DEPARTMENT OF'ENERGY
(Kagawaran ng Enerhiya)
WHEREAS, Section 37 of the Electric Power lndustry Reform Act of 2001 (EPIRA)
mandates the Department of Energy (DOE) to supervise the restructuring of the
electric power industry and, among others:
WHEREAS, on 28 June 2002, the DOE, with the endorsement of the electric power
industry participants, promutgated the Wholesale Electricity Spot Market (WESM)
Rules through Department Circular No. DC2002-06-003, which mandates the Market
Operator to provide and submit market data and information to the DOE through
WESM Rules Clause 5.2.'1.5;
WHEREAS, on 26 February 2010 and 17 April 2015, the DOE issued Department
Circular Nos. DC2010-03-0003, entitled "Directing All Power Generation Companies,
the Transmission Service Provider, and All Distribution Utilities to Ensure Adequate
and Reliable Electric Power Supply in the Country" and DC2015-04-0002 entitled
"Directing All Generation Companies, Distribution Utilities and lndependent Power
Producer Administrators to Submit to the Department of Energy Reportorial
Requirements and Other Pertinent Data as may be Required for the Formulation of
the Power Supply Demand Forecasts of the Power Development Plan," respectively,
directing National Grid Corporation of the Philippines, all Generation Companies,
Distribution Utilities, and lndependent Power Producer Administrators, to submit to the
DOE reportorial requirements and other pertinent data as may be required for the
Power Development Plan;
WHEREAS, on 06 May 2013, the DOE issued Department Circular No. DC2013-05-
0006 enjoining all Generation Companies, Distribution Utilities, Supplier and Local
Energy Center, Rizal Drive cor. 34th Street, Bonifacio Global City, Taguig City, Philippines 1632
J
ate
Tel. No. (Trunkline) (632) 479-2900i
'( Webs e: http:/A/vww doe.gov.ph; E-mail info@doe.gov.ph
r
Suppliers to ensure an effective implementation of Retail Competition and Open
Access which include submission of compliance reports to the DOE;
WHEREAS, the DOE requires the electric power industry participants to submit
reports, data, and information for evidence-based policy development, energy
planning and monitoring of plans and programs to ensure the attainment of the goals
of the EPIRA;
WHEREAS, the DOE deems it necessary to review the policies, adopt a systematic
submission process and enhance the level of compliance of the electric power industry
participants to the reportorial requirements while at the same time addressing their
concerns on redundancies, inconsistencies, different interpretations of the data, and
difficulty in the submission and processing of the data;
WHEREAS, in April 2021, the DOE conducted pilot testing with the participants for
their familiarization in the use of DEPDMS web portal and to test the reliability and
efficiency of the entire system under its operating conditions prior to full-scale
implementation;
WHEREAS, the DOE, in consideration of the inputs gathered during the consultative
meetings and pilot testing, formulated a draft circular for providing policies on the
management of DOE reportorial requirements which was subjected to virtual public
consultations on various dates as follows:
NOW THEREFORE, pursuant to its statutory mandate under the EPIRA and the
preceding premises considered, the DOE hereby issues, adopts and promulgates the
following:
I
DC -
PROVIDING POLICIES FOR THE EFFECTIVE AND EFFICIENT MANAGEMENT OF
THE DOE REPORTORTAL REQUTREMENTS FoR ELECTRTC PowER INDUSTRY PARTICIPANTS
{ t
t' Q)r/u
1 .2 All submissions shall be made through automatic, paperless, and/or digital
transformation using structured data templates and formats, provided,
transition period and/or exemptions may be allowed under circumstances
provided for in this policy;
1.3 All data and information required shall be used exclusively for the purpose
of policy development, energy planning, and monitoring unless otherwise
specified in a separate requirement from the electric power industry
participanUs; and
Section 2, Coverage. This Circular shall cover the following Electric Power lndustry
Participants:
Section 3. Registration to the DEPDMS Web Portal. Within 15 calendar days from
the effectivity of this Circular, all Electric Power lndustry Participants subject of this
circular shall submit to the DOE, through a letter or any equivalent document
endorsing its registration to the DEPDMS Web Portal the following information:
Section 4. Responsibilities of
Designated Representatives. The duly
authorized/designated personnel shall have the following duties and responsibilities:
4.2 Ensure timely and complete submission of the required reports through
the DEPDMS web portal, or alternative modes allowed in cases of force
majeure events;
4.3 ln cases of changes to earlier submitted reports, coordinate with the DOE
through a written request issued by its Electric Power lndustry Participant
represented for any revision of previously submitted report; and
4.4 lnform its Electric Power lndustry Participant of any changes or updates
on policies relative to the implementation of this Circular.
