24 Hour SIT Program Overview

11.0 SAFETY

11.1 Deluge System

Deluge System for flaring Port Side Starboard Side


Pressure
Height of Spray
Width of Spray

Description YES/NO
Test fire monitors at cantilever BOP area

Description YES/NO
Test fire monitors and deluge system at
rig floor area

Description YES/NO
Test fire monitors at Helideck

11.2 Additional Safety Auditing

Description YES/NO
Permit To Work (PTW) in place
Job Safety Analysis (JSA) and record
keeping
Risk Assessment
Isolations system (Lock out / Tag out
Mechanical and Electrical) and methods
of control, record keeping and integration
with the PTW system
Lifting Equipment and Padeye Registers
in place
Safety and Fire plan
Implementation of Safety Case
Maintenance instruction for Safety
Critical Equipment in place
Written procedures (BOP testing, work
instructions)
Certification of life saving equipment
Review the training matrix and assess rig
crew safety and trade training and
qualifications
Emergency procedures - Perform drills
and check all alarms
Noise survey records
Distress and safety radio communications
24 Hour SIT Program Overview
Hygiene – hospital, accommodation,
galley, dry and cold stores
Hospital inventory checked and MSDS
database on hand
COSHH, are dedicated lockers maintained
with MSDS in place
Check register of PRV’s and that all PRV's
have been tested in the past two (2)
years
Inspect Derrickmans escape line &
certification
Dropped Object Survey reports
Observe Lifeboats launching, testing and
recovery

11.3 Safety Hardware

Description YES/NO
Time for emergency generator to come
on line
Test fire pumps while on Emergency
Power
Test Accommodation alarm system
Accommodation (HVAC) shutdown
system
Random test the fire, smoke and gas
detectors
Helideck in compliance with Cap 437
Check emergency lighting
Check battery operated emergency
lighting
Check if air receivers are holding
pressure in black-out situation or when
air compressors are switched off
Check signs and instruction such as
colour codes are displayed in all work
areas
Access and fall protection (ladders,
stairs, handrails etc)
BA sets
H2S detection including portable
equipment
PPE (sufficient quantity and correct type)
PA system

Page 2 of 2