You are on page 1of 1

Q10 +107.

26
2.00
Q5 +107.09
Q2 +106.78
109 0.30 109
Keterangan :
5.00
105 105 Nspt = 6
1.50 1.75
2.00
0.55
Nspt = 20 = Pasir Halus Lanauan
4.05
2.05
Nspt = 20
100 Mini Pile, 20x20, L= 6 m 100
Nspt = 24
= Pasir Halus Lempungan
Kupasan = 0.00 m2
Nspt = 20
Galian = 0.00 m2 95 95 Nspt = 16
= Pasir Kasar Krikilan
Timbunan = 0.00 m2 Nspt = 24
Beton K-250 = 0.00 m2 Nspt = 22
90 90 = Lempung
Nspt = 32
Nspt = 40
85 85 Nspt = 12 = Pasir Kasar

bidang persamaan Nspt = 16


reference level
80 80
108.281

108.450

108.507
106.091

105.854

105.281

104.500

104.428

104.572
105.315
106.694

106.631

106.644

106.304

105.500

105.670
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)
0.83

2.08
0.57
17.32 24.51 12.58 7.57 15.24 9.58 6.92 9.08 14.47 5.60 7.22 8.22
DISTANCE (m)