Professional Documents
Culture Documents
CL
4.00
139 5.00 2.00 5.00 0.50 3.00 0.50 7.50 2.00 5.95
Perkerasan Kerikil
138 t = 0.20 m
EL.+137.59
137 Wet Stone Masonry Grass Block
( 1 pc : 4 sand )
136 Weep Hole PVC D= 5 cm
134
133
EL.+132.59 EL.+132.59
132
Wet Stone Masonry Grass Block
( 1 pc : 4 sand ) Embankment (SoilCement)
131 Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
3.75 3.96
130
Tanah Asli
129 EL.+128.84
Bidang Persamaan 1.00
128 EL.+127.84 Stripping t = 25 cm
Reference Level
DATUM : +127.00
128.783
128,233
128,384
128,149
128,037
0,40 128,531
128,263
128,023
128,475
128,489
127,471
0,20 127,439
0,60 128,049
128,039
128,039
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0,80
0,20
12,00 10,00 1,50 2,10 8,00 1,00 5,30 1,20 6,00
DISTANCE (m)
P29
CL
4.00
134
128,740
128,291
128,377
0,30 128,783
128,541
128,417
128,297
128,512
128.137
JARAK (m)
15,00 10,00 1,20 1,90 10,00 10,00 10,00 5,00
DISTANCE (m)
P30
CL
4.00
134
EL.+133.23 EL.+133.23
133
Wet Stone Masonry Grass Block
132 ( 1 pc : 4 sand ) Embankment (SoilCement)
Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
131 4.35 4.70
130
Tanah Asli
129 EL.+128.88
Bidang Persamaan 1.00
128 EL.+127.88 Stripping t = 25 cm
Reference Level
DATUM : +127.00
128,945
128,869
128,890
129,129
128,646
128,507
128,349
128.742
JARAK (m)
10,00 10,00 10,00 2,50 10,00 10,00 9,00
DISTANCE (m)
Propinsi :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SULAWESI TENGAH
DIREKTORAT JENDERAL SUMBER DAYA AIR
SNVT PELAKSANAAN JARINGAN SUMBER AIR PPK SUNGAI DAN PANTAI III
WS. PALU - LARIANG, WS. PARIGI - POSO, WS. KALUKU - KARAMA
Jl. Abdul Rachman Saleh No.230 Palu 94114 Phone/Fax (0451) 482147 Pekerjaan :
Gambar MC1:
Cross Section P.27 ~ P.29 PROJECT RIVER IMPROVEMENT AND SEDIMENT
CONTROL IN BANGGA RIVER
Tanggul / Inspection Road