Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 1 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
F11 08-Jul-18 Issued for Final Stanley Park Henry Park M.H.Kim
F10 29-Jan-18 Issued for Final Stanley Park Henry Park M.H.Kim
F9 19-Oct-17 Issued for Final Bijulal Ahn Byeong Ho M.H.Kim
F8 15-Oct-17 Issued for Final Bijulal Ahn Byeong Ho M.H.Kim
F7 30-Mar-17 Issued for Final F.Gonzales Ahn Byeong Ho M.H.Kim
F6 13-Feb-17 Issued for Final F.Gonzales Ahn Byeong Ho M.H.Kim
F5 06-Feb-17 Issued for Final F.Gonzales Ahn Byeong Ho M.H.Kim
F4 31-Jan-17 Issued for Final F.Gonzales Ahn Byeong Ho M.H.Kim
F3 18-Jan-17 Issued for Final F.Gonzales Ahn Byeong Ho M.H.Kim
F2 28-June-16 Issued for Final F.Gonzales Ahn Byeong Ho M.H.Kim
F1 02-Mar-16 Issued for Final F.Gonzales Ahn Byeong Ho M.H.Kim
O6 14-Feb-16 Issued for Comment SC Shin Joy Kim Felix Jang
O5 04-Feb-16 Issued for Comment SC Shin Joy Kim Felix Jang
O4 25-Jan-16 Issued for Comment SC Shin Joy Kim Felix Jang
O3 20-Jan-16 Issued for Comment SC Shin Joy Kim Felix Jang
O2 19-Jan-16 Issued for Comment SC Shin Joy Kim Felix Jang
O1 18-Jan-16 Issued for Comment SC Shin Joy Kim Felix Jang
REV DATE Description Originated by Checked by Approved by
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
TROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 2 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
RECORDS OF REVISION
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 3 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
LIST OF HOLDS
nd
Add: 2 Para. “ ITM, Ferrite, HT”
7 3.3 F3 18-Jan-17
Add: “Special precaution shall be taken if weather condition can cause
freezing of heating up pf the test water.”
Add Para: Pressure Relief Valve (PRV) shall be calibrated every 6 months
and with the tag of last calibrated date and KNPC approved third
14 6.3.8 F3 party certificate.
Add: Test manifold shall be calibrated every one year by 3rd party inspection.
ND
Words Correction 2 Para. “ fill or purge” –(incorporator’s comment-GS)
8 3.3.4 F4 31-Jan-17
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 4 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
Add: sentence to #1) follow as per line list. (PMC comment on F2)
Add: The system under test shall be held at test pressure until all joints to be
examined. In no case shall the duration of the pressure test be less than one
10 4.1.1 F4 31-Jan-17 hour on each system tested. (PMC comment on F2)
Add: However the contractor providing all test packages to Company for line check
& document check purpose prior to testing. Company will check/verify the test
package contents include the test limits. (Incorporator’s comment- JGC)
6.3.5 ADD: Pressure Relief Valve (PRV) shall be calibrated every 1 year and with the tag of
14 F4 31-Jan-17 last calibrated date and KNPC approved third party certificate.
6.3.8
Deleted: “Test Manifold shall be calibrated every one year by 3rd Party Inspection”
Add: “Test Manifold shall be certified by 3rd Party Inspection”. (Incorporator’s comment-
JGC)
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 5 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
such as ball valves, which have cavities when fully open, are set in the
half-open/close position”.
Rewords the para. : Company will check/verify and approve the test
package contents include the test limits.
Re-words the paragraph: “If the valve is not available in the system
14 6.3.6 F7 30-Mar-17 for pressure test limit”
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 6 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
Deleted - ANSI B31.3 & ANSI B31.1 and replaced ASME B31.3 & ASME
6 2.0 F10 29-Jan-18
B31.1
Add: ASME BPV Code Sec. VIII Div.1 – Rules for construction of pressure
6 2.0 F10 29-Jan-18
vessels.
