You are on page 1of 10
872122, 9:28 PM Report Part 1 APPENDIX I (See Paragraph-6) FORM 1 Note : If space provided against any parameter is inadequate, Kindly upload supporting document under ‘Additional Attachments if any’ at the last part of the Form1. Please note that alll such Annexures must be part of single pdf document. (1) Basic Information S.No. | Item Details Is your project Comes under Notified Industrial Area Ne Whether proposal involved violation of EIA | yy, notification Weather Consent to Establishment NA Obtained Upload copy of CTE N/A ‘SOCIO CULTURAL CENTRE PROJECT Annexure-Brief summary of project Name of the Project/s Brief summary of project Proposal Number TA/DLIMIS/147252/2020 Project Cost 35000 lacs. 2. | S.No. in the schedule |8(b) Townships and Area Development projects. | Project Sector INFRA-2 | Proposed capacity/area/length/tonnage to 3. | be handled/command area/lease 226154 sqm Built Up Area ha area/number or wells to be drilled 4. | New/Expansion/Modernization |New 5. | Existing Capacity/Area etc. Oha 6. | Category of project i.e. 'A’ or 8’ A Does it attract the general condition? If 7. No yes, please specify 8. | Does it attract the specific condition? If |, yes, please specify 9. | Location of the project | Sector 10, Rohini, Delhi Shape of the project land [Block (Polygon) Uploaded GPS file nnexure-Gpsfile Uploaded copy of survey of India Toposheet| Annexure-Survey of india toposheet Plot/Survey/Khasra No. | Sector 10, Rohini, Delhi Town / Village | Sector 10, Rohini, Dethi | State of the project [etn | Details of State of the project ‘S.no ‘State Name District Name Tehsil Name (1) [Delhi North West ‘Saraswati Vihar 10. | Nearest railway station along with distance | Badli Railway Station, 4 km ‘environmentelearance.nic in/sutFORM_A_POF aspxcat_id=IA/OLIMISI14725220208pid=New ano 12122, 0:26 PM Report Par 1 in kms | | Nearest airport along with distance in kms |Indira Gandhi International Airport, 16.2 km | Nearest Town/City/District Headquarters 14- | along with distance in kms Pooth Kalan » 3.16 km Village Panchayats, Zila Parishad, Muncipal 12. | Corporation, Lecal body (complete poster” | NOMC office Rohini Institutional Area, Sector 5, Rohini, Delhi, 110085 address with telephone nos. to be given) 13. | Name of the Applicant Sunil 14, | Registered Address 397, Kohat Enclave, Pitampura, Delhi Address for correspondance: ! Name of the Company | M/S MERITON TOWERS PVT LTD | Name of the Applicant Sunil | Designation (Owner/ Partner/ CEO) Director | Pin code [110034 | 1s. | E-mail | meritontowerso1@gmail.com | Telephone No. 011-40040880 | Fax No o1- | Copy of documents in support of the competence/authority of the person /Annexure-Uploaded Cony of documents in support of the making this application to make application | competence/authority, on behalf of the User Agency 16. | Details of Alternative Sites examined, if any. Location of these sites should be | No shown on a toposheet 17. | Whether part of Interlinked projects? No 1g, | Whether separate application of interlinked | yy, project has been submitted? 19. | IF Yes, MoEF file number NA Date of submission [Nya 20. | If No, Reason NA 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given (i) Whether the proposal involves approval/clearance under the Forest No (Conservation) Act,1980? ii) Whether the proposal involves approval/clearance under the wildlife No (Protection) Act,1972? {ili) Whether the proposal involves approval/clearance under the C.R.Z No notification, 2011? 22. | whether there is any Government No Order/Policy relevant/relating to the site? 23. | Whether any Forest Land Involved? No ‘Area of Forest land Involved (hectares) |N/A 24. | Whether there is any litigation pending against the project and/or land in which the| No project is proposed to be set up? (2) Name of the Court NA (b) Name of the Sub court ZN (c) Case No. [wa ‘environmentclearance.nic in/sutFORM_A_POF aspx?cat_id=IA/OLIMISY147252/20208pid=New 210 872122, 9:28 PM. (d) Orders/directions of the court, if any and relevance with the proposed project (II) Activity N/A Report Part 1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bot S, etc.) ‘S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with ‘source of information data ‘environmentelearance.nic in/sutFORM_A_POF aspx7cat_id-IA/OLIMISY147252/20208pid=New Permanent or temporary change in land Land has been entitled for commercial purposes as per 1.1 | Use, land cover or topography including | ygg | land use (Master plan of Delhi 2021). So there is no increase in intensity of land use (with permanent change in land use, land cover or respect to local land use plan) topography. 