5.1 All submission of reports by the Electric Power lndustry ParticipanUs shall
be done using the data structures and standard templates detailed in the
annexes of this circular as follows:
DC -
PROVIDING POLICIES FOR THE EFFECTIVE AND EFFICIENT MANAGEMENT OF
s THE DOE REPORTORIAL REQUIREMENTS FOR ELECTRIC POWER INDUSTRY PARTICIPANTS 4/8 /
7{ffi
5.3 Distribution Utility owning a generator resource such as embedded
generators, shall comply and submit a separate report for the said
generator resource using the MOR for Generation Companies data
templates as specified in Annexes B.1, 8.2, 8.6, 8.7, and B.8; and
Section 11. Transitory Provision. Within six (6) months from the effectivity of this
Circular, the DOE through the Electric Power lndustry Management Bureau shall
undertake and conduct necessary activities to facilitate training and roll out of the
DEPDMS web portal to the electric power industry participants. During the same
period, all reportorial requirements prescribed under this Circular shall be submilted
to the EP|N.4B in either hard copies or through the dedicated email address provided
by the EPlNilB, as part of the trial operations of the web portal. Thereafter, upon the
DC -
PROVIDING POLICIES FOR THE EFFECTIVE AND EFFICIENT IIIANAGEI\,IENT OF
'I
THE DOE REPORTORIAL REQUIREMENTS FOR ELECTRIC POWER INDUSTRY PARTICIPANTS , 5/s 2
?t@1
full operationalization of the DEPDMS web portal, the online submission of files shall
be mandatory.
Forthis purpose, the DOE-EPIMB shall issue an Advisoryto all affected Electric Power
lndustry Participants on the date of the effectivity of the regular submission to the
DEPDMS Web Portal and the cessation of the submissions of the reportorial
requirements stated above.
Section 13. Confidentiaiity. All data submitted through the DEPDMS Web Portal and
other alternative means shall be treated with utmost confidentiality. The gathered
information shall be solely used for the DOE's monitoring, planning and policy
development and shall not in any way be used as evidence in court and other
administrative proceedings.
Section 15. Repealing Clause. All previous DOE issuances inconsistent with this
Circular are hereby repealed or amended accordingly.
Section 16. Separability Clause. lf for any reason, any section or provision of this
DC is declared unconstitutional or invalid, such parts not affected shall remain valid
and subsisting.
{
DC _ PROVIDING POLICIES FOR THE EFFECTIVE AND EFFICIENT I\iIANAGEMENT OF
THE DOE REPORTORIAL RE FOR ELECTRIC POWER TNDUSTRY PART'CtrANTS 7 /8 p,
t' SUTREMENTS fr
Section 17. Effectivity. This Circular shall take etfect fifteen (15) days following its
complete publication in at least two (2) newspapers of general circulation and shall
remain in effect until othenrise revoked. Copies thereof shall be filed with the
University of the Philippines Law Center - Office of National Administrative Register
(UPLC-ONAR).
lssued tnis FF B 0 I 2bbb at the DOE, Energy Center, Rizal Drive, Bonifacio
Global City, Taguig City, Metro Manila.
