FDH JV - KIPIC ZOR Project
Packages #2 and #3,
FDR J
Picking Ticket
Roms Issued from Catalog
to Qbs0Gotine MMT ANTM
Kuwait, Middle East
Pleling Tieket#: 291659
Description: ISSUED TO NBTO RALPH ; FMR-K205-2042
Materint ni
Issue Group: —4-130652-K205 Tessue Data: 27JUL22
tem Code Size
7e-A101 No Size
FOAM CONCENTRATE STORAGE FACILITY
Dest hse/Lcc:
7eAor1-T-01 Ne Size>
(GRP FOAM CONCENTRATE STORAGE TANK &
Destwhse/.oe:
7eAMOF-T-NE No Slae>
GRP FOAM CONCENTRATE STORAGE TANK 8
Dest/Whse/Loc:
Requested Issue Short Qty act ty
vom Type ay Oy —Tolssue Issued
a T 1.00 00 100
FLD/OFFSITE-LDY
FAT 1.00 00 1.00
rub yoysen\
FAT 1.00 00 4.00
FLD/YO1 8-1
lsued By Date 1)
nt Name
ceived By date 207)
Pint Name
Reviewed By
Print NemaClient: KIPIC
Form 000.470.F0011
Project: Al-Zour Project
Project to. Lozn PON Dat aber
ORIGIN,
eFDH UV amt GlINA
FIELD MATERIAL REQUEST / RETURN (FMR)
[BestiwaTion
REQUESTED BY GRAFT [ene FR NO NBTC Kae TB
RALPH wecH
DELNERTO DATE REQUESTED ——|UINEWO. SF REV
las |
‘CONMODITY
on Rea ee eos
Ta-A-0101 FOAM CONCENTRATE STORAGE
FACILITY
TEAC | [GRP FOAN CONCENTRATE STORAGE
TOA Iran a
TEADIOT | | GRP FOAI CONCENTRATE STORAGE] T
1018 |TANK B
NOTING FOURS 1 |
| |
JREASON REQUIRED (Co TEMPORARY WORK OTHER (Describe)
1 Nor sown on 6m C FIeLO Chane Pons FORM SHELTER
IC ENGINEERING OFFICE CHANGED misPLACeD
[ACTION TAKEN
Is PuRcHASED ey FIELD 8 ACTION BY ENGINEERING oFrICE
JC OUT OF STOCK MATERIAL USED OTHER (Describa)
USIGNATURE
eco [ISSUED BY [RECEIVED BY
JAPPROVED BY:
DATE: TATE:
jold Material ManagementClient: KIPIC Form 000.470.F0011
Project: Al-Zour Project Date 02Dec2016
Project No.: L9ZR Page 1 of 1
all FDH JV
FIELD MATERIAL REGUEST / RETURN (FMR)
DESTINATION
REQUESTED BY: GRAFT lowr FMR NO.NBTC-K214-ME-443
RALPH MECH
DELIVER TO DATE REQUESTED LINENO. [SAT REV
|ASAP
Ces
eee | aty | Sie CONS e soa) eo No aR)
PUMP SKID
[aser, [SPREADER BAR Wi24mm sling
!2Nos,19mm Sling 4Nos Bow Shakles
HoNos
|-=NOTHING FOLLOWS==
REASON REQUIRED Ol TEMPORARY WORK Cl OTHER (Describe)
D0 NoT SHOWN ON BM Cl FIELD CHANGE
ID ENGINEERING OFFICE CHANGE —_L] MISPLACED
JACTION TAKEN
JA PURCHASED BY FIELD B ACTION BY ENGINEERING OFFICE
Ic OUT OF STOCK MATERIAL USED —-D_ OTHER (Describe)
JAPPROVED BY:( cert cae [ISSUED BY RECEIVED BY.
snc —
PRET y DATE: DATE: C~ [pe C02
Copright ® 2010, Fuor Corporation. Al Rights Reserve, Field Material Management