1,2 | Clearance of existing land, vegetation and | yy, | The construction of project does not require any buildings? clearance of existing Land, Vegetation & Building 1.3 | Creation of new land uses? No | No new creation of land uses 1.4 | Pre-construction investigations e.g. bore | yg | Soil testing details will be submitted along with the houses, soil testing? EIA/EMP report. All construction activities will be confined within the 1.5 | Construction works? Yes | project premises; there will be no physical changes outside the project boundary. 1.6 | Demolition works? Yes | No demolition work is required. All the construction activity including stocking of raw ‘i terials will be confined within the project site only. ‘Temporary sites used for construction ma 17 Yes |.No temporary labor hutments are proposed. Local works or housing of construction workers? labors from nearby area will be hired. Sanitation facilities will be developed at site. Excavation will be carried out for foundation of Above ground buildings, structures or c ‘ qeetwrks Including anear structures, cut buildings. The excavated soil will be used in backfilling oe ee ca nea sil oe Yes | and other area development activities. The quantity of eaten. excavated soil (Ground coverage * 3.5) approx. 77,133 m3, 1.9 | Underground works including mining or | 1, | No underground works including mining/ tunneling will tunnelling? be undertaken except excavation of earth. 1.10 | Reclamation works? No | No reclamation work required 1.11 | Dredging? No | No dredging required 1.12 | Offshore structures? No | No offshore structures required 1.13 | Production and manufacturing processes? | No | Not applicable Raw material will be stored at site in a covered area. i Cement will be separately stored under cover in bales. ilities for storage of goods or materials? | Yes 1.14 | Facilities for storage of goods or materials? | Yes | cong will be stacked neatly under tarpaulin cover. Bricks and stee! will be laid in open. 1.15 | Facilities for treatment or disposal of solid | Yes | Solid Waste: The solid waste generated from the waste or liquid effluents? project will be In the form of: Construction Waste: Left over cement and mortars, cement concrete blocks, aggregate, sand and other inorganic material were recycled and reused as granular subbase (GSB) layer ‘of pavement. Earth rendered surplus from the excavation will be utilized in the embankment works. Operational Phase: The total solid waste generated 30 872122, 9:28 PM. Report Part 1 from Multilevel Car Parking Complex project is estimated to be approx. 10,017 kg per d Facilities for long term housing of Local laborers will be hired from nearby areas during 1.30 ‘environmentelearance.nic in/sutFORM_A_POF aspx7cat_id-IA/OLIMISY147252/20208pid=New Loss of native species or genetic diversity? No 1.16 | Cperational workers? No | construction phase. So, there will be no facilities for long-term housing of operational workers. The project site is well connected through NH-10 which is approx. 4.55 km towards SSE direction from project site. Only internal roads; paths will be 1.17 | New road, rail or sea traffic during No | developed for vehicular movements for transportation construction or operation? ‘of construction material during construction phase whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational phase. The project site is well connected through NH-10 which is approx. 4.55 km towards SSE direction from New road, rail, air water borne or other project site. Only internal roads; paths will be 1.18 | transport infrastructure including new or | 4. | developed for vehicular movements for transportation altered routes and stations, ports, airports ‘of construction material during construction phase ete? whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational phase. Closure or diversion of existing transport 1.19 | routes or infrastructure leading to changes | No | No closure or diversion of existing traffic involved. in traffic movements? New or diverted transmission lines or There are not been any new/diverted transmission 1.20 No pipelines? lines or pipelines around the project. Impoundment, damming, culverting, No impoundment, damming, culverting, realignment 1.21 | realignment or other changes to the No |or other changes to the hydrology of surface hydrology of watercourses or aquifers? watercourses. 