Our Ref: POSB/DW/2022/002

Date : 8 August 2022

Daiwa House Malaysia Logistic Sdn Bhd


K03-13-02, Level 13, Tower 3,
UOA Business Park,
No. 1, Jalan Pengaturcara U1/51A, Seksyen U1,
40150 Shah Alam,
Selangor Darul Ehsan.

Attention : Mr. S. Yamamoto

Dear Sir,

PREPARATION OF DUE DILIGENCE REPORT FOR DEVELOPMENT OF LOT 1902, LOT 1903, LOT
1904, LOT 1905 & LOT 1906 FOR DAIWA HOUSE MALAYSIA LOGISTIC SDN BHD AT KLANG,
SELANGOR, MALAYSIA

- FEES PROPOSAL AND SCOPE OF WORKS – FEASIBILITY STUDY

As requested, we have the pleasure to submit herewith our scope of works and proposal of professional fee for the
above development for your kind consideration and acceptance: -

A. Architectural Scope of works.


B. C&S Engineering Scope of works.
C. Town Planning Scope of work.
D. M&E Engineering Scope of works.
E. Surveyor Scope of works.

We hope that our proposal will meet with your requirement and we look forward to service you with our best
effort.

Thank you.

Yours faithfully,
Perunding Orion Sdn Bhd

Ir Tommy Tee
Managing Director
A. ARCHITECTURAL SCOPE OF WORKS

1) ascertaining the client’s objectives, brief and constraints for the development (subject to finding
of town planner)

2) advising on general building layout concept.

B. CIVIL & STRUCTURAL ENGINEER’S SCOPE OF WORKS

To assist in obtaining Preliminary Pre-Consultation’s consent / comments from relevant Local Authority
as required;

i. Air Selangor (Water Works Dept.)


ii. IWK (Sewerage)
iii. JPS (Irrigation Dept.)

C. TOWN PLANNING SCOPE OF WORK

1) To assist in obtaining Preliminary Pre-Consultation’s consent / comments from relevant Local


Authority as required;
i. Land Office
ii. Planning Dept of MBSA

2) To get information regarding planning requirement, access and etc.

D. MECHANICAL & ELECTRICAL ENGINEER’S SCOPE OF WORKS

To assist in obtaining Preliminary Pre-Consultation’s consent / comments from relevant Approving


Authorities as required;

i. TNB (Electricity)
ii. SKMM (Telecommunication)

E. SURVEYOR SCOPE OF WORKS

1) Demarcation Survey to determine the external boundaries of the lots.


2) Details and spot level survey to pick-up all visible salient features existing within the immediate
vicinity including all the structural beams, columns, etc. Spot levels shall be taken at suitable
interval. The invert levels of existing drains and sectional details of drain shall also be included.
3) Preparation of the survey drawing showing the scale co-ordinates of the plot boundary;
4) Planting of two (2) TBM.

G. CONSULTATION FEE PROPOSAL

Our proposed consultancy fee is lump sum of RM 49,926.00 (Ringgit Malaysia Forty Nine Thousand
Nine Hundred and Twenty Six only) inclusive 6% of SST.

Please refer to the Attachment ‘A’ for detailed breakdown.


ATTACHMENT A

Fees (RM)
Part A – Architecture 12,000.00
Part B – Civil and Structure 10,000.00
Part C – Town Planner 12,000.00
Part D – Mechanical and Electrical 3,000.00
Part E – Surveyor 10,100.00
+6% SST 2,826.00
TOTAL 49,926.00