clJst
V
EH,.1fi#"li.l#l"En"
DOE-AGC-22000373
1
DC -PROVIDING POLICIES FOR THE EFFECTIVE AND EFFICIENT MANAGEMENT OF
8/8 ,
i t--
THE DOE REPORTORIAL REOUIRE MENTS FOR ELECTRIC POWER INDUSTRY PARTICIPANTS
@s
ANNEXA-DATACATALOGUE
1
The cover period for Monthly submission storts from the 26th of the previous month to the 25th of the
succeeding month / billing period
2
Q.uorterly submissions sholl contoin monthly doto (i.e., 1't quorter - Jon, Feb, Morch dotosets)
Page t of 27
(
i 3
COJ
I
ANNEXA-DATACATALOGUE
Page 2 of 27
j
( 3 @ (
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
B1.1 DEFINITIONS FOR MONTHLY OPERATIONS REPORT PLANT
OPERATIONAL DATA
FIELD
DESCRIPTION
NAME
Registered resource lD used in the Wholesale Electricity Spot
Resource lD
Market (WESM).
Administrative region (e.9., Region l, NCR, CAR, Region lV-A,
Sub-region
Region Vll, BARMM)
Rated The full-load continuous gross capacity of a unit under the specified
Capacity3, conditions, as calculated from the electric generator nameplate
MW based on the rated Power Factor.
Maximum The maximum demand in MW that a generating unit, or generating
Stable Load block or module in the case of a combined cycle power plant, can
(Pmax)4, reliably sustain for an indefinite period of time, based on the
MW generator capability tests.
Gross
Amount of energy generated as metered, by a unit in a given billing
Generation,
period which include station used.
MWh
Total Station Part of the generated energy used to power loads within plant
Used, M\Mt facility in a qiven billing period.
Operating
Total number of hours in in-services state in a given billing period
Hours
Forced
Total number of hours a unit was Forced outage state in a given
Outage
billing period.
hours3
Planned
Total number of hours a unit was in planned outage state in a given
Outage
billing period. (GOMP)
hours3
Reserve The number of hours a Unit was in the reserve shutdown state
Shutdown (State in which a Unit is available but not in service or not
Hours3 electrically connected to the Grid.
Maintenance
Total number of hours a unit was in maintenance outage state in a
Outage
given billing period.
hours3
Deactivated
Total number of hours a unit was in deactivated shutdown state in a
Shutdown
given billing period.
hours3
Type of fuel used. Can be multiple types for a single generation
Type of Fuel unit. (specify the type of fuels to choose from e.g. Bunker/Diesel,
Coal, NG, Biomass)
Fuel Amount of fuel consumed during the billing period.
Consumed L(Bunker/Diesel) or ton(Coal) or m3(NG) or kg(bio4qqq)
3
GC 1.7 (DEFINITIONS), Philippine Grid Code 2015
a
Section 4 (Definition of Terms), ERC Resolution No. 16 Series of 2014
s
Article ll, Section 1 (Unit State Classification), ERC Resolution No. 21 Series of 2016
Page 3 of 27
r I q rt'
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
81.1 DEFINITTONS FOR MONTHLY OPERATIONS REPORT PLANT
OPERATIONAL DATA
Fuel
Total stocks of fuel equivalent or running inventory including
Running
shipments in transit. L(Bunker/Diesel) or ton(Coal) or m3(NG) or
Inventory
(units) kg(biomass)
Fuel
Total stocks of fuel equivalent or running inventory including
Running
shipments in transit in estimated number of days of normal power
lnventory
plant operation.
(davs)
Unit price of fuel used. PHP/L(Bunker/Diesel) or PHP/ton(Coal) or
Fuel Cost
PHP/m3(NG) or PHP/kq(biomass)
Gross Heat
The heat energy in BTU, input to a Generating Station to deliver
Rate,
one KWh at the generator.
BTU/KWh
Net Heat
The heat energy in BTU, input to a Generating Station to deliver
Rate,
one KWh at the switchyard.
BTU/KWh
Page 4 of 27
? I @t
\,.