41.22 | Stream crossings? No | There are no streams running across the site. 1.23 | Abstraction or transfers of water from No | No Ground water extraction will be done ground or surface waters? Runoff will increase due to increased paved surface. 4.24 | Changes in water bodies or the land Yes | However, increased runoff will be managed by well- surface affecting drainage or run-off? designed rainwater harvesting system and storm water management plan. During the construction phase, about 15-20 trucks are Transport of personnel or materials for estimated per week, Adequate parking space nearby 41.25 | construction, operation or Yes | the project site for loading and unloading of materials decommissioning? will be provided. Adequate parking space (1600 ECS) will be provided for operational phase in the premises. 1.26 | Long-term dismantling or decommissioning | 4 |No Long term dismantling or decommissioning or or restoration works? restoration works will be involved. Ongoing activity during decommissioning 1.27 | which could have an impact on the No | None environment? Local laborers from nearby area will be employed during the construction phase. In the operation phase, 1.28 | Influx of people to an area in either No | most of the occupants will be from the surrounding temporarily or permanently? areas. Hence, the project led to a redistribution of occupants within the city. Thus, there will be no significant influx of people was envisaged The landscaping will be carried out with mainly local 1.29 | introduction of allen species? No | SPecies with a few ornamental varieties of flora that ‘are well suited to the local conditions like Grevillea robusta, Cassia fistula, Bauhinia varieagata, etc. There will be no significant impact on the native ano 812122, 9:26 PM Report Part 1 species or genetic every. 1.31 | Any other actions? Wo [Not Appicabe 2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): ‘S.No Details thereof (with approximate Information/Checklist confirmation | Yes/No| quantities/rates, wherever possible) with Cand has been ented for commercial purposes a5 per 2.1 | Land especially undeveloped or agricultural | jy, | land use (Master plan of Delhi- 2021). So there is no land (ha) permanent change in land use, land cover or topography. During operation phase, water supply wil be provided az | Wate expected source a competing users) | ya | trough te 1B, About 498 KLD of sh wotar wl be * required during operation phase of the project. 23 | moras om ‘Ye | Minerals such os sand and aggregates wil be reauired turing the construction phase 3.4 | constration material ~ stone, aggregates, | yq, Al matenals for construction wil be aranged through sand / soil (expected source - MT) ‘select suppliers. este and tmborfnurce ~ | Forest products such es timber produce are at 2.5 | Forests and timber (source - MT) Ne required. The total demand load is estimated tobe 27,681 WA Energy including electricity and fuels Power will be supplied by TATA Power Ltd. It is 2.6 | (source, competing users) Unit: fuel Yes | proposed to provide 14 no. of DG sets of combined (vtyereray i) Spotty 28000 KVA (44 x 2000 FVA) for power back oP Any other natural resources (use to | Not Applicable 27 appropriate standard units) No | Not Applicabl Use, storage, transport, handling or production of substances or materials, which could be 3. harmful tohuman health or the environment or raise concerns about actual ar perceived risks to human health SN Details thereot (with approximate Information/Checklist confirmation | Yes/No| quantities/rates, wherever possible) with source of information data Use of substances or materials, which are Diesel for DG set will be stored in closed HDPE drums 3.1 | hazardous (as per MSIHC rules) to human | y. | in earmarked locations. It shall also be handled as per Realtor te envionment (er, fan, The Manufacture, sorege and Tnpor of Hecareous dre wer supplies Chemical Ruts, {989 ones farthor smendments Suitable crinage and waste monagement measures Changes in occurence of disease or affect. | | mil be adopted in oth, the