You are on page 1of 4
FDH JV - KIPIC ZOR Project Packages #2 and #3, FDR J Picking Ticket Roms Issued from Catalog to Qbs0Gotine MMT ANTM Kuwait, Middle East Pleling Tieket#: 291659 Description: ISSUED TO NBTO RALPH ; FMR-K205-2042 Materint ni Issue Group: —4-130652-K205 Tessue Data: 27JUL22 tem Code Size 7e-A101 No Size FOAM CONCENTRATE STORAGE FACILITY Dest hse/Lcc: 7eAor1-T-01 Ne Size> (GRP FOAM CONCENTRATE STORAGE TANK & Destwhse/.oe: 7eAMOF-T-NE No Slae> GRP FOAM CONCENTRATE STORAGE TANK 8 Dest/Whse/Loc: Requested Issue Short Qty act ty vom Type ay Oy —Tolssue Issued a T 1.00 00 100 FLD/OFFSITE-LDY FAT 1.00 00 1.00 rub yoysen\ FAT 1.00 00 4.00 FLD/YO1 8-1 lsued By Date 1) nt Name ceived By date 207) Pint Name Reviewed By Print Nema Client: KIPIC Form 000.470.F0011 Project: Al-Zour Project Project to. Lozn PON Dat aber ORIGIN, eFDH UV amt GlINA FIELD MATERIAL REQUEST / RETURN (FMR) [BestiwaTion REQUESTED BY GRAFT [ene FR NO NBTC Kae TB RALPH wecH DELNERTO DATE REQUESTED ——|UINEWO. SF REV las | ‘CONMODITY on Rea ee eos Ta-A-0101 FOAM CONCENTRATE STORAGE FACILITY TEAC | [GRP FOAN CONCENTRATE STORAGE TOA Iran a TEADIOT | | GRP FOAI CONCENTRATE STORAGE] T 1018 |TANK B NOTING FOURS 1 | | | JREASON REQUIRED (Co TEMPORARY WORK OTHER (Describe) 1 Nor sown on 6m C FIeLO Chane Pons FORM SHELTER IC ENGINEERING OFFICE CHANGED misPLACeD [ACTION TAKEN Is PuRcHASED ey FIELD 8 ACTION BY ENGINEERING oFrICE JC OUT OF STOCK MATERIAL USED OTHER (Describa) USIGNATURE eco [ISSUED BY [RECEIVED BY JAPPROVED BY: DATE: TATE: jold Material Management Client: KIPIC Form 000.470.F0011 Project: Al-Zour Project Date 02Dec2016 Project No.: L9ZR Page 1 of 1 all FDH JV FIELD MATERIAL REGUEST / RETURN (FMR) DESTINATION REQUESTED BY: GRAFT lowr FMR NO.NBTC-K214-ME-443 RALPH MECH DELIVER TO DATE REQUESTED LINENO. [SAT REV |ASAP Ces eee | aty | Sie CONS e soa) eo No aR) PUMP SKID [aser, [SPREADER BAR Wi24mm sling !2Nos,19mm Sling 4Nos Bow Shakles HoNos |-=NOTHING FOLLOWS== REASON REQUIRED Ol TEMPORARY WORK Cl OTHER (Describe) D0 NoT SHOWN ON BM Cl FIELD CHANGE ID ENGINEERING OFFICE CHANGE —_L] MISPLACED JACTION TAKEN JA PURCHASED BY FIELD B ACTION BY ENGINEERING OFFICE Ic OUT OF STOCK MATERIAL USED —-D_ OTHER (Describe) JAPPROVED BY:( cert cae [ISSUED BY RECEIVED BY. snc — PRET y DATE: DATE: C~ [pe C02 Copright ® 2010, Fuor Corporation. Al Rights Reserve, Field Material Management

You might also like