Maximum
'Reserve Maintenance
Stable Gross Total Planned
Resource Operating Outage
toad Generation, Station Outage Shutdown
Hours Hours
(Pmar), MWh Used, MWh hours Hours
MW
EOF
Net Heat
Rate,
BTU/KWh vl
PageS oI 27
N
'rs
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
82.1 DEFINITIONS FOR IIIIONTHLY OPERATIONS REPORT - GENERATION
AND SALES DATA
FIELD NAME
Registered resource lD used in the Wholesale
Resource lD
Electricity Spot Market (WESM).
Administrative region (e.9., Region l, NCR,
Sub-region
CAR, Region lV-A, Region Vll, BARMM)
Electricity Purchased From (if Source of electricity purchased (e.9., WESM,
applicable) Specific IPP) as stated in the contract
Amount of energy purchased from
Electricity Purchased, MWh corresponding source that is billed in a given
billins period.
Total Plant Operating and Amount of plant operating and maintenance
Maintenance Cost, PHP cost in pesos in a given billing period.
Customer Type Types of Customer (e.9., DU, EC, RES, DCC)
Name of customer supplied. (e.9., Specific
Customer List
Name of DU, EC, RES, DCC)
Demand per customer list as stated in the
Contracted Demand
contract
Energy per customer list as stated in the
Contracted Energy
contract
Page 6 of 27
I 7
q-r
N
(if applicable)
F
EOF
-,
PageT of 27
€
1,.)
ANNEX B. DATA DEFINITIONS AND DATA TEMPLATES
83.1 DEFINITIONS FOR MONTHLY OPERATTONS REPORT - DISTRIBUTION
UTILITIES
Page I of 27
.f,'
J
% (
!"
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
83.1 DEFINITIONS FOR MONTHLY OPERATIONS REPORT. DISTRIBUTION
UTILITIES
FIELD NAME DESCRIPTION i
Maximum Load, MW DU's system peak load during the billing period
Page 9 of 27
t
3
% ?o
sF, $
.Demand LrEs.lLrry
From J
Price End '
,L
F
L
-
Page 10 of27
€
tc
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
84.1 DEFINITIONS FOR MONTHLY OPERATIONS REPORT . SUPPLIER
PORTFOLIO DATA
FIELD NAME
Participant lD Participant lD registered in the WESM
Administrative region (e.9., Region l, NCR, CAR,
Sub-Region
Resion lV-A, Reqion Vll, BARMM)
Source of the electricity purchased by the Supplier.
Electricity Purchased
(e.9., WESM, specific name of lPPs, embedded
From qenerators) as stated in the contract
Types of energy resource of plants used to generate
Resource Type
electricity per supply source
Demand of Supplier as stated in the contract per
Contracted Demand (MW
supply source
Energy of Supplier as stated in the contract per
Contracted Energy (MWh)
supply source
Contract Price Price per KWh as stated in the contract per supply
(PHP/KWh) source
Contract Start Start date of contract per supply source (yyyy-mm-dd)
Contract End End date of contract per supply source (yyyy-mm-dd)
Generator affiliated to Confirmation of affiliation of the Generation Company
Supplier to the Supplier (Y/N)
Page lL of 27
0
%
! i
f
\ 5
EOF
Page tZ of 27
't=
s
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
85.1 DEFINITIONS FOR MONTHLY OPERATTONS REPORT - SUPPLIER SALES
DATA
FIELD NAME
Participant lD Participant lD registered in the WESM
Administrative region (e.9., Region l, NCR, CAR,
Sub-Region
Resion lV-A, Resion Vll, BARMM)
Name of each contestable customer (CC) as
Contestable Customer Name
stated in the contract
Contracted Demand (MW) Demand of each CC as stated in the contract.
Page 13 of 27
I
% ( i
S<) qt\
$
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
B5.2 MONTHLY OPERATIONS REPORT - SUPPLIER SALES DATA
Contracted
EnergY,
EOF
Page 14 ol 27
ta
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
86.1 DEFINITIONS FOR SHORT RUN MARGINAL COST DATA
Page t5 of 27
I
t
@ Ia
ANNEX B - DATA DEFINTTIONS AND DATA TEMPLATES
86.1 DEFINITIONS FOR SHORT RUN MARGINAL COST DATA
a
Page 15 of 27
o
S
ffi ?u
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
86.1 DEFINITIONS FOR SHORT RUN MARGINAL COST DATA
CATEGORY . i .
