You are on page 1of 1

P28

CL
4.00

139 5.00 2.00 5.00 0.50 3.00 0.50 7.50 2.00 5.95
Perkerasan Kerikil
138 t = 0.20 m
EL.+137.59
137 Wet Stone Masonry Grass Block
( 1 pc : 4 sand )
136 Weep Hole PVC D= 5 cm

135 5.00 5.00

134

133
EL.+132.59 EL.+132.59
132
Wet Stone Masonry Grass Block
( 1 pc : 4 sand ) Embankment (SoilCement)
131 Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
3.75 3.96
130
Tanah Asli
129 EL.+128.84
Bidang Persamaan 1.00
128 EL.+127.84 Stripping t = 25 cm
Reference Level
DATUM : +127.00
128.783

128,233

128,384

128,149

128,037
0,40 128,531

128,263

128,023

128,475

128,489

127,471
0,20 127,439
0,60 128,049

128,039

128,039
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)

0,80

0,20
12,00 10,00 1,50 2,10 8,00 1,00 5,30 1,20 6,00
DISTANCE (m)

P29
CL
4.00

5.00 2.00 5.00 0.50 3.00 0.50 7.50 2.00 6.71


139 Perkerasan Kerikil
t = 0.20 m
138 EL.+137.91
Wet Stone Masonry Grass Block
137 ( 1 pc : 4 sand )

136 Weep Hole PVC D= 5 cm


5.00 5.00
135

134

133 EL.+132.91 EL.+132.91

132 Wet Stone Masonry Grass Block


( 1 pc : 4 sand ) Embankment (SoilCement)
131 Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
4.37 4.47
130
Tanah Asli
129
EL.+128.54
Bidang Persamaan
128 1.00
Reference Level EL.+127.54 Stripping t = 25 cm
DATUM : +127.00
128,537

128,740

128,291

128,377
0,30 128,783

128,541

128,417

128,297

128,512
128.137

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
15,00 10,00 1,20 1,90 10,00 10,00 10,00 5,00
DISTANCE (m)

P30
CL
4.00

5.00 2.00 5.00 0.50 3.00 0.50 7.50 2.00 7.05


Perkerasan Kerikil
139
t = 0.20 m
EL.+138.23
138
Wet Stone Masonry Grass Block
( 1 pc : 4 sand )
137
Weep Hole PVC D= 5 cm
136
5.00 5.00
135

134
EL.+133.23 EL.+133.23
133
Wet Stone Masonry Grass Block
132 ( 1 pc : 4 sand ) Embankment (SoilCement)
Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
131 4.35 4.70
130
Tanah Asli
129 EL.+128.88
Bidang Persamaan 1.00
128 EL.+127.88 Stripping t = 25 cm
Reference Level
DATUM : +127.00
128,945

128,869

128,890

129,129

128,646

128,507

128,349
128.742

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)
10,00 10,00 10,00 2,50 10,00 10,00 9,00
DISTANCE (m)

Propinsi :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SULAWESI TENGAH
DIREKTORAT JENDERAL SUMBER DAYA AIR
SNVT PELAKSANAAN JARINGAN SUMBER AIR PPK SUNGAI DAN PANTAI III
WS. PALU - LARIANG, WS. PARIGI - POSO, WS. KALUKU - KARAMA
Jl. Abdul Rachman Saleh No.230 Palu 94114 Phone/Fax (0451) 482147 Pekerjaan :
Gambar MC1:
Cross Section P.27 ~ P.29 PROJECT RIVER IMPROVEMENT AND SEDIMENT
CONTROL IN BANGGA RIVER
Tanggul / Inspection Road

Project Manager Ir. Anang Widodo


Kabupaten : Sigi
Dibuat Nomor Lembar : 13
Direktur Jeffry E. Letsoin Nomor Register :
0 5.0 10.0 15.0 20.0 25.0 m PT. SELARAS MANDIRI SEJAHTERA

Pengawas Lapangan Makmur Bamojai Tanggal :


SCALE 1 : 250
Disetujui Pelaksana Teknis Muh. Fadhlurrahman .H No. Kontrak Tanggal

No. PPK.Sungai & Pantai III Harianto, ST, M.Sp HK.0201/


Tgl. Yang direvisi Oleh Direnc. Diset. PPK-SDPIII-PJSA.ST-BWS13/02 02 SEPTEMBER 2020
Rev.
Disahkan Ka. SNVT PJSA Radia Zulfikar, ST., M.T.