11 5.1- 5.3 F10 29-Jan-18 Update the contents according to new attachment #02 to #04
17 7.0 F10 29-Jan-18 Attachment #02 has updated and #03 & #04 have been added.
F11 Duration of Time duration of hydro test revised. Following DEP for new area
12 4.1.1 08-Jul-18 and KNPC standard for revamping (Licensor-7).
Note: Incorporate all comments both JGSK & PMC comments, revision marked (bar line) indicate as revised
portion.
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 7 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
TABLE OF CONTENTS
1.0 SCOPE.................................................................................................................................. 8
5.0 THE TEST BLANK AND BLIND FOR THE PRESSURE TEST…....................................... 13
7.0 ATTACHMENTS.................................................................................................................... 18
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 8 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
1.0 SCOPE
This procedure describes the general requirements and procedures for shop and field
pressure testing of above ground and underground pressure metallic piping system,
connected equipment and integral components to assure mechanical strength and
tightness.
1.1 The following are excluded from the requirements of this procedure:
1.1.1 Any package previously tested by the manufacturer in accordance with the applicable
code.
1.1.2 Instrument piping lead lines between the root valve at the process or utility line and the
connected instrument, and control piping used to connect air or hydraulically operated
control apparatus.
1.2 The following systems shall be checked thoroughly by visual examination after
installation
1.2.1 Atmospheric sewer, drainage system and static head test required as per DEP.
1.2.2 Lines and systems which are open to the atmosphere, such as vents, drains, and open
ended safety valve discharge. As required by the line list.
ASME BPV Code Sec.VIII Div.1 Rules for construction of pressure vessels
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 9 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
CFP-Licensor -0005-CNSL-ENGG-AGT-SRU-MAA
3.0 GENERAL
3.2 The line list shall indicate the type of test and pressure to use on each line. The
maximum operating pressure of each piece of equipment, including instruments, shall
be checked against the test pressure of the piping system in which the piece of
equipment is included. If the test pressure of the piping system is greater than the
maximum operating pressure of the equipment, the equipment shall be blanked off and
tested separately. Test through the equipment required Company approval.
3.3 Wherever reference is made to hydrostatic pressure testing, the medium shall be water.
The water quality to be used for hydrostatic testing depends on the material(s) from
which the equipment to be tested is manufactured (see below). Whatever the source of
the hydrostatic test water, it shall be filtered through a 10 μm filter when filling the
system in accordance with DEP 74.00.10.10-Gen Claus 3.2.1. The water quality shall
have been tested for chloride and microbiological culture (if required), content within the
last 3 months and certificate available for inspection. The line shall be thoroughly
checked before pressure test as per the Company approved checklists.
The piping spool has been fully inspected prior to hydrostatic test (visual examination,
NDE, heat treatment, and positive material identification, ITM, F errite, HT) and the
package shall be submitted for company review at least 48 hours before the test time.
Water quality certificate should be provided at the time of inspection for the piping
hydrostatic test.
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 10 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
Special precaution shall be taken if weather condition can cause freezing or heating up
of the test water.
The stainless steel shall be clean prior to final assembly and hydrostatic testing.
The equipment and/or piping shall be tested with good quality water that must contain
less than 50ppm chloride and be free from sediment.
Austenitic stainless steel piping sections and components such as valves and
expansion joints that do not allow full draining or mechanical drying and that do not
require field hydro testing should preferably be isolated from the system, and, if still
required, tested separately from the system.
The preferred hydrostatic testing method is to use potable water and to carefully rinse
the equipment immediately after the pressure test with condensate; boiler feed water or
demineralized water, followed by thorough drying or dewatering of the equipment and
fill with nitrogen in such a way that all oxygen is removed from the system.