construction and 3,2 | disease vectors (e.g. insect or water borne | No | Operational phase such that there will be no stagnal disease v Gf wate or accumulation of waste, This wil efecvely rest, the reproduction and growth of seese vectors Socio-economic standard of people wil improve due to increased avec and secondary amployment 3.3 | Mfect the welfare of people e.9. by ves | opportunities provided by this project, This wl lead to better quality of life and will also set a standard for future developments nthe are 3:4 | Vulnerable groups of people who could be | No | impacts ofthis type are not expected. ‘environmentelearance.nic in/sutFORM_A_POF aspxcat_id=IA/DLIMISY14725220208pid=New 510 ae oan for Pat affected by the project eg, hospital patients, chitren, the elderly et 35 | Any other causes No [Nt Applicable 4 Production of solid wastes during construction or operation or decommissioning (MT/month) No Detalls thereat (with approximate Information/Checklist confirmation | Yes/No| quantties/rates, wherever possible) with ‘Source of information data ci, overburden or mine wastes [so such spol, overburden or mine wastes will be 4.1 | spot, overourd ste wo | Ro eh The total sold waste to be generated 1s approx 10,017 ko/day. Blodegredable waste, ©40% 4006.8 42 Municipal waste (domestic and or Yes kg/day (Waste vegetables and foods and landscape wastes) waste, and etc.) Recyclable waste @50% 5008.5 kg/day (cartons, thermocol, plastics, glass etc.) Inert waste @10% 1001.7 kg/day Total 10,017 kg/day The hazardous wastes along with other wastes Inthe project wll be used ol fom OG sets, whichis Erased os per the Harardovs Waste Category 5.1 25 per The Hazardous Wastes (Management, Handling & 4.3 | Hazardous wastes (as per Hazardous Waste | yes ransnoundary Movement) Rules, 2018, Used ol rom a DG set will be stored in HDPE drums in isolated Covered facilty Ths Used ol wil be sold to authorized reaver, Sutoble core will be taken so that Spilseaks of used from Storage are avelded 4c | Other industrial process wastes No | Not applicable 45 | Surplus product No | Not applicable 46 Sewage sludge or other sludge from No ‘The waste water generated from the project site will efvent treatment be weatad in an onate STP The constriction waste will consist of excess earth and Construction debris along with cement bogs, ste! in bits and pleces, insulating and. packaging. materials 4.7 | Construction or demotion wastes ves ete. Reeyloble waste construction meters wl be Seld to reqylers, Unusable and excess, construction debris wil be esposed at designated places in tune with the local norms 1.8 | Redordant machinery oF eutpmee No | Redundant machinery will nat be generated ‘co |Comamnatad-solsorotmermaterae | no [Contaminated soils or other materals wil not be seneratea 4.10 | Agricultural wastes Yes | Landscape wastes of 0.54 kg/day will be generated. 4:11 | Other sold wastes no [ Not Applicabe 5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) ‘S.No Details thereof (with approximate Information/Checklist confirmation | Yes/No quantities/rates, wherever possible) with Source of information data Emissions fom combustion of oss fuels | es |The proect does not envisage any major air polation ffom stationary or mobile sources Sources except operation ef OG. set during, power ‘environmentelearance.nic n/sutFORM_A_POF aspx?at_id=IA/OLIMISY147252/20208pid=New a9 872122, 9:28 PM. Report Part 1 fallure and vehicular traf nisione trom production pr «a | No production processes involved, Hence, there willbe 5.2 | Emissi from production processes No | no such emissions, ‘Small quanties of fugitive emissions wil be envisaged Emissions trom materials handling including | ygg | during transport and hendling of material. Such sa ves storage or transport temissions wll be temporary and controled by the use OF sprnking and other viable techniques Emissions from construction activities “This wl be restricted tothe construction phase and sa ves inetaing plant and equipment the construction site ony Dust i= anticipated during loading and unloading of Dust or odours from handling of materis |_| construction material and excavation of upper earth 5.5 | Including construction materials, sewage ‘Yes i porary te and waste controlled by providing water sprinklers. Tarpaulin Cover wil be provided on stored loose materials to reduce the dust emission. 