Professional Documents
Culture Documents
TEST 2
SEMESTER I
SESSION 2020/2021
DURATION : 1 HOUR
NAME :
MATRIC NO :
SULIT
SULIT BFB40603
Q1 (a) The lift control system is the system responsible for coordinating all aspects of elevator
service such as travel, speed, and accelerating, decelerating, door opening speed and
delay, leveling and hall lantern signals.
(i) With the aid of a diagram, compare the difference between up collective control
method and directional collective control method of a lift control system in a
building.
(9 marks)
(ii) Propose a suitable lift control method for an apartment building complete with a
shopping complex at the lowest level of the apartment and car park at the highest
level of the apartment. Justify your proposal.
(5 marks)
(b) A good safety practice in handling electricity works is very important. Explain Four
(4) types of safety elements in electrical works.
(4 marks)
(c) With the aid of a diagram, propose a suitable energy efficient rainwater harvesting
system for a typical 2 storey house in Batu Pahat. Justify your proposal.
(7 marks)
END OF QUESTION
2 SULIT
SULIT BFB40603
ANSWER SHEETS
3 SULIT
SULIT BFB40603
4 SULIT
SULIT BFB40603
5 SULIT