.
FIELD]NAME.
lndex Price location or user-defined
blend.
Energy Source Price The delivered cost of the fuel in
PhP/MMBtu PhP/MMBtu if purchased on the price
date below for immediate delivery
(spot market price).
Energy Source Price The date of the price above (optional if
Date YYYY-MM-DD price is null).
Energy Source Price It is the commodity price index and
lndex publisher of the index appropriate for
use in adjusting reference levels to
reflect changes in fuel price. This field
is to be used if the "Energy Codes" tab
lacks an adequate index and it is
desired to suqqest an alternative.
Energy Source Reason Field for describing the reason why
one energy source is used instead of
another.
lncremental Energy Code Energy Source Code from contract or
Energy power plant indicating lndex Price
lnformation location or user-defined blend.
MW Required field specifying the operating
point in MW. Unit should have
between two and ten MW specified for
incremental energy range
calculations.
Ramp Rate Up Required field specifying the rate in
MW per minute to go from the next
lower operating point to this operating
point when the previous market
dispatch direction was up.
Ramp Rate Down Required field specifying the rate in
MW per minute to go from this
operating point to the next lower
operating point when the previous
market dispatch direction was down.
Bidirectional Ramp Rate Required field specifying the rate in
MW per minute to go between this
operating point to the next lower
operating point or the next lower
operating point to this operating point
when the previous market dispatch
direction was in the opposite direction.
Fuel Consumption Required field for fossil fuel units
mmbtu per Hour specifying the total fuel consumption
Page 17 of 27
J
J
@(?
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
86.1 DEFINITIONS FOR SHORT RUN MARGINAL GOST DATA
CATEGORY FIELD NAME DESCRTPTION
in MMBtu per hour using the Energy
Source or user specified blend
specified.
VOM Cost, Required field specifying the non-fuel
PhP/h variable operating cost in PhP per
hour. lf not specified, the cost is set to
null. lnclude in this field as negative
values the production tax credits and
renewable energy certificates.
Cost Change Reason Field describing the reason why there
is an inflection in the variable
operatinq costs at the operating point.
MSTUO Field describing MSTUO (Mean
Service Time to Unplanned Outage) at
a specific operating point. (if
applicable)
Page 18 of 27,
J
3
@) i?
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
86.1 DEFINITIONS FOR SHORT RUN MARGINAL COST DATA
CATEGORY FIELD NAME DESCRIPTION
lncremental Lower MW The lower bound of the output range
Energy subject to the limitation in MW. ls
Limitations typically zero unless there is a change
in fuel type, configuration, or
emissions controls that would cause
the limitation to not apply below a
certain MW value.
Upper MW The upper bound of the output range
subiect to the limitation in MW.
Energy Limitation The total energy that can be produced
in MWh subject to the limitation.
Timeframe, The timeframe for the limitation in
days days-e.g., 7 would be entered for a
weekly limitation.
Start Day YYYY-MM-DD The beginning of the period when the
limitation is active. When a limitation
only applies in a given season or
period, the beginning of the season or
period is entered here.
End Day YYYY-MM-DD The end of the period when the
limitation is active. When a limitation
only applies in a given season or
period, the end of the season or period
is entered here.
Reason Detailed explanation of the limitation.
Uncertainty Description of the uncertainty
associated with the limitation (i.e., how
the limitation may change with
changes in certain factors, such as
rainfall).
Fuel Blend Name User provided name for a specific fuel
lnformation blend. This name can then be used
anywhere that Energy Source Codes
are used for this location.
Energy Source Code Energy Source Code from contract or
power plant indicating lndex Price
location or user-defined blend.
Blend Portion of the blend that is made up of
the above Energy Source Code. The
number must be between 0 and 1 and
when added to the blends from the
other parts. must sum to 1.