5:6 | Emissions from incineration of waste No | No incineration of wastes Is proposed +37 | Emissions from burning of waste in open air| y | Open burning of biomass/other material will be (erg. slosh materials, construction debris) prohibited on ste 5:8 | Emissions from any other sources No | Not Applicable 6 Generation of Nolse and Vibration, and Emissions of Light and Heat: S.No Information/Checklist confirmation Details thereof (with approximate Yes/No| quantities/rates, wherever possible) with ‘source of information data 61 From operation of equipment e.g. engines, ventilation plant, crushers Yes ‘Source of noise in the operational phase will be from backup DG set (which will be in operation only during Power failure) and pumps & motors. All the machinery will be of highest standard of reputed make and will comply with standard. 6.2 From industrial or similar processes No No industrial processes will be carried out in the project, 63 From construction or demolition Yes Due to various construction activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities included the following noise generating activities: « Concreting, mixing & operation of DG set. + Construction plant and heavy vehicle movement. 6.4 From blasting or piling No No blasting or mechanized piling will be done. 65 From construction or operational traffic Yes Some noise will be generated from vehicular movement in the construction and operational phase but that will be mitigated with green belt. 66 From lighting or cooling systems No No significant noise impact will result from lighting or cooling systems. 67 From any other sources No Not Applicable Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: ‘environmentelearance.nic n/sutWFORM_A_POF aspx? 'S.No| Information/Checklist confirmation | Yes/No | Details thereof (with approximate ‘NOLIMIS/147252/20208pi1-New m0 872122, 9:28 PM Report Part 1 environmentclearance.nicnvauth/FORM_A_ PDF aspx?cat_d=INDLIMIS/147252/20208 pi quantities/rates, wherever possible) with The used oll from DG set will be carefully stored in HDPE drums at isolated storage, and periodically sold 7.4 | From handling, storage, use or spillage of | 4, | to authorized recyclers. all precautions will be taken to hazardous materials avoid spillage from storage as per The Hazardous Wastes (Management, Handling & Transboundary Movernent) Rules, 2016. From discharge of sewage or other There wastewater will be treated in an onsite STP and 7.2 | effluents to water or the land (expected | No | treated effluent will be reused for Flushing, mode and place of discharge) Horticulture, HVAC Cooling & DG Set, The DG Set will be provided with stack of adequate 7.3 | BY deposition of pollutants emitted to air | y., | height, Hence dispersion will be achieved and avoid into the land or into water deposition of pollutants in significant concentrations at any single location, 7.4 | From any other sources No | Not Applicable Is there a risk of long term build up of 7.5 | pollutants in the environment from these | No | Not Applicable sources? 1g Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.No Details thereof (with approximate Information/Checklist confirmation | Yes/No| quantities/rates, wherever possible) with source of information data From explosions, spillages, fires etc from To deal with any fire related accident, fire fighting 8.1 | storage, handling, use or production of —_| Yes | facility of single handed hydrant valve, long hose reel, hazardous substances and portable fire extinguisher will be provided. 8.2 | From any other causes No | Not Applicable Could the project be affected by natural The project falls under seismic active Zone IV 9,3 | disasters causing environmental damage | yaq | indicating High damage risk zone. The building will be (c.g. floods, earthquakes, landslides, designed as earthquake resistant and comply with the Cloudburst etc)? required IS specifications. Factors which should be considered (such as consequential development) which could lead to 9 environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate S.No| Information/Checklist confirmation | Yes/No| quantities/rates, wherever possible) with source of information data Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e. 9 Appropriate infrastructure like roads, power supply, @ Supporting infrastructure (roads, waste management and waste water treatment will