PRESSURE VESSELS, BOILERS, HEAT PUMPS AND ACCESSORIES
# SUBJECT ACTIVITY RESPONSIBILITY 1 BOILER DESIGN DESIGN OF BOILER AS PER ASME, CE, IBR, CHINESE JR.JO 2 OIL FIRED DESIGN OF BOILER AS PER ASME, CE, IBR, CHINESE 3 LPG FIRED 4 BIO MASS- WOOD 5 BIO MASS BAGASSE 6 CALORIFIER 7 DAY WATER TANK 8 DAY OIL TANK 9 MAIN FUEL TANK 10 CHIMNEY STACK 11 INDUCED DRAFT FAN 12 FORCED DRAFT FAN 13 BOILER MANAGEMENT CONTROL PANEL 14 BURNER MANAGEMENT CONTROL PANEL. 15 BOILER MOUNTINGS 16 BOILER TESTING 17 BOILER COMMISSIONING 18 BOILER CERTIFICATIONS 19 LPG TANKS DESIGN OF AS PER ASME, CE, IBR, CHINESE 20 DESIGN CALCULATIONS, SOFT WARE, SOFT WARE FOR NOZZLES, DISHED CALCULATIONS ENDS DESIGN, SADDLE DESIGN CALCULATIONS FOR DIAMETER TO LENGTH RATIO AND PLATE THICKNESS CALCULATIONS DESIGN ECONOMIC OPTIMISATION CALCULATIONS DISHED ENDS DESIGN, TORISPHERICAL, ELLIPSODIAL, SPHERICAL CALCULATIONS LPG TANK MOUNTINGS: PRESSURE GAUGE, TEMPERATURE GAUGE, LEVEL GAUGE,PRESSURE RELEASE VALVE, LPG LOADING VALVE, LPG DRAWDOWN VALVE, BOTTOM LOADING VALVE, BOTTOM DISCHARGE VALVE. FIRE WATER SPRAY SYSTEM, SPRAY NOZZLES, PRESSURE PUMP, SUPPRESSION WATER QUANTITY CALCS, SYSTEM GAS LEAK INSTRUMENTATION DETECTION SYSTEM LPG INVENTORY INVENTORY SYSTEM SAFETY AS PER NFPA DISTANCE