PAWAN HANS LIMITED EQF-06

REV.: I
WORK ORDER DATE:01/09/2016

Work order No. : DWO/ELD/2021/24 SEPT/100/1315 Date: 24/09/2021


FROM: AME I/C/LMM/BMM TO: AME- VT-ELD

A/C Type SA365N A/C Regn. No. VT-ELD


A/C MSN 6213 Airframe Hrs 22768:49
Engine (LH) S/No. 2329 Eng (LEI) Hrs.
Engine (RH) S/No. 2278 Eng (RI l) Hrs.

Task to be Complied

DEFECT REPORTED:
l. No.2 engine oil pressure indicating needle reads below zero.
ACTION:
1 Check physical conditions of all concerned connectors.
2 Inspect the electrical wiring of No. 2 engine oil pressure indicating circuit as per
Wiring Diagram Manual MCS77-20-00-001.
3 Replace component as required.
4 Ascertain the serviceability of the system by giving a ground run.
……………………………………………………………………………………………………………....
AMM/EMM/Task Card Revision Status: -ORION REV 07. ARRIEL IC EMM REV26

AME I/C/LMM/BMM Signature Receiver’s Signature

Date of Commencement: Date of Completion:

I certify that I have carried out the above mentioned job as specified in the Work Order.

Date: Certifying Staff Signature:

Certifying Staff Name:


Auth /App No.:
Note: Please complete inspection schedule/Job sheet/Component change/Cannibalization Records etc. as
required & send to CAMO cell on completion of the task.

All tasks found completed satisfactorily. Completed inspection schedule/Job sheet/Component


change/Cannibalization Records received along with CRS/Log cards /Serviceable Tag etc.

Date: Signature of CAMO Staff

Component replaced during snag rectification: Yes/No.


(Give Brief detail of the replaced component)