be 9.1| power supply,waste or waste water _| Yes | developed within the project site, Development of the treatment, etc.) area will be as per Master Plan for Delhi, 2021 notified @ housing development in Gazette of India Not Applicable © extractive industries @ supply industries © Other 9.2 | Lead to after-use of the site, which could | No | Not Anticipated sit0 872122, 9:28 PM. Report Part 1 ‘environmentelearance.nic in/eutFORM_A_POF aspxcat_id=IA/OLIMISY14725220208pid=New have an impact on the environment The project will provide good infrastructure and better 9.3 | Seta precedent for later developments | ves | life “style and. will set’ an example for later developments in the areas. Have cumulative effects due to proximity to 9.4 | other existing or planned projects No | Not Applicable with similar effects (111) Environmental Sensi Aerial distance (within 15km.) ‘S.No Areas Name/Identity Proposed project location boundary Areas protected under international conventions, national or loca legislation ° + Vor their ecological, landscape, cultural or Ne None other related value reas which are important or sensitive for Central Ridge RF - 11.10 km (SE) Sultanpur Areas which are important or sensi fe Dabas RF- 10.6 km (NW) Bawana RF - 11 km 2. | ecological reasons - Wetlands, Yes | (NNW) Ghoga RF - 12.57 km (NNW) Northern watercourses or other water bodies, coastal 9 Zone, biospheres, mountains, forests Ridge RF - 10.30 km (ESE) Najafgarn Drain - " " " 6.25 km (S) Yamuna River - 11.35 km (East) ‘Areas used by protected, important or 3 | sensitive species of flora or fauna for no | None breeding, nesting, foraging, resting, over wintering, migration 4 |fland coastal; marine or undereround | yas | Ground Water = Sem cri category UP state boundary - 11.95 km (NE) away from 5 | State, National boundaries No: the project site. Haryana state boundary - 14.35 km (NNW) away from the project site Routes or facilities used by the public for NH-1 - 4.70 km (ENE) away from the project 6 | access to recreation or other tourist, Yes site. NH-10- 4.55 km (SSE) away from the pilgrim areas project ste 7 | Defence installations Yes _ | Delhi Cantonment - 12.40 km (S) away from the project site 8 | Densely populated or built-up area Yes | Rithala - 1.0 km (W) away from the project site Rajiv Gandhi Institute & Reserch Centre - 0.25 km (S) Ambedkar Hospital - 0.45Km (ESE) Guru Areas occupied by sensitive man-made Nanak Dev Institute of Technology + 1.35 km 9. | land uses (hospitals, schools, places of yes | (NE) Rana Pratap Govt. Boys & Girls Se. Sec worship, community facilities) ‘School- 0.9 km (SW) Mount Abu Public School - 0.5 km (S) shri Jagannath Mandir - 1.60 km (WNW) Sai Baba Mandir - 1.40 km (ESE) Areas containing important, high quality or scarce 10 | resources. (ground water resources,surface Yes | Ground Water - Semi critical category resources, forestry agriculture fisheries, tourism minerals) Areas already subjected to pollution or 41 | environmental damage.(those where No | There are no areas within 15 km which are existing legal environmental standards are subjected to pollution or environmental damage. exceeded) 12 | Areas susceptible to natural hazard which | Yes _| Earthquakes - The site fas under the zone IV as, could cause the project to present per the Seismic Zone Map of India and is thus environmental problems (earthquakes, prone to high damage risk zone, Adequate 90 872122, 9:28 PM. Report Part 1 subsidence, landslides, erosion, flooding or measures will be taken during the construction of extreme or adverse climatic conditions) the project, similar effects (IV) Proposed Terms of Reference for EIA studies 1 | Uploaded Proposed TOR File Annexure-TOR file 2. | Uploaded scanned copy of covering ‘Annexure-scanned copy of coverin letter Annexure-scanned copy of cover letter 3 | Uploaded Pre-Feasibility report(PFR) | Annsxure-PER 4 | Uploaded additional attachments(only | j....yre-acitona attachments single pdf file) I Detail Sought : NIL ional Detail Sought : NIL (V) Undertaking Thereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Name of Applicant {unit Designation [Director Name of Company (Applicant Name should not be given here) Address |397, Kohat Enclave, Pitampura, Delhi M/S MERITON TOWERS PVT LTD ‘environmentclearance.nicinvauth/FORM_A_ PDF aspx?cat_d=INDLIMIS/147252/20208 pi 10110

You might also like