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 11 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
3.4 Test pressure for hydrostatic test will be 1.5 times of design pressure.
3.6 The minimum temperature of the fluid used for hydrostatic test shall [PS] be 17℃ (30℉)
above the minimum design metal temperature of the piping, unless otherwise approved
by the Company.
Before application of test pressure, the test fluid and piping material shall be allowed to
equalize to approximately the same temperature.
In case metal temperature and/ or test liquid is below +10℃ (+50℉), the minimum
allowable metal temperature shall be determined as per following decision tree.
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 12 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
4.1.1 The hydrostatic test pressure at any point in the system shall be as follows:
1) Not less than 1½ times the design pressure, follow as per approved line list.
2) Application of pressure
The system under test shall be held at test pressure until all joints to be examined.
a) For Revamping areas (Licensor-7), in no case shall the duration of the pressure
test be less than one hour on each system tested.(Ref- KNPC Engineering
Standard 93A2 Clause 5.6.1).
b) For new areas, the full test pressure (+ 1.0 %) shall be held for at least 10
minutes or as long as required to complete the inspection, whichever is greater.
(Ref - DEP 74.00.10.10-Gen. -SHOP AND FIELD PRESSURE TESTING OF
PIPING, clause-3.3.3).
3) For a design temperature above the test temperature, the minimum test pressure
shall be as calculate by the following equation:
1.5 × P × ST
PT = ---------------------
S
Where
PT = minimum hydrostatic gauge pressure (psi)
P = internal design gauge pressure (psi)
ST = allowable stress at test temperature (psi)
S = allowable stress at design temperature (psi)
(See Table 1, Appendix-A, ANSI/ASME B31.3)
4.1.2 Equipment is usually shop tested at vendors shop. It is preferred field practice to isolate
connected equipment from the piping for hydrostatic pressure testing.
4.2.1 Lines in external pressure service shall be subjected to an internal test pressure of 1½
times the external differential design pressure but not less than a gauge pressure of 1
bar (15psi).
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 13 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
4.2.2 In jacketed lines, the jacket shall be pressure tested on the basis of the internal or
external design pressure, whichever is the more critical.
5.0 THE TEST BLANK AND BLIND FOR THE PRESSURE TEST
5.1 Attachment #02 provides the calculated thickness of the test blank and its formula.
For the test blank with a nipple, the dimension “A” in the attachment #04 shall be
complied with the calculated thickness in the attachment #02.
5.2 Attachment #03 provides the calculated thickness of the test blind and its formula.
5.3 All weldments on the test blank and blind shall be examined by any nondestructive
(NDE) method in accordance with ASME B31.1.
5.4 A36 or equivalent material shall be used and the material test certificate shall be
provided at the time of inspection or test.
6.1.1 A pressure relief valve shall be installed on the discharge of the test pump. This PRV
shall be set at 110% of test pressure.
Pressure gauges shall be installed at the pump discharge and on highest point of the
equipment being tested.
The gauges shall have accuracy as specified in the applicable code and shall have a
scale range suitable for the No: 1.5 to 3.0 times test pressure. Additional guidance for
hydro test equipment may be found in ASME PCC-2.
Where bellows are installed in the test circuit, special precautions shall be taken to
prevent over pressurizing.
6.1.2 All joints, including welds, shall be left un-insulated, un-coated (ie, un-painted) and
exposed for examination during the test, except that joints previously tested in
accordance with this procedure.
(a) Piping requiring a sensitive leak test also referred to as a sensitive pressure test.
(b) Any piping to be pneumatically tested.
(c) Any piping, where the test pressure is equal to or less than 5 barg.
(d) Or Licensor requirements
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 14 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
6.1.3 Underground portions of piping systems may be tested and covered prior to testing of
above ground portions.
