COLUMN DETAILS
Col Size Up To Main R/F Ties
FIRST FLOOR BEAM /SLAB LAYOUT
0.3L MIDDLE STIRRUPS 0.3L 0.3L 0.1 L1
0..3 L1
0..15 L1
0.3 L2
0.15 L2
0.1 L2
C
END STIRRUPS
400x400 Second floor 8 - #16mm 8mm @ 125/175mmC/C FIRST FLOOR SLAB DETAILS EXTRA AT TOP
TOP. BARS
TYPE THICK- MAIN REINFORCEMENT

SLAB
FIRST FLOOR BEAM DETAILS Ld Ld
NESS ALONG SHORTER SPAN ALONG LONGER SPAN 0.15 L1 0.25 L1 0.25 L2 0.15 L2
SIZE TYPE MAIN REINFORCEMENT L1 L2
SHEAR S' CANTILEVER 125mm L 0.7L
BEAM

(mm) TOP BOTTOM 10mm @175mm C/C 10mm @175mm C/C BOT. BARS EXTRA AT
REINFORCEMENT BOTTOM
THR. EXTRA THR. EXTRA S ONE WAY 125mm 10mm @150mm C/C 10mm @175mm C/C
B1 300 X 450 CANTI. 3-16# 2-16# 3-12# -- 8#- TLS @ 125mm C/C S1 TWO WAY 125mm 10mm @175mm C/C 10mm @175mm C/C
B 300 X 450 3-16# 2-16# 3-12# 2-12# 8#- TLS @ 125mm C/C S2 WAIST SLAB 150mm 12mm @100mm C/C 10mm @150mm C/C
DESIGN CONSULTANT: CLIENT : FOR SUBMISSION TITLE :
UJJAIN ENGINEEERING COLLEGE, LAYOUT AND DETAILS OF FIRST FLOOR BEAM AND
Secretery, KUM samiti, Ujjain FIRST FLOOR SLAB FOR AUCTION PLATFORM
UJJAIN, (M.P.)
AT FRUIT MANDI PRANGAN, KUM, UJJAIN
PROJECT :
DRG. NO. :- uecu/civil/comsul./04/05/2022
CONSTRUCTION OF AUCTION PLATFORM IN FRUIT MANDI
AT KUM SAMITI PRANAGN, UJJAIN
FOR KUM, SMAITI, UJJAIN) REVISION No: