You are on page 1of 1
Day the Moy 209 4, a) State three principles of Tort Law that must be satisfied inorder (6 marks) to substantiate a tort action. (9 marks) b) The original contract was signed in the sum of. HK$76,500,000.00 with the adjustments as summarized as follows: / > The area of the library is enlarged due to changes in design, requiring an addition of $285,000.00 > The provisional sum for Skylight is $350,000.00 but now the Skylight is no longer required as per Engineer’s Instruction, 3 > The Contractor replaced some materials which was not stored properly by him costing $100,000.00. # > The Engineer issued instruction to change the door type for classrooms, saving $75,000.00 5, > Claim for Loss & Profit submitted by the Contractor is approved by the Engineer and the amount claimed is $250,000.00 Calculate the final contract sum based on the above information. ° (10 marks) The construction project is delayed due to adverse weather conditions. Briefly describe the type of claim that should be submitted by the contractor in avoiding liquidated damages. —————5.—a)Deseribe~four“funetions~of-a~Specification-in-a-construction—(12-matks)— contract, b) List six kinds of document or information for the preparation of (3 marks) Specification. c) List the stages of an arbitration proceeding and describe any (10 marks) four advantages of using arbitration in resolving construction disputes. ‘Construction Contract and Administration (CON3372) Page 4 of 4 AY 2017/2018 Semester 2 Exam (EG114101) FT

You might also like