6.1.4 Piping designed for vapor or gas shall be provided with additional temporary supports, if
necessary to support the weight of the test liquid. Where required, temporary supports
shall be specified in the pressure test documents
6.1.5 Lines which are counterweight supported shall be temporarily blocked during testing in
order to sustain the weight of the test fluid. Spring hangers which have been provided
with stops for carrying the test load normally do not require additional temporary
supports and should be locked and recorded on punch list, if this is not the case,
temporary support must be provided before filling of test fluid to the system.
6.1.6 Temporary gaskets with an equal pressure rating can be applied in the flanged spool or
the inline item to be reinstated during/after the test. And it is not required to be
distinguished with a color code.
When test packages are approved by Contractor shall submit for Company approval.
Subcontractor will receive the scan copy of approved test package for each piping
system from Contractor test team. The latest drawings (Isometric drawing, PEFS & etc.)
shall be attached on the test package. Subcontractor shall conduct line check and
punch clearing with this scan copy.
Subcontractor shall submit to Contractor for Contractor’s line check after cleared
Subcontractor category (l) punch items. Then, Contractor generate punch list and pass
to Subcontractor for clearing. When Subcontractor cleared all category (l) punch items,
the test package shall be treated as test package line completion. Contractor’s internal
punch will be closed by Contractor, not Company.
Once Contractor closes all punch items, Company shall be called for Company’s punch
inspection.
Company inspection will be cancelled if more than two categories (I) punch items are
found at any time in the inspection and the test pack returned to Contractor for
Contractor’s re-inspection.
CONFIDENTIAL OR PROPRIETARY INFORMATION
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 15 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
6.2.3 All lines shall be checked to ensure the entire system can be completely drained after
testing.
6.2.4 Vents, drains and relief valves shall be utilized to prevent damage to the piping system
due to thermal expansion or other hazardous conditions during the test period.
6.2.5 Short pieces of piping which must be removed to permit installation of a blind or blank
shall be tested separately or, where possible, connected to main pipe or manifold by
hose and tested at the same time.
6.2.6 Check valves should be removed for test of piping, if locked open or other record on
punch list. This statement does not consider the lift pressure of check valve. Remove or
jack up the check valve completely and provide necessary filler piece or blinds.
6.2.7 System that include expansion joints shall be investigated to see that any required
temporary restraints, anchors, guides, etc., are installed prior to test.
6.3.1 The specific procedure for application of piping pressure test is given in DEP
74.00.10.10-Gen
6.3.2. In order to hydrostatic test as much piping as possible at one time, a system test may
be employed. This test shall include one or more lines and if possible connected
equipment (with Company/ Vendor approval), such as fired heater coils. The extent of
each system test shall be identified by color coding and noting the test number on the
appropriate flow diagram. Color coding on the leak test diagrams should be consistent
with the system limits, as per the commissioning system definition.
6.3.3 The minimum test pressure for test system shall be such that each line in the system is
subjected to a test pressure in accordance with paragraph 3.2 or 3.4.
6.3.4 The maximum system test pressure shall not exceed the pressure test rating of any
piping component included in the test system.
6.3.5 Where systems to be tested are divided at the valves, it should be isolated by blinds in
lieu of valve closing. But where it is impracticable to install blinds (e.g. socket valves),
the valve may be used for isolating of system provided the valve body and seat are
suitable for the testing pressure, with attachment of the valve technical data sheet to the
test package prior to conducting testing, but only with Company approval. Normally
during pressure testing valves are left in the fully open position. Valves such as ball
valves, which have cavities when fully open, are set in the half-open/close position.
Contractor ensures downstream of valve is open to atmosphere to secure the out of test
limit.
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 16 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
Contractor provides all test packages to Company for line check & document check
purpose prior to testing. Company will check/verify and approve the test package
contents include the test limits.
6.3.6 If the valve is not available in the system for pressure test limit, the other piping not
included in the system pressure test shall be either disconnected from the system or
isolated by blinds or other means during the test.
6.3.7 Inline instruments & equipment such as orifice plates, flow meters, control valves & etc.
shall be removed prior to hydrostatic test.