Ancillary Energy Code Energy Source Code from contract or
Services power plant indicating lndex Price
Values location or user-defined blend.
Page 19 of 27
l
I
@ (,
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
86.1 DEFINITIONS FOR SHORT RUN MARGINAL COST DATA
CATEGORY FIELD NAME .DESCRIPTION . ,
Page 20 of 27,
I
@ ?,
\
EOF
r
^/
.A ,L
r
-
PageZ7 of 27 "r1
/\ o\
J. .L
r
-
r- (PCRDFI
Page22 of 27
.F
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
87.1 DEFINITIONS FOR GOST OF NEW ENTRY DATA
Field Nam6' Description ,'
Resource lD Unique lD of resources in the market
Reoion Unique lD for Reqion (L //M)
Sub-region Administrative region (e.9., Region l, NCR, CAR,
Reoion lV-A, Reoion Vll, BARMM)
Capital Cost lnvestment or capital cost to build the new
resource (PhP/kW)
Carrying Charge Rate (CCR) Carrying Charge Rate is based on the project's
financing assumptions: 1) Debt to Equity ratio, 2)
Cost of debt, 3) Cost of Equity, 4) Amortization
period, 5) Depreciation schedule, and 6) Tax
assumptions. (Percent %)
Fixed Operations and "Fixed Operations and Maintenance costs
Maintenance Costs (FOM) ('FOM') that are required to be expended to
maintain the resource over its economic life.
Page 23 of 27
@ I
I f
\
EOF
Page 24 of 27
le
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
88.1 DEFINITIONS FOR NET REVENUE DATA
Data Name
Resource lD Required field specifying the resource lD location
(commercial node names).
Sub-Region Administrative region (e.9., Region l, NCR, CAR,
Reqion lV-A. Reqion Vll. BARMM)
Full Load Heat Rate, Full Load Heat Rate is the heat rate of operating the
BTU/KWH unit at the maximum stable load (PMAX) Generic
estimate based on size and age of the unit; Value must
be fixed the entire year.
MinGen Heat Rate, Min Gen Heat rate is the heat rate of operating the unit
BTU/KWH at the minimum stable load (PMIN).
Based on mingen cost. (The mingen cost is the hourly
cost of operating the unit at the minimum stable load
(PMIN)) Generic estimate based on size and age of the
unit
Startup Cost, in Php Generic estimate based on size and age of the unit;
Start up cost reflects the starts-related maintenance
costs as specified in the bilateral contracts
Page 25 of 27
@t ip
ANNEX B - DATA DEFINITIONS AND DATA TEMPLATES
B8.1 DEFINITIONS FOR NET REVENUE DATA
Data Name Description
Going Fonruard Costs Generic estimate based on size and age of the unit;
(GFC), PhP/kW-yr Going Fonruard Costs (GFC)
GFC includes costs that could be avoided if a seller
othenrvise capable of supplying capacity were to retire
permanently from supplying the capacity. GFC
typically includes cost items such as: (a) Capital
Expenditure, including but not limited to mandatory
expenditures necessary to comply with federal or state
environmental, safety or reliability requirements that
must be met to supply capacity, (b) Fixed Costs, and
(c) Taxes
Feed in Tariff (FlT) Feed in Tariff Price. Only applicable for renewable
Price, Php/MWh enerqv technolooies.
Renewable Energy Renewable Energy Certificate Price = Hourly CF*REC
Certificate (REC) Price, Price*PMAX
Php/MWh
Fuel Price Gas Price (Php/kg) daily-Required field is comprising of
daily Gas Price information for delivery in the region.
Has to reflect prices for specific location and timeframe
of interest.
Coal Price (Php/ton)-Required field is comprising of
daily Coal Price information for delivery in the region.
Has to reflect prices for specific location and timeframe
of interest.
Oil Price (Php/barrel)-Required field is comprising of
daily Oil Price information for delivery in the region.
Has to reflect prices for specific location and timeframe
of interest.
Page26of27 .
I
% ?*
\
EOF
I
t NOTES:
Page27 of27
o