5 6 7 8
2 3 4 5 6 7 8
530 530 530 530 530 530 530
- - - - - - -
530 530 530 530 530 530 530
4.92 4.92 4.92 4.92 4.92 4.92 4.92
Investment Simply
cost in Rs. Payback
period in
years
6,478,140.00 2.29
12.8
2,228,060.00 3.43
19.2
10,079,800.00 3.92
22.0
519,140.00 3.43
19.2
2,895,771.00
5-7%
4,826,285.00 15%
27,027,196.00 4.36
27,027,196.00
11%
18%
9 10
13.05 13.86
31.64 34.80
-1.49 -1.49
43.20 47.18
9 10
530 530
- -
530 530
4.92 4.92
81.33 87.12
7.82 7.82
90.91 96.70
47.71 49.52
499 499
(30.32) (30.32)
Partial Risk Gurantee for Energy Efficiency
-1.49 -1.49