6.3.8. Per DEP 74.00.10.10-Gen Section 3. Pressure gauges shall be installed at the pump
discharge and on highest point of the equipment being tested. The gauges shall have
accuracy as specified in the applicable code and shall have a scale range suitable for
the test pressure. Additional guidance for hydro test equipment may be found in ASME
PCC-2.
Pressure test gauges shall be calibrated every 6 month, using a dead weight tester.
Gauge shall be tagged with the date last calibrated and this activity shall be recorded.
Pressure Relief Valve (PRV) shall be calibrated every 6 months and with the tag of last
calibrated date and KNPC approved third party certificate.
On all hydrostatic tests at least 2 calibrated gauges should be installed to indicate the
test pressure, these should be located at the high and low points of the system. Test
Manifold shall be certified by 3rd Party Inspection
6.3.9 When the required test pressure is establish, mark the position of pressure gauge arrow
indicator (by providing masking tape) and time to be recorded.
6.3.10 Piping subjected to hydrostatic pressure should be clearly marked "Line under
hydrostatic test", and barricaded.
6.3.11. During hydrostatic test check valve to be separated from the line. If not possible
(Welded type valve), internals to be removed and inspected. Testing shall not be
performed in wet weather.
1) Fill the water using the approved temporary hose connection Control rate of filling
so that it will not pressurize the circuit (low supply pressure).
2) Service (process) water pressure, hand operated pump is recommended for filling.
3) Ensure venting of air is done at the highest point.
4) Filling of water shall be carried out from the lowest point.
CONFIDENTIAL OR PROPRIETARY INFORMATION
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 17 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
5) Gradually fill the water in the circuit and ensure air pockets are completely
removed inside the pressurize volume.
6) Filling point and air vent shall be of the same size.
7) After reaching the test pressure, pump will be isolated and disconnected from test
manifold.
8) After piping pressure test, the system will be depressurized and completely
drained.
1) In the event that repairs or additions are made following the pressure test, the
affected piping shall be retested at the pressures originally specified for the test.
2) After completion of testing, all temporary blanks and blinds shall remove, all
operating blinds returned to proper position and all lines and piping components
shall be completely drained. Valves, orifice plates, expansion joints and short pieces
of piping which have been removed shall be reinstalled with proper gaskets in
place. Lines which are being drained after testing shall have all vents open. Piping
systems downstream of check valves should be inspected to insure complete
drainage.
5) Flange joints where the test temporary blind has been removed shall not be
retested. As per line class base, gaskets shall be used for hydrostatic test as per
system requirement (See section 5.2). Asbestos type gaskets are strictly prohibited
from use.
6) Instruments which were removed or blocked out for test shall be reinstalled and
blocks placed in the normal operating position after test.
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 18 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
7.0 ATTACHMENTS
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 19 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
Attachment # 01
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 20 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 21 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
Attachment # 02
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 22 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
INDEX
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 23 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 24 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 25 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 26 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 27 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 28 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 29 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 30 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 31 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 32 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 33 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 34 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 35 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 36 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 37 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 38 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 39 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 40 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 41 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 42 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 43 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 44 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 45 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 46 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 47 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 48 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 49 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 50 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 51 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
Attachment # 03
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 52 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
INDEX
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 53 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 54 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 55 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 56 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 57 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 58 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 59 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 60 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 61 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 62 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 63 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 64 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 65 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 66 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 67 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 68 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 69 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 70 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 71 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 72 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
Attachment # 04
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON
Kuwait National Petroleum Company (K.S.C) P6011MAA.000.10.51.051
Clean Fuels Project (CFP) REV : F11
Conntract No. CFP/EPC/0054-MAA Page 73 of 73
Contractor JOB CODE : 0-6798-20-0000 S-000-3168-0002V
D R A
N
I 09-JUL 8
- 2 0 1
D
RINTE
ED WHEN P
T ROLL
NCON